1 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009 1 Status of BepiColombo Harri Laakso ESA/ESTEC, Code SRE-OS, Noordwijk, The Netherlands.

Slides:



Advertisements
Similar presentations
1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
Advertisements

FCMAT Response & Preparation: Process Outline October 25, 2006.
AOGS Singapore June 2005 Paper ID: 58-PS-A0321 BepiColombo – Mission to Mercury Mission Overview Rita Schulz Johannes.
The BepiColombo Mission
Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Report on the BepiColombo Critical Equipment Review II held at ESTEC, Noordwijk, 18. Dec
Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Systems Engineering Management
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
S/W Project Management
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
DuPage ETSB Emergency Dispatch Interoperability Radio Project Presented to ETSB Radio Steering Committee January 27, 2011.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Project Initiation Document (PID) Strategic Plan PID Committee Meeting - November 5, 2012.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
1 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June Coordinated MMO and MPO observations Harri Laakso ESA/ESTEC, Code SRE-OS, Noordwijk,
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
14th Feb Page 1 LISA Mission Review Presentati on ESTEC, 14th Feb Prepared by the CDF* Team (*) ESTEC Concurrent Design Facility LISA Mission.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Portfolio Committee on Appropriations Quarter 1 Expenditure and Performance 24 August 2012 The Presidency Department of Performance Monitoring and Evaluation.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
Standards Review Subcommittee Update August 17, 2010.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data.
Page 1 BepiColombo MMO Status Update For HEWG2014, June 2014.
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS FDMO Review Propellant Budget Update − 1 October 5, 2004 PROPELLANT BUDGET UPDATE Vassilis Angelopoulos Covered in this presentation: Allocations.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
LISA News from ESA O. Jennrich LISA Project Scientist.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
JUpiter Icy Moons Explorer (JUICE)
Troy Anderson ERCOT Program Management Office November 6, 2008
Harmonisation Working Group Update on Harmonisation Project
SDO Flight Dynamics Subsystem
Planetary Protection Category II
CSS Update for CoMC 19th September 2018
Water Directors meeting Warsaw, 8-9 December 2011
RSP – Progress Overview General progress report High level plan
Presentation transcript:

1 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June Status of BepiColombo Harri Laakso ESA/ESTEC, Code SRE-OS, Noordwijk, The Netherlands H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009

2  Launcher: Ariane 5  Launch date: 21-Jul-2014  MOI date: 21-May-2020 (5.8 year cruise to Mercury by electric propulsion)  Backup: 06-Aug-2015  31-Oct-2021 (6.2 years)  Launch strategy: Direct escape  1-year Earth-to-Earth transfer  Earth, 2 Venus, 4 Mercury flybys/gravity assists  Gravity capture into Mercury orbit / Final Mercury orbit adjustment by chemical propulsion  Science operations: 1 year nominal plus 1 year extended Mission Design Overview

3 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009 Experiment IPDR Assessment BELAISAMERMAGMERTISMGNSMIXSMOREPHEBUSSERENA SIMBIO- SYS SIXS DESIGN STATUS ? SCI. PERFORM. INTERFACES - EID B RESOURCES FOPS - OB S/W PA PROGRAMME FUNDG. / SCHEDULE Delta IPDR YESNO (PA) NOYESNO (YES) NO Summary of IPDR Results

4 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009 ExperimentAllocation [kg] EID B Dr 3 CBE [kg] Declared Margin Post IPDR Alloc. [kg] Margin to Alloc. Remarks BELA % % latest est kg, savings being identified ISA %6.0 5% savings to be identified MERMAG1.8 17%1.817% power supply redundancy expected to reduce margin MERTIS3.3 8%3.38% - MGNS5.2 7%5.27% regarded small MIXS *7%8.87% regarded small 1.5 kg base plate added MORE3.5 15%3.515% - PHEBUS %7.5 6% savings to be identified SERENA %6.312% marginal for consortia SIMBIO-SYS **10% 10.6**15% significant design optimisation pending SIXS %2.013% Local radiator added TOTAL % % regarded small * excl. 1.5 kg MIXS base plate; ** excl. thermal straps (S/C) Experiment unit interconnection harness (ca. 6 kg) not included MPO Payload Resources - Mass

