Risk Management on Tunnelling Projects Warwick University MSc course

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Determining the Significant Aspects
PROJECT RISK MANAGEMENT
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Service Design – Section 4.5 Service Continuity Management.
ISO General Awareness Training
Project Risk Management
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Session 6Slide 6-1 Risk Management Lessons from Outside the United States Session 6 Slide Deck.
Managing Project Risk.
The Risk Management Process
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
Project Risk Management
PMI Knowledge Areas Risk Management.
Risk Management & Liability Informa Brownfield Hospital Development Summit June 2009.
Chapter 11: Project Risk Management
RISK ASSESSMENT 2010/2011 M.J Ramakgolo. THE PURPOSE The aim of the risk assessment session is to develop the Strategic Risk Profile for the municipality.
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Managing Risk. What is Risk Risk is the chance of things happening that could have an impact on the outcomes it achieves, or on the objectives of the.
Introduction Time Quality Cost Project Constraints Success Introduction.
UNIT 9: An Ecosystem Approach to Fisheries Management Plan.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Hazards Identification and Risk Assessment
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
Risk Management RISK MANAGEMENT Practical Processes for Tunnelling and Underground Works Kevin McManus 27 March 2014.
Risk Management KMc Mar 2013 RISK MANAGEMENT Practical Processes for Tunnelling and Underground Works Kevin McManus 21 March 2013.
Risk Management on Tunnelling Projects Warwick University MSc course
The Risk Management Process
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Introduction to Project Management Chapter 9 Managing Project Risk
Project management Topic 5 Risk. What is risk? An uncertain outcome – either from a positive opportunity or negative threat Risk management is about:
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
Environmental Risk Analysis Chapter 6 © 2004 Thomson Learning/South-Western.
OHSAS Occupational health and safety management system.
Principles of risk assessment Risk assessment training course Module 1 Principles of risk assessment.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
RISK & ITS MANAGEMENT. Risk A crisis situation involves : - a threat to resource & people, - a loss of control, - visible and / or invisible effects on.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Risk Assessment: A Practical Guide to Assessing Operational Risk
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
Risk Management.
Ensuring a safe workplace
SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY
CHAPTER11 Project Risk Management
Risk Management Definition
Risk management - HIRAC awareness presentation
Quality Risk Management
RISK ASSESSMENT TOOL PREVIEW
The Importance of Project Risk Management
Software Project Management (SPM)
Quantitative Risk Assessment
Project Risk Analysis and Management: L3
A New Concept for Laboratory Quality Management Systems
Project Risk Management Jiwei Ma
Presentation transcript:

Risk Management on Tunnelling Projects Warwick University MSc course London Bridge Associates John Keys Risk Management on Tunnelling Projects Warwick University MSc course

Introduction to Risk Management Identification of tunnelling risks London Bridge Associates Introduction to Risk Management Identification of tunnelling risks Risk analysis and risk assessment tools Introduction to the Risk Workshop

What is risk management? - Definitions London Bridge Associates What is risk management? - Definitions Hazard is something with the potential to cause harm or change the desired outcome Risk is the likelihood of a hazard occurring x consequence of a hazard Risk Analysis is the process of identifying risk factors and the quantification of those factors (estimating likelihood and magnitude of impacts) Risk assessment is the tool whereby risks are evaluated in terms of their likelihood and consequence and mitigation measures identified Risk Mitigation is the process of developing a plan to respond or deal with risk on a project Risk Register is a method for recording the project risks for subsequent management

Risk Assessment process London Bridge Associates Risk Assessment process Hierarchy of Risk reduction Eliminate at Source Control Monitor Initial Risk Consequence Unacceptable Risks Risk cannot be justified except in extraordinary circumstances Tolerable only if risk reduction is impracticable or if the cost is grossly disproportionate to the improvement gained ALARP Zone Residual Risk Tolerable if cost of reduction would exceed the improvement gained Likelihood Negligible Risks

What risk assessment tools are available? London Bridge Associates What risk assessment tools are available? Risk assessments can be undertaken using either Qualitative judgements (high / medium / low risks ) or Quantitative values (numerically as derived from case histories / databases) Consider practicality of assessments Availability of reliable data Diversity of each tunnel’s characteristics

What risk assessment tools are available? Risk Analysis tools London Bridge Associates What risk assessment tools are available? Risk Analysis tools Fault tree analysis Event tree analysis Decision tree analysis

Why do we need Risk Management? London Bridge Associates Why do we need Risk Management? Why do we need Risk Management?

