Contractor Alternate Design Serving the Public’s Best Interest.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

MASBO February Information to purchase Services Information to purchase Construction.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Design/Build Solutions to your construction projects, large and small.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Ensure Vendor/Engineer of Choice Product Quality
Session 8 Implementing PPPs
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
PROCEDURES FOR SELECTING THE CONTRACTOR
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
Construction Engineering 221 Cost Estimating and Bidding.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Genesis Solar Module Brochure ™
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Old Policy – which no one ever seem to have heard of.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Chapter 16 Capital Goods McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
COMPETITION REQUIREMENTS
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
TYPES OF CONTRACTS.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 DESIGN RESPONSIBILITIES Contract Information Supplied by Design Team Responsibility of the Precaster Option I Provide complete drawings and specifications.
Stockton University Purchasing and Grants 11/4/15.
ENGINEERING What is Engineering? The application of mathematics and scientific principles to better or improve life To equip creative minds with the mathematical.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
The Professional Engineer Stamp. PE Stamp Required: Optional Details Optional Procedures Optional Materials Structural Capacity Safety Results of.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Affordable Energy Production from Renewable Fuel
(Additional materials)
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Quality Management Systems – Requirements
Request for Proposal & Proposal
PROJECT DELIVERY METHODS
Lecture 10 PROCUREMENT Ferdinand FASSA.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
CEM 515 Done by: Abdulkarim Sulais
Presentation transcript:

Contractor Alternate Design Serving the Public’s Best Interest

Development / Building Phases Project Planning

Development / Building Phases Project Planning Prioritizing / Programming Project Planning Prioritizing / Programming

Development / Building Phases Project Planning Prioritizing / Programming Preliminary Design –Needs Analysis Engineering Scope Activity Environmental Scope Activity Environmental Class of Action Identification –Preliminary Alternatives Development –Detailed Alternative Review –Environmental Impact –Engineering Evaluation Project Planning Prioritizing / Programming Preliminary Design –Needs Analysis Engineering Scope Activity Environmental Scope Activity Environmental Class of Action Identification –Preliminary Alternatives Development –Detailed Alternative Review –Environmental Impact –Engineering Evaluation

Development / Building Phases Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design –Right of Way Acquisition –Utility Relocation Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design –Right of Way Acquisition –Utility Relocation

Development / Building Phases Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design Final Design –TS&L Study –Contracted Design Single Option Multiple Options Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design Final Design –TS&L Study –Contracted Design Single Option Multiple Options

Development / Building Phases Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design Final Design Contracting –Contractor Alternate Design –Shop Drawing Reviews –QA Inspections Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design Final Design Contracting –Contractor Alternate Design –Shop Drawing Reviews –QA Inspections

Development / Building Phases Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design Final Design Contracting Open Structure to Public Use Project Planning Prioritizing / Programming Preliminary Design Pre-Final Design Final Design Contracting Open Structure to Public Use

Why Contractor Alternate Design It is simply not practical to pursue all design options to their conclusion The optimum solution may have been overlooked It creates a desirable environment where people with specific skills, equipment and facilities, are assembled to offer solutions to the owner. It is simply not practical to pursue all design options to their conclusion The optimum solution may have been overlooked It creates a desirable environment where people with specific skills, equipment and facilities, are assembled to offer solutions to the owner.

Definition A contractor bidding a design, essentially meeting the requirements as defined by the owner’s TS&L study, based on the owner’s standards, prepared by the contractor’s team, including a contractor selected design engineer.

Essential Requirements Having the same: –Load carrying capacity –Number and size of traffic lanes, shoulders, curbs, sidewalks, etc. Meeting the requirements for: –Vertical and horizontal clearances –Roadway geometry requirements –Clearance to underlying roads, utilities, railroads, streams, structures, or wetlands –Other project specific considerations that might be discovered during exploratory drilling Having the same: –Load carrying capacity –Number and size of traffic lanes, shoulders, curbs, sidewalks, etc. Meeting the requirements for: –Vertical and horizontal clearances –Roadway geometry requirements –Clearance to underlying roads, utilities, railroads, streams, structures, or wetlands –Other project specific considerations that might be discovered during exploratory drilling

Benefits for the Owner Lowers bids without a reduction in quality Improves customer service by reducing construction time Prevents “crippled” designs from being executed Lowers bids without a reduction in quality Improves customer service by reducing construction time Prevents “crippled” designs from being executed

