Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS 8615 100 Bureau Drive Gaithersburg, MD 20899 (301) 975-8701.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Program Management Office (PMO) Design
Roadmap for Sourcing Decision Review Board (DRB)
STATUS OF ASME CC N-755 & N-808 Frank J Schaaf, Jr Sterling Refrigeration Corp NESCC Meeting Washington DC 18 April 2013.
ASME SMR ROADMAP (STP-NU-072)
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
Sourcebook for Hydrogen Applications Expansion & Dissemination Jeffrey Serfass General Manager Partnership for Advancing the Transition to Hydrogen APEC.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
MFRPS Lesson Learned North Carolina
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
ASME / NRC Management Meetings Kevin Ennis Director, Nuclear C&S Ryan Crane C&S Project Engineering Manager ASME 2 Park.
Steve Lefler - Principal Engineer Duke Energy
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
ASTM International Nuclear Initiatives Roadmap Steve Byrne and Joe Koury March 2013.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
AERC Members’ Meeting April 8, 2015 Alexandria, VA 4/8/2015Attachments Energy Rating Council1.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Unit 1 Community Capabilities
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Timeline of Roadmap Development 2013 Today Feb: NESCC developed an interconnecting roadmap between research – NRC questions – Standards & Codes Apr: ASME,
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Training of Process Facilitators Training of Process Facilitators.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
PCR Status report AESAG, September Supported by:
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
NSDI Strategic Plan Update FGDC Coordination Group Meeting September 10, 2013.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
National Institute of Standards and Technology Information Technology Laboratory 1 USG Cloud Computing Technology Roadmap Next Steps NIST Mission: To promote.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
WisDOT Implementation of 3D Technology & Methods in Design & Construction 2009 Contractor/Engineer Conference WTBA & WisDOT January Jerry H. Zogg,
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
NSDI Strategic Plan Update Federal Geographic Data Committee Meeting September 12, 2013.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Standards and Interoperability Framework Primer of S&I Phases, Procedures, and Functions.
The Integrated Coastal and Oceans Observation System Act of 2009: Implementation 2009 IOOS Regional Coordination Workshop Thursday, August 27.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
Worldwide Protein Data Bank wwPDB Common D&A Project Full Project Team Meeting Rutgers March 16-19, 2010.
State of Georgia Release Management Training
Introduction to Codes, Standards, and Regulations.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Parks & Recreation Service Delivery Model Review Progress Report #1 City of Pitt Meadows Council January 19,
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
Implementing Program Management Standards at Duke Energy.
Service is the difference MEA Roundtable October 30, 2007.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Gulf of Honduras Task Group 1 Process
Best Practices Program Contact – Role & Responsibility Overview
Gulf of Honduras Task Group 1 Process
Presentation transcript:

Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)

NESCC HDPE Status: PPTG report released in January 2013 Held a workshop on February 28, 2013 to discuss merger of NESCC and ASME HDPE Roadmaps Continue to Formalize Roadmap with communication between ASME and NRC Held meeting at NRC on March 14, 2013 to discuss input on short term priorities. Planning 2 nd workshop for April 18, 2013 to further progress in creating a “Joint HDPE Roadmap” plan

ASME Roadmap Implementation Issues Planning Resolutions Standards Development Endorsement Capturing Issues from Regulators and industry Prioritization of Issues/concerns with input from NRC, DOE, SDOs and industry Confirm Regulatory acceptance of priorities Identify projects: utilize ASME’s HDPE Roadmap, NESCC’s report & other sources Develop project scope Establish tasks, schedule & budgets Identify target code case or standard Identify funding Coordinate with other SDO’s, & government entities. Obtain regulatory buy- in on the plan forward Solicit Contracts with R&D Entities Oversee R&D Projects Review Results Share Final Findings and Outcome with Committees/NRC Confirm regulatory agreement of Issue Resolution Standards development and writing Revise or create Technical Concerns, Code Cases or Standards Consensus process Adoption to the Code NRC participation in first 4 phases lead to standards endorsement Obtain NRC endorsement of new or modified code cases or standards