Identification of tunnelling risks? London Bridge Associates Identification of tunnelling risks? The Joint Code states: “Hazards shall be identified and evaluated on a project-specific basis and their consequent risks shall be identified and quantified by Risk Assessments through all stages of a project “ Project Development Stage (conceptual design) Detailed Design Stages Procurement Stage Construction Stage Operational stage for any stipulated maintenance period. 8

Joint Code of Practice for Tunnelling London Bridge Associates Joint Code of Practice for Tunnelling Section 8 – Design Clause 8.3.1. states “The fundamental objective of the design process is that of achieving a robust design, that is a design where the risk of failure or damage to the Tunnel Works or to a Third Party from all reasonably foreseeable causes, and including health and safety considerations, is extremely remote during the construction and the design life of the Tunnel Works. High consequence but low frequency events that could affect the works or a Third Party shall also be considered”

Joint Code of Practice for Tunnelling London Bridge Associates Joint Code of Practice for Tunnelling Section 8 – Design Clause 8.3.4 states “The design process shall include, where appropriate, sensitivity studies to assess the impact of: a) construction tolerances b) variation in geotechnical design values c) variation in materials characteristics d) variation in workmanship and geometry e) methods of construction and the implementation of mitigation/contingency measures f) natural perils exposure in the region of the project such as flood, storm, seismic or tidal effects

London Bridge Associates Joint Code of Practice for Tunnelling Section 8 – Design Clause 8.5.1. states “The Designer shall ensure that adequate construction expertise is available to undertake formal reviews of the design to assess and confirm the appropriateness of the design in terms of Constructability, including health and safety considerations in relation to BS6164”

London Bridge Associates

London Bridge Associates Questions?

Dry Creek Road Tunnel Project London Bridge Associates Risk Management Workshop Dry Creek Road Tunnel Project

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project Background to the project $400m road tunnel in Australia Ring road around the town of Yarra Awali Client designed scheme Funded by state taxes Environmental constraints Golf course Residential areas West Portal in a flood plain

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project Background to the project Detailed design 3km long 110m2 excavated face area Boreholes / seismic surveys / Previous borehole data Tunnel alignment Minimise environmental impact Steep gradients Over burden Utilities High rise luxury hotel Portals positioned to minimise impact Conservation area and a flood plain Old Quarry Geology Hydrology

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project Background to the project Historical Land use Ground water extraction for irrigation Small dwellings still extract water Local brewery Abandoned quarry on west side

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project Background to the project Contractual NEC form of contract with all risks transferred to the Contractor Pain / Gain incentives Design and Construct Contract Novated design - NATM methodology Contractor to price risks 1 month to bid the works

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project Background to the project NATM construction method Alternative designs Cheapest tender submission $400m Contractor lacked resources JV Board decision on passing on risk

Dry Creek Road Tunnel Project London Bridge Associates Dry Creek Road Tunnel Project You are the construction company for the Dry Creek Road Tunnel project. You have a meeting tomorrow with a group of Insurance Companies The Insurer company have asked you to identify all the key risks and convince them that you have the risks under control before they will provide cover to the project Task 1 Your brief is to identify the top risks associated with the project and what control measures you will be putting in place to manage those risks. Rank the risks in order of priority starting with the highest risks first and an explanation why you perceive these risks as priorities. Task 2 Identify the actions and measures the Client and the Designer should have put in place to ensure that the project had the greatest chance of success.