Tom Canfield Engineering Technologies and Design POE 2.4.1 Medina County Career Center 1/3/2011.

Slides:



Advertisements
Similar presentations
Mansoura University. Faculty Of Engineering. Civil Eng . Dept.
Advertisements

Designing and Building File-Folder Bridges
 Each student has a file in their folder that will help guide the project. The file contains a rubric that explains how it will be graded. The project.
Introduction to the basic concepts employed by the structural engineer when designing and building bridges including load, dimensions, and materials.
Chapter 34 Bridge Construction.
Bridge Engineering: Lessons from Rome to Tacoma
The Grand Canyon Skywalk The glass bridge which is suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon. The construction.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Construction Loading Analysis 2010 Contractor Engineer Conference Bill Dreher Structures Design Chief WisDOT.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
TRUSSES–THE METHOD OF SECTIONS (Section 6.4)
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
EXAMPLE 9.3 – Part III PCI Bridge Design Manual
2.4.1 Structural design and Bridge Construction
Examining Forces on Bridges.  At any given time, two main forces act upon a bridge: compression and tension.  It is the job of engineers to design bridges.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
 Dennis H. Mahan Memorial Bridge  Project ID: 00055A-  Iteration #32 (Thu, 7 Feb 2013, 10:42:45)  Type of CostItemCost CalculationCost  Material.
Bridges from all over the World! By: Maria Peloro & Christine Sniffen Bridges powerpoint project 2 nd period science.
There are many types of bridges including:
A Bridge Too Plain To Be Original
Engineering & Beyond Workshop 2005 Civil Engineering Civil, Construction and Environmental Engineering Department.
Critical Thinking in Engineering Process
Bridges Vocabulary. Bridge  A structure used to help people cross valleys, rivers and bodies of water.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
I. Truss Bridge Gussets Background
Bridge Engineering (5) Substructure – Abutments and Piers
PROIECTUL. The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of The glass bridge.
A swinging cable and wooden plank bridge in a New Zealand rain forest.
Open the software and click “close” after reading the tip. The screen below will come up. You may want to load a sample bridge design for starters. You.
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
ENGR 211 Bridge Design Project
THE METHOD OF SECTIONS In-Class Activities: Check Homework, if any Reading Quiz Applications Method of Sections Concept Quiz Group Problem Solving Attention.
Enhancing Thinking Skills in Science Context Lesson 6
Paper Truss Bridge MESA Day 2010 Competition.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Armadillo.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 The Bleeding.
NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Money.
ALL THINGS CONCRETE. WHAT IS CONCRETE Is a mixture or cement (usually Portland cement), aggregate (gravel, and sand), water and chemicals added to the.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section Girls 1.
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design: EDGSN 100 Section 002 Team Ultra-Truss.
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Advisor: Dr. Bilal El Ariss
Replacement of Vehicle Bridge over Spring Creek Centre County, PA
The CE311 Steel Bridge Competition
THE METHOD OF SECTIONS Today’s Objectives: Students will be able to
Red Hawk Me, Myself, and I.
Beam bridge Truss bridge Arch bridge Suspension bridge
Ben, Jonathan, Mason, Kambriea Design Team 1
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
The Grand Canyon Skywalk
Kansas EPS Geofoam - Lightweight Fill
Introduction to Engineering Design
Replacement of Vehicle Bridge over Spring Creek
The Grand Canyon Skywalk
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
The Great Belt East Bridge
THE METHOD OF SECTIONS Today’s Objectives:
Statics Course Code: CIVL211 Dr. Aeid A. Abdulrazeg
The Grand Canyon Skywalk
Q7. ____________________have short spans usually less than 250 feet.
Replacement of Vehicle Bridge over Spring Creek
Presentation transcript:

Tom Canfield Engineering Technologies and Design POE Medina County Career Center 1/3/2011

 Design a bridge in WestPoint bridge builder.  Minimal overall cost.  If bridge is below 24m, excavation of river banks is required.  The highest point must not exceed 8.5m above the river banks.  Must be constructed of no more than 50 joints and no more than 120 members.

 Bridge deck must be 10m wide to accommodate traffic.  May choose from different member materials.  May choose either hollow or solid members.  Must be able to support its own weight along with a 480kN load from passing traffic.

 Bridge can either have one lane or two lanes on the deck.  The bridge must comply with safety provisions of the 1994 LRFD AASHTO Bridge Design Specification. Material densities Load combinations Tensile strength of members Compressive strength of members

 Deck Elevation 8 meters- $75,200  High-Strength concrete- $5,000  Quenched Hollow tube- $32,  Product cost- $6,000  Excavation cost- $67,000  Abutment cost- $24,800  Total cost- $165,764.18

 This design of bridge was decided to be the final design because it was the cheapest and most versatile bridge design.  it also follows all of the constraints listed in the design brief.