CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
January 6. January 7 January 8 January 9 January 10.
Elena.Litvinenko CBM Collaboration Meeting Dubna 17 Oct Dipole magnet for CBM: current status P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov,
Large-acceptance superconducting dipole magnet GLAD Magnet parameters: Large vertical gap ± 80 mrad High integrated field of 4.5 Tm Fringe field at the.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Superconducting Large Bore Sextupole for ILC
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
CBM Superconducting Dipole Magnet
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
First calculations of the CLIC Antisolenoid system A. Bartalesi, M. Modena - CERN.
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
The integration of 420 m detectors into the LHC
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
HYSPEC IDT Options for polarization analysis with 3 He for the Hybrid Spectrometer (HYSPEC) L. Passell, V.J. Ghosh, I. Zaliznyak, S. Shapiro, W. Leonhardt,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
CEA DSM Dapnia Reaction mechanisms in the GeV range A programme for the study of reaction mechanisms in the GeV range C.S.T. SPhN Meeting 9 th of October,
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Design ideas for a cos(2q) magnet
Status of the PANDA Solenoid Magnet Production in BINP
Update on PANDA solenoid design
CBM magnet overview of the BINP work
MQXC Nb-Ti 120mm 120T/m 2m models
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
Magnetic System Overview Solenoid and Anti-DID
Teleconference ACS – FREIA 17th October 2017
Magnetic System Overview Solenoid and DID
Target and Horn status report
Technical Feasibility of Anti-DID Coil
the MDP High Field Dipole Demonstrator
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Experimental equipment Edgar L. Black February 17, 2019
Updated concept of the CBM dipole magnet
February 2007 Note: Source:.
as a prototype for Super c-tau factory
Magnet design, field calculations
2015 January February March April May June July August September
Presentation transcript:

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau CEA DSM DAPNIA

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting - Bernard GASTINEAU - R3B-GLAD Magnet - DIRAC-Phase-1 Annual Report meeting26 September Superconducting coils Main coil Lateral coil

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting - Bernard GASTINEAU - R3B-GLAD Magnet - DIRAC-Phase-1 Annual Report meeting26 September – First Year main points Preliminary Interface meeting with GSI-FAIR – 27 March Magnet Protection study and Instrumentation – March & April Preliminary Superconducting cable specification – April Mechanical studies – beginning in February –Cold mass – behaviour with magnetic forces –Cryostat mechanical studies – behaviour with pressure forces Magnetic design optimisation (peakfield) Superconducting cable specification – May-June Technical Design Review 1 (Conductor validation) – 4 July Check of the Large Acceptance of the present cryostat design – September Superconducting cable Order - (October)

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting - Bernard GASTINEAU - R3B-GLAD Magnet - DIRAC-Phase-1 Annual Report meeting26 September Check of the Large Acceptance (September 2006): In order to get the acceptance of the magnet, we have to respect several geometrical conditions difficult to put together : -A beam size of +/- 80 mrad horizontally and vertically from the target, -transparency to Neutrons & to 1 GeV Proton trajectories in a 2.4 T field, -a free space of 1 meter around the target, for detectors, -A vacuum connection between the beam pipe and the cryostat, -Thermal screen and thick inner vacuum vessel to resist to the pressure, -And thick cold casing around the coils to maintain the magnetic forces. The geometrical optimisation has given the following new parameters: -Distance from the Target to the magnetic entrance face = m, -A fixed horizontal angle of beam incidence / magnet axis = 14 degrees, -vertical and horizontal angles of the main and lateral coils = 5° and 18.6°, And we have to verify that the fringe field is < 20 mT around the target.

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting - Bernard GASTINEAU - R3B-GLAD Magnet - DIRAC-Phase-1 Annual Report meeting26 September /2007 – Next Year Main Tasks Magnetic design optimisation - October –Mechanical sensitivity study & Optical resolution optimisation Interface Definition meeting with GSI-FAIR - (October) Cold Mass mechanical studies –Cold Casing : further coil pre-stress study – 2006 Q4 –Detailed winding & Integration study Q1-Q2 Technical Design Review 2 (Industrial specification) - January 2007 Superconducting cable delivery and test – (March & Q4 2007) Cold Casing Order Q1 & Q2 Winding & Integration 1 Order – 2007 Q3

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting - Bernard GASTINEAU - R3B-GLAD Magnet - DIRAC-Phase-1 Annual Report meeting26 September

CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting