Compact Radio Frequency Technology for Applications in Cargo and Global Security Graeme Burt Lancaster University, Cockcroft Institute, Security Lancaster.

Slides:



Advertisements
Similar presentations
Compact RF Cavity Development at the Cockcroft Institute Dr G. Burt Lancaster University & Cockcroft Institute CI SAC meeting October 2012.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Design of Standing-Wave Accelerator Structure
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Status of X-band program at RadiaBeam
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
THE TOP LINAC PROJECT ISS-ENEA Project to demonstrate operability of a compact proton linac in a medium size hospital HIGH POWER RF TESTS OF THE FIRST.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Visits to Chinese accelerator companies Peter Pearce (April 2004) Two companies were visited. Beijing Medical Equipment Institute at Chongping and Beijing.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Low Emittance RF Gun Developments for PAL-XFEL
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
CLIC meeting, Prospects for developing new tubes I. Syratchev, CERN.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Linacs for Cargo Screening Dr Graeme Burt Lancaster University, Cockcroft Institute CERN High gradient Day 2015.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
State-of-the-Art Accelerator Technology Peter McIntosh, STFC HEPTech Environmental Applications of Accelerators 9 th July 2013.
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
Progress in unconventional RF structures Dr Graeme Burt Cockcroft Institute, Security Lancaster, Lancaster University.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
ALBA RF Systems Francis Perez.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Heung-Sik Kang Pohang Accelerator Laboratory
Beam dynamics and linac optics studies for medical proton accelerators
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
Lancaster University, Cockcroft Institute, Security Lancaster
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Dr G Burt, STFC Lecturer Lancaster University / Cockcroft
Asymmetric Dual Axis Cavity for ERL: recent developments and possible applications I.V. Konoplev1, A. Seryi1, A. Lancaster1, K. Metodiev1, G. Burt2 and.
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
An X-band system for phase space linearisation on CLARA
Status and prospects of VEPP-5 Injection Complex
Status of the CLIC main beam injectors
Physics design on Injector-1 RFQ
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Developments on Proposed
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
Part2: Cavities and Structures
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
C. Ronsivalle, L. Picardi, C. Cianfarani, G. Messina, G. L
CEPC RF Power Sources System
Status of the CLIC Injector studies
Part2: Cavities and Structures
MEBT1&2 design study for C-ADS
Physics Design on Injector I
CLIC Feasibility Demonstration at CTF3
Breakout Session SC3 – Undulator
Presentation transcript:

Compact Radio Frequency Technology for Applications in Cargo and Global Security Graeme Burt Lancaster University, Cockcroft Institute, Security Lancaster

Cargo Screening Accelerators Luggage Scanning requires a few tens to hundreds keV. This can be delivered by traditional X-ray tubes up to 450 keV. Truck or shipping cargo is larger requires ~6 MeV. Industrial linacs can provide this. Aircraft ULD or pallets are too large for baggage scanners and too small for cargo scanners. Currently searched by hand. Ideal energy is around 1-2 MeV but no current source available.

Lancaster University: – Graeme Burt (Project Leader) – Praveen Ambattu (Linac) – Chris Lingwood (Linac) – Tom Abram (Mechanical) – Mike Jenkins (Linac) STFC, ASTeC Daresbury Lab: – Ian Burrows (Mechanical Eng.) – Clive Hill (Mechanical) – Peter Corlett (Project Manager) – Andrew Goulden (Cooling Sys.) – Paul Hindley (Installation) – Peter McIntosh (ASTeC PI) – Keith Middleman (Vacuum) – Rob Smith (Beam Diagnostics) – Chris White (Electrical Eng.) – Trevor Hartnett (Electrical) – Steve Griffith (electrical) CLASP Ph-I Collaboration Team

CI-SAC Dec 2011 X-band Linac schematic DC Electron Gun e2V Buncher and Accelerating Structure (1 MeV) Magnetron e2V (9.3 GHz, 1.2 MW, Hz) Dynamic switching of amplitude and phase pulse-to-pulse) Automated Control System (Energy, rep-rate, dose) CI Proposal Scope Phase-I X-ray Target

Why X-band? For a mobile linac mounted on a robotic arm the weight of the linac is critical. While the linac isn’t very big or heavy the shielding is. X-band means that the shielding diameter is much less. Area of shielding is given by (2r cav t shield + t shield 2 )  Availability of 9.3 GHz magnetrons

CLIC crab Cavity Lancaster has some experience in X-band from the CLIC crab cavities. A prototype of this cavity has recently been manufactured and tuned at CERN and is awaiting a testing slot in XBox2.