HDPE Roadmap Workshop EPRI Headquarters February 28, 2013 Objective:  Coordinate the NESCC and ASME “Joint Roadmap” efforts. Let’s work from one template.  Identify potential short and long term R&D projects, deliverables, and standards impacts.  Prioritize projects  Identify current efforts on R&D, both confirmatory and new research Attendees: DOE, NRC, ASME, ASTM, EPRI, NIST Deliverables:  Consensus Roadmap with basic prioritization  Develop an understanding of current efforts and future research efforts required  Methodology to track progress at ASME  Methodology to prioritize projects and sub-tasks  Strategy for Stakeholder engagement (Future Meeting)

Move away from a numbered list to an actionable plan…. 1.NESCC – HDPE use by Catawba Nuclear Station, Steve Lefler, Duke Energy 2.NRC Issues Regarding the use of HDPE piping in safety-related nuclear applications, Use of HDPE for Power Plant Piping Systems Workshop, June 7-10, 2010 North Carolina 3.STP-NU-YYY ASME Code Development Roadmap for HDPE Service Pipe in Nuclear Service, under revision 4.NESCC Polymeric Pipe Task Group Report, 2012, balloted for draft Need or ConcernIdentified Need? 1 Thin wall vs. thick wall and thermal gradients NRCASME 2 Fusion Joints 2a Validated and standardized fusion joint test for short and long term performance NRCASMENESCC 2b Butt fusion standardization and qualification NRCASMENESCC 2c Electrofusion standardization and qualification NRCASMENESCC 2d Essential variables for fusion of all materials NRCASMENESCC 2e Qualification procedure personnel and equipment NRCASMENESCC 2f Long term performance of fusion joints (SCG resistance) NRCASMENESCC 2g Performance based fusion procedure, performance, equipment NRCASMENESCC 3 Expanded standards for fittings and design ASMENESCC 4 Allowable stress for service temperature up to 140 F NRCASMENESCC 5 Determination of allowable surface flaw up to 10% of wall thickness NRCASMENESCC 6 Long term performance 6a Creep behavior at elevated temperature and transient temperature and pressure NRCASME 6b Fracture mechanics qualification for crack growth ASME 6c Substantiation of linearity of HDB curve at 140 F NRCASMENESCC 6d Incorporation of chemical degradation into standards NRCASMENESCC 7 Pipe hangers and supports NESCC 8 Seismic design ASMENESCC 9 Fire Resistance ASMENESCC 10 Visual and volumetric testing qualifications and requirements NRCASMENESCC

Prioritization: Prioritize according to Code Deliverables: i.Short term (under 3 years) 1.Specify as “A” priority 2.conditioned code case: N755 (Section III) and 808 (Section XI) 3. currently working to finalize these priorities. Hard deadline is April 18, ii. Med term (under 5 years) 1. Specify as “B” priority 2.Collecting identified research gaps. Negatives resolved to go from conditionally accepted to fully accepted. iii. Long term (under 10 years) 1.Accept conditions and details into ASME code a.N755 (Section III) and 808 (Section XI) 2.Fully accepted code case with no conditions

Interconnecting Roadmap

Short Term (Conditioned CC)

Medium Term (Unconditioned CC)

Methodology to Commonize Roadmaps: Basic level:  Do they have the same information Answering the questions:  What are all the issues?  Why these issue are critical?  What needs to be done for conditional endorsement and then for full endorsement?  Priorities within a group?  What issues have been resolved, what activities under way including research and what research still needs to be done?  Project timing for new activities and research?.

Methodology to Track Progress: Go through 1 line of the ASME tracking spreadsheet Go through 1 topic of the research plans Need to switch to Excel during presentation

Concerns: Main concerns (personal view): Acceptance of this path forward in ASME volunteer community Developing a champion within the community of stakeholders Stewardship of roadmap Fostering communication between the stakeholders and regulators Funding those tasks that require more than code writing in the short term

Stakeholders Meeting Objective: Educate the economic and operational case for HDPE code acceptance, Demonstrate the current regulatory and engineering challenges for HDPE usage that have limited deployment, Identify impact of conditional approval on market development, Present effort to manage existing ASME and NESCC R&D priorities into one Roadmap to support short and long term design, implementation, and regulatory goals, Gain feedback from relevant industries regarding implementation and support of this process Attendees: Utility Operators, Plant Design and Construction, Plastic Pipe producers, NRC, ASME