WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) SP meeting Becici, 11 November 2010.
The White Paper – a policy paper to contribute to the integration process of the WBC in the ERA Dr. Erika Rost, Dr. Andreas Kahle Federal Ministry of Education.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Kick-off meeting November 2008, SYKE, Helsinki, Finland Nordic Call: CARAVAN: Next steps Timothy Carter Finnish Environment Institute,
Community based HIV treatment COBASYS WORKPLAN 3 REACH Trust.
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
Understand European Energy Supply Security Management Co-ordinators UNDER way towards STANDard indicators for continuous VET A short summary.
Mediterranean Sea Workshop SEANERGY 2020 project Athens, Greece, 24 May 2011 European Wind Energy Association, Dorina Iuga Supported by.
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Reflections from a successful H2020 application Dr Liz Aston, Edinburgh Napier University and SIPR Dr Megan O’Neill, University of Dundee and SIPR.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. O Transnational strategy for „Airport City‟ development,
EIE EffCoBuild WP3 Energy saving potentials in building sector and virtual “power saving plant” Slovenia Survey on energy consumption in community Jesenice.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
EU-Project Creative Cities facts and figures
FLLLEX – Final Evaluation
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Poverty Alleviation through Cleaner Energy from Agro-industries In Africa - PACEAA - Introduction to the project 09 November 2007.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Green Partnerships Local Partnerships for Greener Cities and Region Stavroula Tournaki, Chemical Engineer MSc, ΕU Projects Manager 2 nd SC – Portalegre,
National Library of the Czech Republic EMBARKEMBARK Work Description for Discussion Zdeněk Uhlíř Prague
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
1 Energy Efficient Buildings PPP: Results and outlook from an industry perspective On behalf Stefano Carosio D’Appolonia SpA/E2BA Coordinator EeB PPP AIAG.
Green Partnerships Local Partnerships for Greener Cities and Regions 5 th Steering Committee meeting Cyprus, Cyprus 2014 Theocharis Tsoutsos, Assoc.
EVENTI Enhancing The Capacity of Tourist Businesses in Europe in Event Management LEONARDO DA VINCI Transfer of Innovation.
O Transnational strategy for „Airport City‟ development Giuseppe Luppino - ITL.
Welcome Introductions Plans for the day Key milestones progress Agree final standards Participate in & evaluate activities Understand financial requirements.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
PATCH-WORLd Next activities May 25th, 2009 Qawra, Malta 4 th Meeting This project has been funded with support from the European Commission. This publication.
Antonio Mocci Mestre, January 17, 2011 Lead partner: Governance of the project monitoring, evaluation and dissemination systems.
WP4 – Policies, strategies, plans and innovative energy efficient solutions in urban transport Steering Committee Meeting Rijeka, Croatia 26/02/2015 Presented.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Evaluation.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Title of Presentation Subtitle/other information 1 EU-ASEAN S&T cooperation to jointly tackle societal challenges WP5: Communication and.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
ESPON GOVERNANCE OF TERRITORIAL AND URBAN POLICIES FROM EU TO LOCAL LEVEL Luxembourg, 18 May 2005 Joaquín Farinós Dasí University of Valencia.
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
Project objective: To reveal the ways how formal educational systems contribute to lifelong learning and social integration under different types of wider.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
Green Partnerships Local Partnerships for Greener Cities and Region Stavroula Tournaki, Chemical Engineer MSc, ΕU Projects Manager 2 nd SC – Portalegre,
Planning of Activities GEH-MIT German Hands-on Modern Information Technologies Teacher Training Scheme.
Implementation plan for Strategic Research and Innovation Agenda for Traditional Food Prof. Đuro Kutlača, PhD Institute “Mihajlo Pupin”, University of.
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Michael ten Donkelaar ENVIROS, s.r.o. Prague, 7 th of April 2016 Status WP 6 – Implementation of Adapted Energy Management Standard.
Energetická náročnost budov
Kick Off Meeting Largs, Scotland
Title of presentation Copyright IDS and MeTA 2010
NatRisk WP-6: Dissemination
Task 6.3 – Evaluating business models currently in use by partners
Development and Energy in Africa
WP 7 – Dissemination and Network Development
SELF ASSESSMENT TOOL FURNITURE NEW EUROPEAN SKILLS 2020
Structural developments
Governing Board Meeting Maria MAIA
RECARE set-up Rudi Hessel on behalf of coordination team
WP2 Communication WP and tasks presentation
European Innovation Partnership on Water
Dissemination Plan made from EDUNET LEONARDO PARTNERSHIP PROJECT
European Statistical System Network on Culture (ESSnet Culture)
Expert evaluation network
IRWS Background and process towards its publication
20th February, 2018 Kiev, Ukraine Rainer Janssen, Cosette Khawaja
Presentation transcript:

WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader BCEI ZRMK Marjana Šijanec Zavrl Building and Civil Engineering Institute ZRMK Meeting in Sala, February 22-23, 2007

EffCoBuild WP6 Implementation of pilot/demonstration projects WP 2: Analyses of framework in the pilot community WP 3: Energy saving potentials in building sector and virtual “power saving plant” WP 1: projec t mana geme nt WP 4: Development of a concept for measures towards enhancing the energy saving in buildings WP 5: Compilation of “10 best of” examples for a brochure WP 6: Implementation of pilot/demonstration projects Brochure with 10 examples for each country Initiated pilot project in each pilot community Saving potential in GWh/a for each community Concept of measures/actions for pilot community Analyses of the status quo; Suggestions for improvement WP 7: disse minati on of result s Work packages Output

EffCoBuild WP6 Tasks – national workshops In national workshops in each community, the project partner selects, together with the stakeholders, one measure, instrument or action contained in the concept (worked out in work package 4), which is considered as most prior and should be implemented first. Considering the experience from the “best of” examples from other communities, the criteria for the selection of the pilot project will be: - innovative approach: the measure should be new in the community - the measure should be clearly perceived by the citizens and media - the measure should overcome existing barriers for energy efficiency measures at buildings in the community - the measure should be applicable for many other communities in the country and in the EU (multiplication)

EffCoBuild WP6 Tasks – joint transnational workshop & adopted pilot project In a joint transnational workshop, all country partners present their planned pilot projects to the other communities. Every community will receive feedback and will thus profit from the experience of the other countries in similar actions. The feedback will be adopted in the pilot projects, and the results of each pilot project will be documented in a report, which will be published at the project homepage.

EffCoBuild

WP6 - Outcome - Organising national workshops with the stakeholders to determine and draft the pilot project in the pilot communities - Organising the transnational workshop - Adoption of the pilot projects regarding the feedback from the workshop - Implementation of the pilot projects

EffCoBuild WP6 – Timetable & Deliverables x xxx IR Deliverable(s) of WP6 - D20 4 national workshops to evaluate final concept for measures and selection of pilot project - D23 draft plan for the pilot projects 10 pages per country - D24 transnational workshop in Jesenice October D25 report on transnational workshop 15 pages - 3 introduction ZRMK and 3 p from each partner about pilot project - D26 final plan for the implementation of pilot projects 20 pages per country -D28 4 pilot pilot project implemented just report -Move project meeting from to and from to Jesnice meeting October 2007 D20 D23D24 D25 D26 D28 Jan 2007 July 2007Jan 2008 PR PRPR

EffCoBuild Performance indicators Web site, lectures, leaflet encl. to energy bill, article, posters …

Thank you for your attention!