Linac options Side coupled pi/2-mode pi/2 >> frequency stability especially in the presence of large number of cells Shunt impedance comparable to pi-mode Large transverse size due to coupling cells Bi-periodic pi/2-mode pi/2 >> frequency stability especially in the presence of large number of cells Shunt impedance less than side- coupled structures pi-mode Hard to tune coupling cells and are sensitive to brazing tolerances

1 MeV Linac Design 5 mm beampipe diameter 3.5 mm iris thickness 1 mm coupling cell thickness Gradient (MV/m)E (MeV)I beam (mA)Spot Size (mm) 20 (nom) %+11 %-4 %+58 % -10%-27 %-33 %-55 % Voltage (kV)E (MeV)I beam (mA)Spot Size (mm) 17 (nom) %+0.8 %-3.5 %+48 % -10%-7 %-20 %-15 % ParameterValue Energy1 MeV Frequency9.3 GHz Length130 mm R sh max 116 M  /m P in 433 kW Pulse Length 4  s Pulse Rate250 Hz Peak Beam Current70 mA Average Beam Power70 W

Particle Tracking initially performed in ASTRA. Collaboration with Tech-X UK to verify Linac electron beam capture and tracking. Using VORPAL code to validate PIC transport. Good comparison was found between both methods. Beam Tracking Analysis

Fabrication commissioned with UK industry: – Shakespeare Engineering, Ltd Geometric tolerances of 10  m required. Diamond machining and vacuum brazing processes employed. Linac Fabrication

Cavity Tuning Structure was found to have poor matching and field flatness. Low beta cells were further off frequency than could be tuned. Ideal profile

17 keV Electron Gun from E2v A 17 keV electron gun was specially designed for this project from a TWT gun. The gun was modified to provide 200 mA with a 1mm spot size. Gun has been successfully tested at Daresbury. Substantial ringing is found on the ICT due to EM interference from pulse operation.

E2V engineers acceptance tested the magnetron at Daresbury. Maximum power achieved ~ 1.1 MW but not sustainable due to arcs. Operating at long pulse lengths (4 us) and high power (>1 MW) results in significant arcing within the magnetron. Magnetron Testing

In order to fully diagnose the beam from the linac we have a diagnostics line fitted to the output. We have a motorised section which can either provide a slit, a screen, a tungsten target or vacuum. Diagnostics Line

Imaging and testing Conveyor system set up in the linac area to perform full system characterisation in a realistic environment. Detector system developed by a local scanning company. Good quality full scale imaging requires dose of at least Hz

Linac Testing So far the linac has produced a 750 keV, 1 mA beam as measured on the spectrometer and Faraday cup/ICT at the end of the diagnostics line (probably large beam loss prior to this). This is limited by the cavity being slightly out of tolerance affecting the fields. So far the linac has produced a 750 keV, 1 mA beam as measured on the spectrometer and Faraday cup/ICT at the end of the diagnostics line (probably large beam loss prior to this). This is limited by the cavity being slightly out of tolerance affecting the fields.

Learning Curve Improvements to Mk II design – Less rounding on equator to allow less stiffness, more tuning range – Re-entrant first cell to reduce stiffness, increase tuning range – Larger cell-to-cell coupling – Longitudinal cooling pipes, more room for tuning pins – Move coupler to centre cell

Modified structure New 490 MHz wide Old 60 MHz wide We have developed a new X-band structure with much greater cell-to-cell coupling to increase tolerances. Simple structure design with no slots to help tolerances (low fields and low voltage make this acceptable) Contract placed with Comeb Mode 8

Harmonic W-band Klystron There is also interest in millimetre wave and THz scanning of personnel. For this application we have been developing a 105 GHz Klystron. To avoid issues with poor scaling of Klystrons to high frequencies we use a 3 rd harmonic output cavity. 35 GHz input and intermediate cavities 105 GHz output cavity

To increase the size of the output cavity such that it could be made from conventional machining we use a higher order mode cavity (TM020-like) Mm-wave upconverter Input coupler 31GHz Output coupler 94GHz

Harmonic W-band Klystron Structure casted in Silver from a 3D printed hard plastic mould. Allows better material quality, tolerances and surface roughness than direct 3D printing in metal. Initial prototypes are promising.

Conclusion A strong UK collaborative team has been formulated to successfully demonstrate a working system solution. Challenging requirement to develop and demonstrate a gun, magnetron and 1 MeV linac system within 18 months. Major development successes: – An optimised 17 keV, high peak current electron gun has been designed, fabricated and activated. – A highly compact combined buncher/accelerating structure has been designed. – High precision fabrication has been demonstrated for the complex linac geometry. – The linac system has been assembled and has so far produced 750 keV electron beam at 1 mA. Also developing high frequency sources for imaging