MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.

Slides:



Advertisements
Similar presentations
Monitoring a web sites health. Web Analytics - Definition Measurement of the behavior of visitors to a website Which aspects of the website work towards.
Advertisements

SupportCenter Plus Product Overview. Overview 1.What is SupportCenter Plus (SCP) 2.Benefits of SCP 3.Licensing & Pricing 4.Questions.
Space Missions Can Your Library Automation Software Do This? David Hook MDA
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
North Carolina Department of Public Instruction Transportation Services December 2014 Craig Warren Transportation Consultant Inventory Training Module.
1 The Database Application Development Process The Database Application Development Process.
R. I. T Mechanical Engineering Engineering Design Brief Case Study: What is the Engineering Design Process and Why is it Critical? Rochester Institute.
Chapter 2.
IT PLANNING Enterprise Architecture (EA) & Updates to the Plan.
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
Training Guide. The Punch Out Catalog System The Punch Out shopping catalog for VWR takes the user directly into the vendor’s website and online catalog.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
COSO Framework A company should include IT in all five COSO components: –Control Environment –Risk Assessment –Control activities –Information and communication.
Analyzing the Business Case
DT211 Stage 2 Software Engineering
8 Systems Analysis and Design in a Changing World, Fifth Edition.
SMALL BUSINESS MANAGEMENT ERP SOFTWARE BY COPY RIGHT BY
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
BSIT 4106 Airline Travel System 11 – A.  The goal of the study is to develop an automated procurement and inventory system  The system will focused.
North Carolina Department of Public Instruction Transportation Services December 2014 Craig Warren Transportation Consultant Inventory Training Module.
© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1  This presentation provides a general overview of using the Service Access.
Guide Workshop Tuesday, August 19, Agenda I.MSD Fall 14 Logistics Werth –45 minutes 1.Class Schedule high level 2.Grading Period Highlights 3.MSD.
S/W Project Management
Project ManagementDay 1 in the pm Project Management (PM) Structures.
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
Chapter 4- slide 1 Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall MKT 202, TMT Managing Marketing Information to Gain Customer Insights.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
Lecture Outline 5 Manufacturing Systems (Production and Operations Management) p. 304+
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
Project Management Models
Client/User Analysis Website Design. 2 Questions to be answered: What is the purpose of the site? What is the purpose of the site? Who is the site for?
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 1 Project Statement of Work Outline.
S9k Production Floor System Ingredient Inventory Production Inventory Production Dashboard.
Project Active Vibration Cancellation. The Team NameDisciplineRole Kaitlin PeranskiIndustrial and SystemsProject Leader/ Edge Updating Jeremy BerkeElectricalScribe.
Our goal is to make a web based multi-user organizer that can be accessed via cellular devices. There are three main component for this project: A main.
Develop Project Charter
Training Guide. The Punch Out Catalog System The Punch Out shopping catalog for Gateway takes the user directly into that vendor’s website and online.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
MyFloridaMarketPlace Vendor Performance Tracking Overview: Vendor Interface February 23, 2006.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
MSD Total Supplier Performance and Inventory Control
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Publishing Services Bureau Web Communications Services Tips for managing the publication process Communications Workshop October 23, 2003.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
Information Technology Project Management, Seventh Edition.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
1 Advanced Computer Programming Project Management: Basics Copyright © Texas Education Agency, 2013.
Different Purposes for Web Pages Education –Content must be timely, accurate and appealing. Can also provide feedback, maintain records (IC) and can also.
Melissa Nipper, BEAM Business Services Coordinator
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Multidisciplinary Capstone Design:
MINGGU KE 9: PROSES DESAIN PRODUK BARU
Bar Coding/Asset Tracking Implementation
Project Readiness Review P10029 – Air Muscle Artificial Limb
Different Purposes for Web Pages
Final Project Plan P09004 – Eye Movement Tracking Device
Texas Woman’s University
Definition IPPF Audit Standard 2120 – Risk Management
Presentation transcript:

MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard

Overview Subsystem Level Design Review Goals Updated Risk Analysis Expert Feedback / Opportunities Current State Analysis SKU Rationalization Prototype Testing Plan Prototype Discussion

SubSystem Level Design Review Goals During the subsystem level design phase the team plans to continue developing prototypes of the purchasing and tool loan out software. Web space on the RIT web server will be requested to begin creation of a MSD specific website. Time studies will be performed to document the current state and identify additional areas for improvement. A testing plan will be created to document how the team will receive feedback on the current prototypes.

Updated Risk Analysis Likelihood of Occurrence Reduced Benchmarking risk – reduced to 0 Unable to obtain web space – reduced to 0 Newest Concerns Capturing accurate current state data Quantity of surplus materials

Expert Feedback / Opportunities Contacted McMaster- Carr: Do not offer Contacted Grainger: Setting up meeting for next week to discuss Contacted Supply Point: Waiting on Response

Current State Analysis Began collecting data to document the current state Benchmarked the current purchasing procedure by creating a “ mock ” purchase requisition and timing the steps Observed tool loan out activity from 12-2PM on Thursday, Oct 15. Tool Loan Out observation: Need more data, may leave a form with the staff to have them record transactions Purchasing observation: Guide approval times vary – send survey to MSD II students to get more accurate data

Current State Analysis

Current State Analysis: MSD II Survey The following survey will be sent to MSD II students to receive feedback regarding the guide approval process. We also hope to better understand what teams utilize the consumable inventory on the MSD floor and in the machine shop.

SKU Rationalization

Prototype Testing Plan

Prototype Discussion Walk through Purchasing prototype Walk through budget tracking prototype Walk through tool loan out prototype *A general screen shot of the prototype can be found on the team ’ s Edge website. Each prototype will be pulled up and walked through during the review.

Questions?

Appendix

Problem Statement

Customer Requirements

Engineering Metrics

Benchmarking

Purchasing Functional Decomposition Top Level Functions

Inventory Functional Decomposition

Purchasing Functional Decomposition

System Architecture

Morphological Chart

Concept Development Five design concepts were generated through use of the morphological chart. The concept development matrix highlights the primary functions of the system and the design option for each concept displayed on the left.

Concept Selection

Feasibility: Purchasing - Web Based Form

Feasibility: Purchasing - Adding a Vendor 1 2 3

Feasibility: Purchasing - Active Request Tracking

Feasibility: Purchasing Support Tool

Purchasing Process Map

Feasibility: Tool Loan Out 1 2 3

Tool Loan Out Process Map

Feasibility: Scheduling 1 2 3

Scheduling Process Map

Risks Coding becomes overly complicated -Prevent by properly benchmarking and following best practices Student injury while unsupervised -Removed from scope, risk has been prevented Card Swipe vs Barcode -Reduce failure rate by researching options