12 November 20141 WP1 Progress report By Jean-Luc Salagnac, WP1 leader Forum meeting 7, DG ENTR, Brussels.

Slides:



Advertisements
Similar presentations
Public hearing European Standardization: improving competitiveness through a new regulatory framework - European Parliament / IMCO 6 key messages on European.
Advertisements

Lifelong Guidance Policy and Practice Initiatives in the EU Update on Progress Jyvaskyla, 6-7 November 2006 Ronald G. Sultana Euro-Mediterranean Centre.
Development of NQF in Montenegro
11 June WP3 - Insurance Mapping Update & Recommendations By Thomas Dunand, Hannover Re Forum Meeting 6, DG ENTR, Brussels.
11 June WP1 Progress report By Jean-Luc Salagnac, WP1 leader and Frédéric Bougrain Forum meeting 6, DG ENTR, Brussels.
CEN WS/BII2 1 Spreading interoperability in eProcurement processes across Europe Open Seminar Brussels December 6, 2012.
Explosives Working Group 4 November 2014 Notified Bodies and NANDO Norma McGovern, DG ENTR.C1 – Internal Market and its International Dimension.
12 November WP3 – General Perspective By Thomas Dunand, Hannover Re Forum Meeting 7, DG ENTR, Brussels.
THE EUROPEAN FUND FOR THE INTEGRATION OF THIRD COUNTRY NATIONALS European Commission - DG HOME Nadège Monnot 28 October 2010.
Nabarro Nathanson Workshop on Software Quality and the Legal System Friday 13th February 2004 Safety Related Systems: The Legal Framework Dai Davis Solicitor.
External Quality Assurance in the European Higher Education Area: Challenges and Trends Rolf Heusser, Switzerland TechnoTN Forum, Brussels, 4 May 2007.
12/11/ Focus on cross-cutting topics of Elios 2 By Jean Roussel & Michel Van Droogenbroek (WP 5) Final Forum meeting (7), DG ENTR, Brussels.
Report on the role of land surveyors and associated regulatory framework workshop, Vilnius, March 2006 Saulius Urbanas, NLS of Lithuania.
ENTERPRISE AND INDUSTRY DIRECTORATE GENERAL European Commission Anna Solé Mena Policy Officer - European Commission DG Enterprise and Industry.
Fourth Joint EU-OECD Workshop on Business and Consumer Opinion Surveys EU-wide business survey in the financial service sector Brussels, 12th October 2009.
NOTIFIED BODIES EC MARKING. index  Notified Bodies. Activities  Notification procedure  Role of accreditation  Notified Bodies cooperation  Notified.
Cities for Active Inclusion: Investing in an Inclusive Society Rotterdam, 29 October 2013 Susana Forjan Project coordinator, EUROCITIES.
12 November WP2 Building pathology By Henk Vermande Forum meeting 7, DG ENTR, Brussels.
19 th Bled eConference, 06 June Hannes Selhofer European Commission An initiative of the Hannes Selhofer empirica GmbH 19 th Bled eConference –
1 The Internal Market Information System (IMI) A tool enabling more mobility for health professionals AER Breakfast Briefing Brussels, 12 November 2009.
EQAVET Supporting European quality assurance in Vocational Education and Training Sean Feerick Rome 2 December 2010 European Quality Assurance in Vocational.
Third-Party Violence at Work- a multi-sectoral approach by European social partners ETUCE Conference 2nd Regional Seminar Brussels 7 June 2012.
11 June WP2 Building pathology – progress By Henk Vermande Forum meeting 6, DG ENTR, Brussels.
European Commission 1 By Sue BIRD European Commission, DG Employment, Social Affairs and Equal Opportunities Brussels, 17 December 2008 CECOP – CICOPA.
Multifunds and lifestyling in the European Union CEEC Forum seminar on multifunds Sofia, 18 September 2009 Jung LICHTENBERGER Insurance and Pensions Unit.
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
“BuildUpSkills II, ENERGOTRAIN project goals and activities in Lithuania.” Dr. Vaidotas Šarka Lithuanian Builders Association Lithuanian Construction.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
Monitoring and Evaluation of Roma projects and policies, Brussels, 30/11/2010 Evaluating the European Social Fund support to Roma inclusion: processes,
11 June WP4 Forum and dissemination By Kim Haugbølle, WP4 leader Forum meeting 6, DG ENTR, Brussels.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Governance indicators for pro-poor and gender-sensitive policies The NHDRs as frameworks for analysis with a focus on vulnerable groups Andrey Ivanov Human.
The EU Policy towards a low carbon economy Fabrizio Barbaso, Deputy Director General for Energy, DG TREN, European Commission EUROPEAN COMMISSION.
20 TH ANEC GA THURSDAY 11 JUNE 2009 ‘STAKEHOLDER EXPECTATIONS OF ANEC’ by Adrian Harris Secretary General, Orgalime.
Introduction to the training dataset Alexander Mack.
International Model for Technical Harmonization Earth-Moving Machine Safety Dan Roley/Jan Mimer/Kenzo Tanaka November 3, 2008.
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
1 Cohesion Policy Evaluation Network Meeting: Brussels, October 2010 Ex post evaluation of Cohesion policy programmes co-financed.
CIS-Workshop on „WFD and Hydropower“ June 2007 Berlin, Germany - First Workshop under Phase II ( ) of the EU activity „Water Framework Directive.
12/11/ Focus on cross-cutting topics of Elios 2 By Jean Roussel & Michel Van Droogenbroek (WP 5) Final Forum meeting (7), DG ENTR, Brussels.
The actors in the product supply chain and their obligations Giuseppina Bitondo European Commission, DG GROW.
EU TOOLS FOR TRASPARENCY: THE IMPACT OF EQF ON ITALIAN E&T SYSTEM Rome 7 October 2013.
WP 4: Economic Incentives & Funding Framework Dr. Robin Bürger Jens Rockel Annamaria Riemer Graz, 05 November 2013.
Module V Creating awareness on validation of the acquired competences
Housing in the European Semester
Tracking of VET graduates Presentation for the EQAVET Annual Network meeting 20 June 2018 Koen Bois d'Enghien DG EMPL unit E3 VET, apprenticeships and.
European frameworks for VET VLOR Brussels, 4 June 2014
KEY DATA ON EDUCATION – 2005 Edition
International cooperation between North Seas countries on Marine Spatial Planning & Cumulative Effect Assessment Rob Gerits.
2.1. ESS Agreement on Learning Mobility (IVET & Youth)
CEF eID SMO The use of eID in eHealth
Pollution/Radiation Risk
Update on the status of RBMP reporting
Public Administration systems in transformation
ESF Informal Technical Working Group meeting Brussels,
Scoreboard of employment and social problems within the EMU
1.
Representative sampling questionnaire
ECONOMIC BENEFITS OF GENDER EQUALITY IN THE EUROPEAN UNION
Ag.no. 15 Lessons from the 2016 A65 exercise
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Marine Strategy Framework Directive: Transposition and Implementation
DG Environment, Unit D.2 Marine Environment and Water Industry
WFD River Basin Management Plans :
Comparison of methodologies for defining Good Ecological Potential
Legal and implementation issues update
Assessment of Reporting on Competent Authorities
FISIM State of play Agenda Item 3.
Risk management in rural development policy Brussels, 16 October 2018
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