5 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009 MPO Payload Resources - Power ExperimentAllocation [W] EID B Dr 3 CBE [W] Re-Allocation (TBC) Remarks (allocation is on orbital average) BELA orbital average, full mode 49 W; re-allocation possible ISA power driven by thermal control MERMAG MERTIS 81312re-allocation TBD MIXS121614value is for full mode MGNS MORE3037 only for orbits with GS contact PHEBUS orbital average, full mode 23 W SERENA W for full science mode SIMBIO-SYS W for full science mode SIXS TOTAL /176142/179operations may be seasonally constraint Operational scenarios under study by SOC; re-allocation pending further assessment Limitation to 100 W baseline for perihelion or certain mission phases

6 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009 Experiment EID B Status BELA Draft 3 finalised and signed as PDR reference, detailed mech. update pending ISA Draft 3 finalised and signed MERMAG Draft 3 finalised and signed MERTIS Draft 3 finalised and signed MGNS Draft 3 finalised and signed MIXS Draft 3 finalised and signed, update required for base-plate implementation MORE Draft 3 finalised and signed PHEBUS Draft 3 finalised and signed SERENA Draft 3 finalised and signed, possible update needed for optimised accommodation SIMBIO-SYS Draft 3 finalised and signed, significant update expected for potential new configuration SIXS Draft 3 finalised and signed, Draft 4 for radiator optimisation in work EID B Issue 1 with configuration control to come by summer / early autumn this year !! MPO Payload EID-B Status

7 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009  Open P/L procurement issues:  Solutions to be addressed without delay  Firm up and finalise P/L experiment interface definition for H/W phase:  Partly achieved, but still missing elements  Consolidation to be addressed without delay  P/L accommodation and local interfaces to be confirmed and detailed:  Ongoing activity, as part of PDR with minor adjustments only  H/W phase comes upon us, and requires significant more attention to detailed work and close interaction and reporting  In view of the above and the observed IPDR results:  Please stop “nice-to-have” optimisation dreams  Keep momentum and intensify P/L work  Adopt the “Yes We Can” attitude – also we got to get out of a crisis ! MPO Payload Priorities

8 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009  The Critical Equipment Review was held between September-December 2008  Critical technological elements were reviewed  Highly useful exercise and confirmed many technologies that are not considered critical any more  Some remained open and were further studied in spring 2009, such as solar arrays, antenna pointing mechanism and wave guide  The CER board met on 18 December 2008  Recommended to start the PDR activity  Recommended that Collocation Meeting should be organized only after the test results on the solar array are available  Gave critical notes on the mass traceability and maturity of technology for solar array, antenna pointing mechanism and waveguides Critical Equipment Review

9 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009  The PDR Kick-Off was held on 10 March  The CER Board provided guidance to the review team and recommendations on work by the Prime before collocation  The SPC Tracking Committee follows the PDR and advises the SPC  Major items were:  Overall mass budget with increasing trend remains a major concern (10% margin!)  S/W and AOCS complexity and development schedule  AIV (accessibility of equipment, schedule)  Solar Array  Contamination risk by thruster plumes  Collocation meeting with Astrium on 4 – 7 May  The PDR Board meeting on 29 May PDR Activities and Issues

10 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009  Preliminary draft recommendations of the PDR board are not yet public  The PDR Board recognized significant development accomplished during the past 12 months  The board believes strongly that BepiColombo will fly  Solar arrays are adequate for the Mercury environment and are currently tested for at 200 C for hrs at 230 C for hrs  The results confirmed the expectations of solar cell aging  The PDR Board will reconvene in September to discuss the remaining key issues, such as mass and solar array  Final PDR meeting in November is for closing the RIDs and AIs  The BepiColombo CaC needs to be confirmed after the summer in order to issue the SPC paper in September for the SPC meeting on 2 October 2009 PDR Results

11 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June 2009  Manufacturing of STM is in final stage at JAXA, test preparations on-going  Tests on EM are on-going  On-board S/W requirements review completed  Launcher coupled load analysis confirmed acceptable notching profile  Characterization tests of thermal hardware and solar cells are on-going  Issue: Solar array appears to have too little margin to cover UV degradation, temperature uncertainties and modified cosine law. Addition of one solar cell string is under consideration (MMO height increase of 16 cm) MMO Status