Benefits for the Owner (2) Taps industry design methodology and technology Considers changes in capabilities and technology Fits the best team approach and the best all the participants have to offer Rewards contractor’s agility and ability to solve problems Takes advantage of the latest materials available Taps industry design methodology and technology Considers changes in capabilities and technology Fits the best team approach and the best all the participants have to offer Rewards contractor’s agility and ability to solve problems Takes advantage of the latest materials available

Benefits for the Contractor Creates a basis for competition on the basis of the best solution rather than the cheapest price Rewards innovation, agility, and originality Rewards ability to match conforming solutions with the problem at hand Fosters a sense of partnering with owners and his suppliers Creates a basis for competition on the basis of the best solution rather than the cheapest price Rewards innovation, agility, and originality Rewards ability to match conforming solutions with the problem at hand Fosters a sense of partnering with owners and his suppliers

Benefits for the Contractor (2) Considers workload, efficiency and best fit in fabricating plants and at suppliers Considers latest improvements in safety procedures Moves competition further back in supply channel Considers availability of suitable equipment Accommodates contractor’s best construction operations Considers workload, efficiency and best fit in fabricating plants and at suppliers Considers latest improvements in safety procedures Moves competition further back in supply channel Considers availability of suitable equipment Accommodates contractor’s best construction operations

How it Works The Owner –Provides common design criteria –Establishes policy that lowest bid will take contract –Allows Contractor Alternate Designs –Provides rules for Contractor Alternate Designs –Provides development information for use by bidders The Owner –Provides common design criteria –Establishes policy that lowest bid will take contract –Allows Contractor Alternate Designs –Provides rules for Contractor Alternate Designs –Provides development information for use by bidders

How it Works The Contractor –If his Contractor Alternate Design bid is successful Submits conceptual plans and schedule of proposed design for approval The Owner –Reviews for essential functional equivalency, based on specifications and approves or rejects The Contractor –Prepares final plans –Provides design calculations –Establishes a required items schedule The Contractor –If his Contractor Alternate Design bid is successful Submits conceptual plans and schedule of proposed design for approval The Owner –Reviews for essential functional equivalency, based on specifications and approves or rejects The Contractor –Prepares final plans –Provides design calculations –Establishes a required items schedule

Rules to Make it Work Anything additional falls on the shoulders of the contractor Delays in submission or approvals are at the contractor’s risk A Registered Professional Engineer, familiar with standards and criteria must prepare the design – the owner reserves the right to approve or reject the designer Contractor may have to pay a review fee Anything additional falls on the shoulders of the contractor Delays in submission or approvals are at the contractor’s risk A Registered Professional Engineer, familiar with standards and criteria must prepare the design – the owner reserves the right to approve or reject the designer Contractor may have to pay a review fee

Rules to Make it Work (2) If the Contractor Alternate Design solution fails to meet the owner specified design criteria and is rejected for that reason, the contractor is required to build the as-designed version for the amount bid

Why Not the Best Design in the First Place? Standards and specifications are at best a compromise between the minimums acceptable while allowing for sufficient competition As-designed solutions are aimed at the lowest common denominator Significant new methods can become available between design and bidding Designers tend to think there is only one solution “Necessity is the Mother of Invention” Standards and specifications are at best a compromise between the minimums acceptable while allowing for sufficient competition As-designed solutions are aimed at the lowest common denominator Significant new methods can become available between design and bidding Designers tend to think there is only one solution “Necessity is the Mother of Invention”

Why not Value Engineering After the Bid? A contractors competitive creativity peaks at bid time when the team to support the project is assembled After the bid the contractor is in a “build it as you see it” mode unless there is a major blunder Can the contractor keep the job stay in limbo for the time needed to negotiate the division of savings, get approvals, and reviews for the proposal ??? A contractors competitive creativity peaks at bid time when the team to support the project is assembled After the bid the contractor is in a “build it as you see it” mode unless there is a major blunder Can the contractor keep the job stay in limbo for the time needed to negotiate the division of savings, get approvals, and reviews for the proposal ???

Public Policy Chapter 2 of the PENNDOT Design Manual states: “Unless approved by the Chief Bridge Engineer, alternate designs by contractors are permitted in all cases. Justification must be provided whenever alternate designs are not allowed.” Chapter 2 of the PENNDOT Design Manual states: “Unless approved by the Chief Bridge Engineer, alternate designs by contractors are permitted in all cases. Justification must be provided whenever alternate designs are not allowed.”

Thank You For Your Attention Questions?