GlueX collaboration meeting, Bloomington, May 9-11, 2011 1 Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.

Slides:



Advertisements
Similar presentations
Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich,
Advertisements

Thin Diamond Radiator Characterization at CHESS for The GlueX Experiment Brendan Pratt 1, Alex Barnes 1, Nathan Sparks 2, Liana Hotte 1, Ken Finkelstein.
Thin Diamond Radiator Fabrication for the GlueX Experiment Brendan Pratt with Richard Jones University of Connecticut NDNC
1 James M c Intyre. 2 Outline Overview  TAGM Milestones  Documents & Travelers  Personnel Training  Special Training & Hazards Construction Plan 
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Microscope Performance at elevated dark rates Richard Jones University of Connecticut collaboration GlueX collaboration meeting, Newport News, Feb. 2-4,
Diamond Radiator Development Brendan Pratt University of Connecticut GlueX Collaboration Meeting, Jefferson Lab, February
Abstract At the Thomas Jefferson National Accelerator Facility in Newport News, Virginia, a team of nuclear physicists has come up with a way to probe.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Experimenting with Quarks Prof. Richard Jones University of Connecticut, Storrs Science Symposium, Darien High School, May 28, 2008.
Photon Beam and Tagger working group status report Richard Jones Catholic University Glasgow University University of Connecticut University of Connecticut.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
Disassemble, Assemble and Perform a Function Check on the M9
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou.
Diamond Radiator Thinning and Mounting for GlueX R.T. Jones GlueX collaboration meeting, Regina, Sept. 9-11, 2010.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
Study of Sampling Fractions Shin-Shan Yu, A P, Hans Wenzel, October 18, 2006.
Design Progress Allen Ellis 18-September
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
Electronics play a critical role in modern accelerator physics experiments. Events will be recorded at a rate of 200,000/second. Modular electronics such.
Diamond Radiator Fabrication & Assessment Update Brendan Pratt Richard Jones University of Connecticut.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Status Update: Diamond Radiator Procurement and Processing for GlueX Richard Jones, University of Connecticut GlueX collaboration meeting, Newport News,
Thomas Jefferson National Accelerator Facility Page 1 IPR June 26-28, 2007 Tagger microscope R&D: silicon photomultiplier tests integrate pulsesintegrate.
1 IRL Status and Plans Kurt Francis NICADD/Northern Illinois University AHCAL MEETING DESY, Hamburg December 9, 2013.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Diamond Radiator Fabrication and Assessment Brendan Pratt Fridah Mokaya Richard Jones University of Connecticut GlueX Collaboration Meeting, Jefferson.
CLAS12 Drift Chamber Prototyping
Diamond Radiator Fabrication and Assessment Brendan Pratt Fridah Mokaya Richard Jones University of Connecticut GlueX Collaboration Meeting, Jefferson.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Progress in Diamond Target Fabrication University of Connecticut: Brendan Pratt Fridah Mokaya Richard Jones GlueX Collaboration meeting, Newport News,
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Modules components procurement EU Lead US Lead EU Scintillators US Scintillators EU Bond Paper US Bond Paper EU Straps US Straps EU BackPlate US BackPlate.
BCAL R&D Rheanne Filby, Blair Jasper, Gergana Koleva, Blaine Langman, Tasha Summers Vitaly Kovaltchouk, George Lolos, Zisis Papandreou GlueX Collaboration.
CDMS II Shielding To Installation To Construction From Design.
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
VELO Replacement Girish Patel University of Liverpool.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
IFR Detector R&D status
Planning for Proto-DUNE PD Installation and Cabling at CERN
Wander baldini on behalf of the SHIP Muon Group
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
WBS 1.03 Readout Systems Scope, Cost and Schedule
G0 Detector Working Group Meeting
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
IFR detector mechanics
大強度
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Tagger Microscope Mounting, Shielding & Cooling
Undulator Assembly Procedure
Tagger Microscope Detector & Electronics Status
Status of the EUDET Prototype
Gattini Detector Installation
Presentation transcript:

GlueX collaboration meeting, Bloomington, May 9-11, Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain 2.fabricate glass ferrules for square fiber fuser 3.cut and rough-polish 500 scintillating fiber sections 4.fine-polish one end of the scintillating fibers 5.cut and rough-polish 500 clear light guides 6.fuse light guides to the scintillators 7.fine-polish the end of the clear light guides 8.paint the contact surfaces of the fibers 9.epoxy the scintillating fibers into 5x5 modules 10.attach reflective mylar to the upstream module ends Richard Jones

GlueX collaboration meeting, Bloomington, May 9-11, UConn construction contract, continued 11.construct the detector housing 12.construct extended motorized rail system 13.install rail system in the detector housing 14.install several fiber modules on the rail system, verify tolerances 15.install test pulser system in the detector housing

GlueX collaboration meeting, Bloomington, May 9-11, UConn construction contract, part II 1.order the SiPM’s 2.order parts for the electronics boards 3.send off design, parts for PCB construction and assembly 4.construct electronics housing 5.install chimneys in electronics housing 6.insert subset of fiber modules into chimneys 7.receive boards from manufacturer, test in dark box 8.install boards in housing 9.install duct between detector and readout housing 10.test subset of modules using the test pulser

GlueX collaboration meeting, Bloomington, May 9-11, UConn construction contract, continued 11.disassemble and ship to JLab

GlueX collaboration meeting, Bloomington, May 9-11, UConn construction contract, part III 1.order diamond plates from vendor 2.assess original plates using X-rays at CHESS 3.submit one set of plates to Sinmat for thinning 4.submit second set of plates for laser cutting 5.assess thinned plates a second time at CHESS 6.if ok, submit cutout plate and thinned plate to Sinmat for bonding together 7.mount bonded radiator assembly on HT mount 8.assess assembled and mounted radiators at CHESS 9.ship to JLab for mounting on GlueX goniometer target ladder