Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg.

Slides:



Advertisements
Similar presentations
Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.
Advertisements

NOTICE SUBMISSIONS Requirements and Procedures 1.
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Bronze Award: Library/Media Center
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Student Center Project Manifesting a Vibrant Learning and Campus Life Experience.
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Design Review Planning to date Project scope summary
STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Crabtree, Rohrbaugh & Associates, Architects Agenda Opening Remarks Overview/Purpose Design.
5S CLÍNICA MÉDICA (MH) 306 A. 5S CLÍNICA MÉDICA (MH) 306 B.
HADDON TOWNSHIP SCHOOLS ELEVATORADDITION FENCE REPLACEMENT REPLACEMENT REPAIR AND RECOAT ASPHALT PLAGROUND SURFACE REPLACE CONCRETE CURBING AROUND THE.
Texas Heart Institute ® ® The Texas Heart Institute at St. Luke's Episcopal Hospital – The Denton A. Cooley Building The Cooley Building has 327,000 square.
1st MEETING IN TRUJILLO 17th/20th NOVEMBER DOME PARTNERS.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Glenvar High School Renovations School Board Presentation
Community Update James Simons School – October 2,
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
ADDITION & REMODEL Eugene Field Elementary School.
C Casaccio Architects LLC 2011 Thomas Memorial Library Authentic Indigenous Intimate Timeless Whimsical A Vision for “A Lighthouse of Knowledge”
Go straight.
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Parent Presentation February 3, 2015
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
INSERT IMAGE TO ILLUSTRATE THE PROJECT OVERVIEW Project Description: Include a short narrative to explain the background to the project including any information.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Construction Report August 18, Projects Site Improvements Track replacement and turf Generators.
New Fabra Elementary School Design Presentation. Play Field Playground Bus Loop Staff Parking Parent Drop-off Parking Johns Rd. Lattimore Blvd. Secure.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
St. Cloud High School Phased Comprehensive Construction Project April 28,
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
MOORE HIGH SCHOOL.  Drills are a first and important step in keeping schools safe and secure. They are filled with teachable moments!
North Augusta High School Design Development Presentation.
County Commission: Preliminary Design Aerial Photo GRACE Marketplace One Stop Homeless Assistance Center Phase-1.
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
BI , North Park Office Complex (AL-MIDRA)
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
Go straight. Turn right Turn left Church Post Office ZooMuseum Park Beac h Hospital Cinem a Bus stop Library Super- market School Go to the Hospital!
Construction Report September 15, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
The New Leavelle McCampbell Middle School Design Development Presentation.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
FREDERICK COUNTY MIDDLE SCHOOL TOUR
LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING MURCIA TOWN PROPER
Hede Architects Pty Ltd Leading Designers in Community Buildings
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Goding Elementary Existing Conditions Presentation February 13, 2013.
Miami Palmetto SHS Replacement
Midland Senior High School Second Floor
Career Resource Center
Facilities Modernization Program
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
HISD Educational Learning Center
Welcome to the Stanford Synchrotron Radiation Laboratory (SSRL) at the Stanford Linear Accelerator Center (SLAC) * 2575 Sand Hill Road, Menlo Park, CA.
Recent Bond Accomplishments
PE/MULTI-PURPOSE ROOM COVERED OUTDOOR LEARNING CENTER
TRAFALGAR PARKWAY (FRONT OF THE SCHOOL)
North Augusta High School – Phase 2A and 2B
Student Center and Fitness Center Catholic High School
The New Leavelle McCampbell Middle School
250 Catalonia Building Remarks:
(*you do not have to include storage closets, etc.) Include a MAP KEY
250 Catalonia Building Remarks:
Dining Services RFP - Building Floor Plans
Presentation transcript:

Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg. Walking track Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Parking Athletic Bldg. Cafeteria Bldg. Old School Bldg Classroom Bldg. Parking Bus stop Hwy 95A Quina Grundhoefer Architects Site Plan

Overall Floor Plan Athletic Building Cafeteria Bldg. Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Classroom Building Old School Building Quina Grundhoefer Architects Overall Floor Plan

Floor Plan – Old School Building Stage Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Auditorium W M Kit. Mtg. Rm Mtg. Rm W M Library Lobby Community Center Office Museum Mtg. Rm. Mtg. Rm Office Main Entry Quina Grundhoefer Architects Floor Plan – Old School Building

Floor Plan – Classroom Building Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Business Incubator Business Incubator Medical Clinic Quina Grundhoefer Architects Floor Plan – Classroom Building

Floor Plan – Cafeteria Building Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Generator Recovery Center Kitchen Stor Quina Grundhoefer Architects Floor Plan – Cafeteria Building

Floor Plan – Athletic Building Ag Extension Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Career Center Quina Grundhoefer Architects Floor Plan – Athletic Building

Aerial View Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Quina Grundhoefer Architects Aerial View

Aerial View Site Plan Overall Plan Old School Bldg. Classroom Bldg. Cafeteria Bldg. Athletic Bldg. Aerial View Quina Grundhoefer Architects Aerial View