SMU SE – LMMFC Collaboration Project Task 1 Approach and Process Systems Engineering Program Engineering Management, Information and Systems Department.

Slides:



Advertisements
Similar presentations
Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov
Advertisements

Process and Product Quality Assurance (PPQA)
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
OPM and CAR Once special causes are removed from the execution of your chosen process in a project it is now possible to address common causes of variation.
1 Software Requirement Analysis Deployment Package for the Basic Profile Version 0.1, January 11th 2008.
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
ESC/EN Engineering Process Compliance Procedures August 2002.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
Managing Project Quality
What is Business Analysis Planning & Monitoring?
Using Six Sigma to Achieve CMMI Levels 4 and 5
Chapter : Software Process
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
1 ‘Title’ Deployment Package for Profile X Version X – Month-Day-20XX.
CMMI Course Summary CMMI course Module 9..
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
Copyright © 2009, Systems and Software Consortium, Inc. Introduction to an Integrated Lean Thinking, Six Sigma  and CMMI  Approach for Process Improvement.
Integrated Capability Maturity Model (CMMI)
Capability Maturity Model® Integration (CMMISM) Personal Prof. Dr. ir J. De Man CMMI (personal)
Handouts Software Testing and Quality Assurance Theory and Practice Chapter 18 Maturity Models
Performance Technology Dr. James J. Kirk Professor of HRD.
Evaluation Basics Principles of Evaluation Keeping in mind the basic principles for program and evaluation success, leaders of youth programs can begin.
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
11 Explanation to Participants about this template and final presentation This template is meant as a Six Sigma / Re engineering Submission Template This.
Chapter 2 Process: A Generic View
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
Software Process Models
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
Adaptive Processes Overview Adaptive Processes©. Adaptive Processes © Adaptive ProcessesSimpler, Faster, Better2 Objective To provide an over view of.
1 通信软件开发与管理 Course OD601 学时: 32 学分: 2 讲师:罗文彬. 2 Communication Overview System Architecture Overview Performance and Reliability Operation, Administration,
Software Engineering - I
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
CMMI. 1.Initial - The software process is characterized as ad hoc, and occasionally even chaotic. Few processes are defined, and success depends on individual.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Michael Campe U.S. Army Aviation and Missile Command NDIA TID Technical Information Division Symposium Royal Sonesta Hotel, New Orleans, LA August 2003.
1 Agenda for measurement r1. CMMI r2. Other thrusts.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Guidelines for Process
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
Space and Airborne Systems Prepared For 3rd Annual CMMI Technology Conference Presented In Denver, CO Tom Cowles November 19, 2003 Peer Reviews For CMMI.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
UNIT 5.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
A Comparison of CMMI & SPICE
Causal Analysis & Resolution (CAR) Support Category
Introduction to Methods Engineering
ISCOM 472 Course Experience Tradition / iscom472.com
iscom 472 mart Your world/iscom472martdotcom
Level - 3 Process Areas (CMMI-DEV)
CMMI – Staged Representation
ISCOM 472 NERD Lessons in Excellence -- iscom472nerd.com.
Explanation to Participants about this template and final presentation
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Chapter 4: Software Process Models
Presentation transcript:

SMU SE – LMMFC Collaboration Project Task 1 Approach and Process Systems Engineering Program Engineering Management, Information and Systems Department School of Engineering Southern Methodist University March 9, 2006

Task 1 Approach and Process2 Problem Statement Make specific recommendations as the application of LEAN methods in the development of LMMFC organizational processes to satisfy the Level 5 requirements. Make specific recommendations as the application of other initiatives (such as Six Sigma) in the development of LMMFC organizational processes to satisfy the Level 5 requirements.

Task 1 Approach and Process3 Content 1.SMU Process Flow Chart and Description 2.Excel Spreadsheet with Initiatives Identified and Support Documentation 3.QFD Matrix with Initiatives Identified

Task 1 Approach and Process4 Section 1 SMU Process Flow Chart and Description

Task 1 Approach and Process5 Flow Chart of the SMU Process

Task 1 Approach and Process6 Select an Initiative It has potential to apply to Maturity Level 5: Optimizing. –Selection Criteria May provide incremental and innovative improvement of the organization’s: –Processes and/or –Technologies May provide guidelines and recommendations for identifying causes of defects and other problems May provide guidelines and recommendations for defect prevention.

Task 1 Approach and Process7 Document the Initiative Determine the main category in which the initiative is representative, i.e., quality, management, production, design engineering, reliability, etc. Describe the central idea of the initiative. History –Start year –Created by –Companies who have used it successfully

Task 1 Approach and Process8 Document the Initiative (cont.) List of key elements of initiative –Describe key element –Describe benefits of each key element Describe how the initiative relates to a specific CMMI Level 5 Goal and Practice. –Specify which CMMI Level 5 Goal and Practice to which it relates. Document whether the initiative status is current or emerging. Document the group reference number and reference information.

Task 1 Approach and Process9 Document the Initiative (cont.) If the information relates to a CMMI Level 5 practice, enter the reference number in the Excel spreadsheet, CMMI Level 5 Initiative Identification Table. Enter the reference data in the Reference tab data sheet.

Task 1 Approach and Process10 Section 2 CMMI Initiatives Identification Spreadsheet

Task 1 Approach and Process11 Initiatives The identified initiatives include: –Production/Manufacturing Lean –Quality Six Sigma –Engineering Axiomatic Design –Emerging Technologies Systematic Innovation Systems Engineering Innovations PHM Applications to Product Development Enterprise Systems Engineering –Enterprise Intrapreneurship –Business/Technology Innovation –Tools Product Development Process Analysis & Optimization

Task 1 Approach and Process12 CMMI Initiatives Idenfication Spreadsheet The excel spreadsheet includes –Identified initiatives –References –Process flow chart –Documentation completed for each initiative

Task 1 Approach and Process13 Section 3 QFD Spreadsheet

Task 1 Approach and Process14 CMMI ML5 Overview Optimizing Organizational Innovation and Deployment Causal Analysis and Resolution SG1 – Select Improvement SP1.1 – Collect and Analyze Improvement Proposals SP1.2 – Identify and Analyze Innovations SP1.3 – Pilot Improvements SP1.4 – Select Improvements for Deployment SG2 – Deploy Improvements SP2.1 – Plan the Deployment SP2.2 – Manage the Deployment SP2.3 – Measure the Improvement Effects GG3 – Institutionalize a Defined Process GP2.1 – GP2.10, GP3.1 – GP3.2 SG1 – Determine Causes of Defects SP1.1 – Select Defects for Analysis SP1.2 – Analyze Causes SG2 – Address Causes of Defects SP2.1 – Implement the Action Proposals SP2.2 – Evaluate the Effect of Changes SP2.3 – Record Data GG3 – Institutionalize a Defined Process GP2.1 - GP2.10, GP3.1 – GP3.2

Task 1 Approach and Process15 Flowdown of ML5 Specific Goals and Practices Focus of study is on the Identification of Initiatives, Methods, and Tools and the corresponding Relationships that support the achievement of Goals and Practices for CMMI ML5