18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.

Slides:



Advertisements
Similar presentations
16/12/02GS/ALICE TB 1 Update on the ALICE Grounding Plan From draft document (June 02) The grounding plan for ALICE proposed in this document is based.
Advertisements

ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
The Detector Control System – FERO related issues
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Siena, Oct th Topical Seminar on Innovative Particle and Radiation Detectors: Progress in Radiation and Magnetic Field tests of CAEN HV and.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
FF - August 30th 2004 Meeting ALICE radiation tolerance. Some reasons for this meeting: A part very inner detectors (Pixels and SDD), ALICE has wide grey.
FP420 Low and high voltage supply INFN/Univ. of Torino Sep
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
2/2/2009 Marina Artuso LHCb Electronics Upgrade Meeting1 Front-end FPGAs in the LHCb upgrade The issues What is known Work plan.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Naming and Code Conventions for ALICE DCS (1st thoughts)
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Colmar, 9-13 Sept. 2002LECC th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards.
André Augustinus 9 October 2006 Interlocks update.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
IB PRR PRR – IB System.
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
1 Radiation worries in the cavern L.Jirdén
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
M. Hansen, CERN S. Lusin, CMS TC / UW
CAEN power supply group
Evaluation and testing of advanced low-voltage power supplies
TPC Detector Control System
RPC HV-LV project Introduction System requirements and description
CAN branch PSU – Update meeting
RPC HV-LV project Introduction System requirements and description
Presentation transcript:

18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems SPD, SSD, HMPID, DiMuons (Tk & Trig) Grounding scheme of each subsystem Wiener PL500radiation testing, status and plans (ESS) CAEN dc/dc converterradiation testing (ESS group & CMS team) AREMproradiation testing Latest calculations of radiation levels

18/6/03GS/ALICE Forum2 TPC Grounding

18/6/03GS/ALICE Forum3 TRD Grounding

18/6/03GS/ALICE Forum4 TOF Grounding

18/6/03GS/ALICE Forum5 HV PS LV PS Subdetector Support - Safety Ground Vessel (if any) FEE Screen (if any) Equipment Rack - Safety Ground Copper links (if any) Grounding - (Over)simplified generic model GS/ Mains 1M  Mains Ground Trasf Optical Links Mains Ground

18/6/03GS/ALICE Forum6 Status of Grounding Preliminary grounding plans shown –TPC, TRD, TOF, SPD, SSD, HMPID, DiMuons First overview of large systems by TIS does not reveal inconsistencies or violation of safety rules Plans comply with guidelines (isolation of subsystems, etc) –HMPID: problem of metallic pipes Not (yet) all mapped to generic template –Simplified functional scheme needed for operational verification Are guidelines an overkill ? –Follow established best practices in large detectors –Proof of principle: test with slice of real system (by end 2003)

18/6/03GS/ALICE Forum7 Status of LV Power Supplies (I) Wiener (PL500 & variants) Power & Radiation tolerance –Joint effort in ESS to develop rad tolerant configuration for LHC experiments –Power block validated for ATLAS & CMS radiation levels in exp. hall –Standard embedded microprocessor (controls all operations) sensitive to very low levels –Recently tested new device may be more tolerant Controls –Modification required (switching of individual channels) –Control (OPC server) not yet finalized –Very slow response from supplier –Action: draft a common ALICE requirement document (L. Jirden) and get help of ESS group to raise interest in supplier and expedite delivery

18/6/03GS/ALICE Forum8 Status of LV Power Supplies (II) CAEN dc/dc converter (SASY, EASY) –Radiation test with ≈ 20MeV neutrons (CMS team) –Fluence up to >> 10 years LHC –4 SEU observed, analysis under way –Radiation tolerance seems to be more than adequate for the levels expected in ALICE –EMI of input power cables to be measured –Final validation of prototypes by ≈ end 2003 AREMpro –Low power units for SDD (and possibly SSD) –Radiation tested with neutrons - spectrum up to ≈ 20MeV –No problems found for fluence >> 10 years LHC

18/6/03GS/ALICE Forum9 Latest calculations of radiation levels (B. Pastircak) Charged hadrons contribution included in tables Fluence includes normalization of NIEL to 1 MeV neutrons Higher fluence values for SPD inner layer (mainly) Outside ITS –TPC FE (inner radius) TID ≈ 0.65krad –fluence (1MeV n eq) ≈ cm -2 (p,  > 20MeV) ≈ cm -2 –Other subdet locations with (p,  > 20MeV) >> 10 8 cm -2 Levels at rack locations are very low –TID ≈ 1 rad –fluence (1 MeV n eq.) << 10 8 cm -2 –==> standard commercial equipment can be used

18/6/03GS/ALICE Forum10 Status of LV Power Supplies (III) Some thoughts on Wiener LVPS ALICE requires individual channel control as in PL500 F12 –not requested by other LHC experiments (see eg ATLAS LVPS MS) –small number, relatively uninteresting business opportunity ? What if Wiener does not deliver “ALICE” PL500s ? –(Nearly) all subsystems have voltage regulators on FE load –Radiation levels in ALICE hall are expected to be so low that industry standard products (wide range) may be used. Advantages and drawbacks: Estimated cost ≈ 1 Euro/W (< 3x lower than HEP units) Outstanding reliability Simpler functionality (remote setting, ramping, etc) Developments needed: market survey, test, control s/w (OPC server etc) –Should somebody look into this possibility ?

18/6/03GS/ALICE Forum11 Conclusion Good progress in implementation of grounding plan Progress in dc/dc converter testing Questions on prototyping and availability of LVPS –Essential controls not yet available –ALICE specific requirements may be niche market –Action: common ALICE requirements document –Single source dependence Commercial “rad soft” equipment can be used at rack locations