12 November WP1 Progress report By Jean-Luc Salagnac, WP1 leader Forum meeting 7, DG ENTR, Brussels

Outline Objectives (reminder) Directory of quality signs Electronic survey Use of quality signs Perspectives 12 November 20142

Reminder “Development of an EU directory on quality/conformity marks (labels, certificates, technical assessment, etc.) for construction products, processes, works, technical equipment and professional qualifications.” as a way to address the following issue: “The growing number of quality/conformity marks for construction products/services and eco-technologies does not necessarily provide clear and reliable indicators and information for the risk assessment (by insurers) and furthermore could raise issues regarding their compatibility with the objectives of the Internal Market.” 12 November 20143

Directory of quality signs (QS) Operational: Four subjects /Eight countries (BE, CZ, DK, ES, FR, NL, PT, UK) Some countries with no QS (except CE marking) (e.g. RO) Easy to manage … … but difficult to populate Eco-technologies: – Products – Systems – Competences (installers) – Works 12 November 20144

Electronic survey Aimed to give a broader view Partial target Partial view Additional information through phone interviews 12 November 20145

Use of QS by insurers QS target specific uses of construction actors QS do not explicitly target (re)insurers needs 12 November insured type of insurance productsystemcompetencework manufacturerTPLACCC contractorTPLCBAC architect/ engineering PICAAC building workIDICBAA LEGEND A: high relevanceB: medium relevanceC: no relevance TPL: Third Party Liability insurance PI: professional indemnity IDI: inherent defects insurance

Promote the directory at the EU level : – Increase population of QS – Inform of the existence of QS – Inform on the scope (who?, what?, how?) and limitations of QS – Allow comparison between QS – Facilitate understanding and therefore mutual recognition 12 November Perspectives Highlight/clarify links between QS and insurance(s) – QS provide reliable information to assess risks – QS remain one element among many others to assess risks – More specific QS related to risk assessment?

You may have questions 12 November 20148