Www.ztt.fh-worms.de Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom software Benjamin Schockert.

Slides:



Advertisements
Similar presentations
TRD-DCS Workshop, Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom.
Advertisements

Max Mustermann Folientitel Veranstaltung Online Steering of HEP Applications Daniel Lorenz University of Siegen Cracow Grid Workshop –
Zentrum für Multimedia in der Lehre Yildiray Ogurol Center for Multimedia in Higher Education eLene-TT eLearning Network Teachers Training Kick-Off-Meeting,
Tom Sugden EPCC OGSA-DAI Future Directions OGSA-DAI User's Forum GridWorld 2006, Washington DC 14 September 2006.
Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of theFedServer Benjamin Schockert Sebastian.
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
Intelligence for Environment and Security – IES Solutions JIXEL The first web 2.0 Joint Control room Massimo Cristaldi, CTO.
TPC electronics meeting, /14 Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Normal text - click to edit FeeServer: (version 0.9.2) ( ) S. Bablok (IFT, University of Bergen)
Normal text - click to edit FeeCom software during TPC commissioning (Benchmarks) Sebastian Bablok Dag Toppe Larsen Matthias Richter Benjamin.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
TRD dcs workshop, Heidelberg, Jan 22, TRD Feeserver/controlEngine Kai Schweda, University of Heidelberg R. Bramm, B. Doenigus, T. Dietel, D. Emschermann,
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
Query Processing in Mobile Databases
RMS Importer/Exporter Create configuration for the MedAustron Control System PP a-ABR_RMSImporterExporter.pptm abrett/mmarchha RMS Importer/Exporter.
Experimental Physics and Industrial Control System (EPICS) Alarm Handler (ALH) Bob Dalesio, August 14, 1999.
EAAP Working Group on AGR EAAP-WG-AGR Report on activities June 2005 to August th Workshop for European National Co-ordinators for the management.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
K.Harrison CERN, 21st November 2002 GANGA: GAUDI/ATHENA AND GRID ALLIANCE - Background and scope - Project organisation - Technology survey - Design -
MDT PS DCS for ATLAS Eleni Mountricha
D etector C ontrol S ystem HMPID SB G. De Cataldo CERN-CH, A. Franco & A. Nardulli INFN Bari, I 1 HMPID Updates and prototyping HMPID DCS with.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Developments in networked embedded system technologies and programmable logic are making it possible to develop new, highly flexible data acquisition system.
Chapter 8 Evaluating Alternatives for Requirements, Environment, and Implementation.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Responsibilities & Planning DCS WS L.Jirdén.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
ALICE, ATLAS, CMS & LHCb joint workshop on
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Registers are always 32 bit / 4 byte memory is accessed directly when memory cannot be accessed kind of flag is on.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY.
Final Class Diagram for C++ Implementation Clickermatic Software Clicker.
RIPE ncc 25th June CENTR Workshop The RIPE NCC Request Tracking System Maldwyn G.T. Morris RIPE NCC.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
Communication Layers Protocol Commands Results Command Specs Command Framework Database Access PVSS Server TOC ,
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Status of InterCommunication on FeeControl Meeting Report Communication between DCS-Layers State of Sebastian Bablok Christian Kofler Ralf Keidel.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Source Controller software Ianos Schmidt The University of Iowa.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
LCG Distributed Databases Deployment – Kickoff Workshop Dec Database Lookup Service Kuba Zajączkowski Chi-Wei Wang.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Presentation transcript:

Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom software Benjamin Schockert Ralf Keidel Zentrum für Technologietransfer und Telekommunikation FH-Worms

DCS-Workshop TOC Status of FeeCom software Schematic view of FeeCom chain Status of the different InterCom parts Status of FeeCom chain and funding Zentrum für Technologietransfer und Telekommunikation FH-Worms

DCS-Workshop FED Server FEE Client InterCom Layer Config from Database PVSS Cmd / ACK Channel Service Channel FED Client... FeeServer incl. CE FeeServer incl. CE FeeServer incl. CE Command (Broadcasts) Cmd ACK Acknowledges Service Services... [config from file also possible ] Command- Coder Load configuration data for DCS-Boards from DB Zentrum für Technologietransfer und Telekommunikation FH-Worms

DCS-Workshop FedServer implementation status All service channels of the FedApi are completely implemented All command channels of the FedApi are completely implemented Communication between PVSS and FedServer work Zentrum für Technologietransfer und Telekommunikation FH-Worms

DCS-Workshop Database interface implementation status Database structure for InterComLayer defined Final database interface in the InterComLayer implemented Zentrum für Technologietransfer und Telekommunikation FH-Worms

DCS-Workshop InterComLayer database structure Two tables/views are required The first store the FeeServer name and the position in the detector The second store the corresponding servicenames the FeeServer offers Zentrum für Technologietransfer und Telekommunikation FH-Worms Target Name: TRD-FEE_X_Y_Z FEESERVICES FEE

DCS-Workshop InterComLayer database structure Zentrum für Technologietransfer und Telekommunikation FH-Worms

DCS-Workshop CommandCoder interface implementation status Zentrum für Technologietransfer und Telekommunikation FH-Worms New CommandCoder error handling introduced CommandCoder interface complete implemented A CommandCoder skelleton exists to simplify the development of a adapted CommandCoder

DCS-Workshop FeeCom software and funding Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCom software stable Funding for the ZTT has already end in June 2006 Transition? FeeCom software is now stable and should be suited for deployment. Since June the ZTT finances the project by their own capital. At the November the 15 th the development and the support of the InterComLayer will end. We are currently discussing possible options for a short transition phase after which we will no longer be able to provide support. Any suggestions would be appreciated.