Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.

Slides:



Advertisements
Similar presentations
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Advertisements

Software Engineering.
Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.
Development and Quality Plans
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
1 WIN-WIN MANAGEMENT: USING A TASK BASED SYSTEM TO IMPROVE PRODUCTIVITY Berkshire Advisors, Inc.
Mats Lindroos Technical report Mats Lindroos on behalf of The ISOLDE team.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
ISOLDE: the Anglo-Saxon Era Peter Butler* + Vikings, Visigoths, Celts, etc. *University of Liverpool.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
The HIE-ISOLDE Faraday Cup
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Mats Lindroos REX, ISOLDE and off-line controls Mats Lindroos on behalf of the ISOLDE team.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
ICE SECTION The coolest place to be! Elias Métral
Machine operation and daily maintenance management in SOLEIL
Controls & software Andy Butterworth.
IT-CM Group Meeting Tim Bell 12th January 2016
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Safety in Construction and Upgrade Phases
Renovation of the 45-year old PS magnets
RF operation of REX-ISOLDE
Overview & baseline of LS2 and roadmap for CRG
Alexander Herlert, CERN (PH-SME-IS)
ISOLDE Technical report for INTC 21/5/2007
Magdalena Kowalska, CERN PH-SME-IS
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Mats Lindroos for The ISOLDE team
Technical report Mats Lindroos.
Thomas Nilsson, CERN EP/IS
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos

Outline Shutdown HIE-ISOLDE ATC summary

Mats Lindroos Shutdown ISOLDE shutdown coordinator: Erwin Siesling, AB/OP Shutdown planning available on the WEB –ISOLDE technical meeting minutes Please let Erwin know when you start work, complete work or of possible delays Main tasks 2007: Mini-move, repair of Boris tube(s), RFQ cooler installation

Mats Lindroos HIE-ISOLDE The ISOLDE upgrade group has proposed a staging of the project with the 5.5 MeV/u upgrade having highest priority –Stage 1 (High priority): 13.5 MCHF+32 FTE –External contributions so far: 3.8 MCHF+4 FTE Flemish Research foundation, University of Leuven, Knut and Alice Wallenberg foundation, EPSCR Funding for HIE-ISOLDE discussed in CERN white paper –Theme 4, 50% external funding Started activities: –Prototyping of linac, RILIS/LARIS, RFQ cooler

Mats Lindroos ATC/ABOC review 2006 Session on ISOLDE –Chaired by Steve Myers –Scientific secretary: Fredrik Wenander Five presentations covering: –ISOLDE physics, operation, Targets, REX and organization

Mats Lindroos Physics programme (Luis Fraile) ISOLDE is a world leading RIB facility –Delivers a large fraction of RIB-ISOL beams in Europe Difficult start-up in 2006 –Four experiments had to leave empty handed In spite of the difficult start-up 350 shifts delivered –Almost as many as in 2005 (ISOLDE alone) The REX and RILIS systems are in increased demand –Flagship systems at ISOLDE which attracts new Users and makes new physics possible

Mats Lindroos Operation (Tim Giles) Problems during start-up –Many but uncorrelated problems –The power cuts were outside the control of the section (department) Shutdown/start-up coordination –The cold checkup must not be compromised by testing and delays –We need close hands-on shutdown coordination –We need daily coordination meetings during start-up in addition to weekly status meetings Targets must be handed over to operation early enough –Person to follow target from workshop to experiment? Machine supervisors need better and more target training –Closer interaction between ISOLDE and PSB operators –ISOLDE specific training for all PSB operators As the complexity of the facility increases the machine supervisors have an increasingly heavy workload –REX and RILIS operation will add to the workload (beyond possible) –Priorities for 2 nd job of supervisors not clear The specification procedure for application programs is heavy –Short-cuts possible if done within section? –More use of commercial software? –However, we must stick to AB standards to simplify support (Comment: Steve) The inflector zone could ease operation –In particular coordination with PS running and interventions –The zone must re-structured from safety viewpoint

Mats Lindroos Targets (Thierry Stora) The limited resources in the section demands a limit on the number of UCx targets per year The support for the experimental area need a dedicated technician The targets should be followed from workshop, through target test and to the experiment –Valuable support from EURISOL staff and MC fellows for target tests Consolidation required: –The tape station is crucial for ISOLDE and in desperate need of consolidation –The front-ends must be replaced regularly, done on operation budget as there is no consolidation money available Radiation protection: –Disposal of targets and work in the class A lab require a RP technician continuously –Many tasks during the shutdown requires that a Radiation Protection technician is present

Mats Lindroos REX (Fredrik Wenander) REX-ISOLDE is the flagship programme of ISOLDE –The machine delivers a high number of shifts reliably 18 out of 20 runs successful in 2005 and 2006 The low energy part ticks like a clock –EBIS cathode change requires complete bake-out Linac RF power supplies not yet reaching specifications –Work in progress this shutdown The pressure on the small specialist team has been extremly high –Set-up during weekend. On-call: 10 weekends/specialist –Technical support largely done by two machine specialists –OP technician joined team in 2006 and is just completing the training to become part of piquet team –The support groups still have very limited knowledge of REX –No dedicated superintendent –We should not split the machine in a low energy and linac part. The migration of the control system to AB standards has taken a lot of resources for no improvement –Re-specify existing Visual Basic programs

Mats Lindroos Organization (Jacques Lettry) The ISOLDE operation is too segmented –Need to follow the beam from target to experiment The link between the Users and the machine supervisors must be re- established There are many external contributors but the contributions are highly fractioned –External contributions goes to visible projects leaving support groups to support an ever increasing number of activities We can only hope to re-distribute manpower –Better coordinate the work to save resources –Make use of 2 nd job for operators for ISOLDE maintenance work Could we reduce the workload by reducing the number of shifts and do consolidation instead? –The operational hours are fixed by RB. A reduction must correctly communicated to the Users The RILIS project is also a flagship activity at ISOLDE with an ever increasing demand –The external contributions (such as RILIS/LARIS) grant represents a major consolidation of old systems New projects –Mini-move is externally financed but leaves REX with a more complex system –The RFQ cooler can become a new flagship project of ISOLDE but the external contributions are highly fragmented.

Mats Lindroos Conclusions 1 (Steve Myers) Still to be discussed and agreed by ABMB In spite of a difficult start-up the number of shifts of physics were maintained Flexibility in schedule: –Can the physics coordinator leave more room for recovery after problems? –Investigate if the inflector zone can be made operational again (AB) Safety: –Audit of safety at ISOLDE e.g. need of INB. (AB) Consolidation: –The tape station should be replaced ASAP (AB) –Can we modify the risk analyses so that some limited resources also becomes available for end-users (low impact factor items) (AB)

Mats Lindroos Conclusions 2 (Steve Myers) Still to be discussed and agreed by ABMB Manpower: –The manpower available for radiation protection and vacuum for ISOLDE is critical Software: –ISOLDE should maintain AB standards to ease support. The specification process is demanding but necessary. Organization: –The function of daily technical coordination and technical spokesperson should be separated (AB) –The ATB and OP group will discuss a possible merge/re- organization of the ISOLDE activities to optimize the use of resources (AB) –REX support must be assured on the same level as for the rest of the facility (AB) –The use of the RILIS should be limited to the agreed 1500 hours to free the staff to install the new solid state laser system which represent a major consolidation of the RILIS (AB)