Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk,

Slides:



Advertisements
Similar presentations
Comparison of Particle Production between MARS and FLUKA (Update) X. Ding, UCLA Target Studies Aug. 8, /8/13.
Advertisements

Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
POSTER TEMPLATE BY: Presentations.com POSTER TEMPLATE BY: Presentations.com Outlet Inlet n’=375 n=150 n φ =75 (dφ=1.2 ⁰ ) Extra Terms.
6/30/20091 Meson Production with Different Directional Incident Proton Beam X. Ding, D. Cline, UCLA H. Kirk, J. S. Berg, BNL.
Meson Production at 8 GeV for IDS120h X. Ding, UCLA Target Studies, Dec. 27, 2011.
Meson Production Comparison between Hg and Ga at 8 GeV X. Ding, UCLA Target Studies, Oct. 04, 2011.
Meson Production Comparison between HG and GA at 8 GeV (Update) X. Ding, UCLA Target Studies, Oct. 18, 2011.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
Proton Position Tracking X. Ding, D. Cline UCLA H. Kirk, J. S. Berg, BNL Phone Meeting on Aug. 25, 2009.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
1 Meson Production Simulations X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL N u F a c t th International Workshop on Neutrino Factories, Superbeams.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
Optimization of Target Parameters for a Tungsten Target (Half Density) at 8GeV X. Ding Target Studies Nov. 2, 2010.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
1 Muon Yield Comparisons for Different ICOOL Versions and Lattices X. Ding Front End, Nov. 23, 2010.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Proton Position Tracking X. Ding, UCLA Aug. 11, 2009.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Apr. 20, 2010.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Harold G. Kirk Brookhaven National Laboratory Meson Production Calculations 1 st Princeton/Oxford High-Power Targets Workshop Oxford May 1-2, 2008.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass.
Target R&D Kirk T McDonald Princeton University Feb. 19, 2014 February 19, 2014 KT McDonald | DOE Review of MAP (FNAL, February 19-20, 2014)1 Scope of.
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
1 Muon Collider/Higgs Factory A. Caldwell Columbia University Motivation Difficulties Focus on Cooling (frictional cooling)
Shifting the Position of Focal Point of Proton Beam Relative to Intersection Point with Fixed Emittance for IDS120h Configuration X. Ding, UCLA Target.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
K. McDonald NFMCC Collaboration Meeting Jan 14, The Capture Solenoid as an Emittance-Reducing Element K. McDonald Princeton U. (Jan. 14, 2010)
DEPOSITED POWER STUDIES FOR THE MC/NF TARGET STATION. Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012) 1 DEPOSITED POWER STUDIES FOR THE MC/NF TARGET.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
Particle Production at 3 GeV (update) X. Ding, UCLA Target Studies Sept. 23, /23/13.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Beam MC activity A.K.Ichikawa for beam group For more details,
Proton Delivery to Target Keith Gollwitzer Accelerator Division Fermilab MAP 2012 Winter Meeting March 7, 2012.
FRONTEND DESIGN & OPTIMIZATION STUDIES HISHAM KAMAL SAYED BROOKHAVEN NATIONAL LABORATORY June 26, 2014 Collaboration: J. S. Berg - X. Ding - V.B. Graves.
Studies on pion/muon capture at MOMENT Nikos Vassilopoulos IHEP, CAS August 11, 2015.
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Particle Production of Carbon Target with 20Tto2T5m Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies April 3, /3/14.
Beam Dump for Carbon Target with IDS120h Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies Jan. 24, /24/14.
Particle Production with Carbon Target and IDS120j Configuration at 3 GeV (update) X. Ding, UCLA Target Studies Nov. 14, /14/13.
Kinetic Energy Spectra of pi +, pi -, mu +, mu - and sum of all from the 20to4T5m Configuration X. Ding Front End Meeting June 23,
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
Frictional Cooling A.Caldwell MPI f. Physik, Munich FNAL
Context of the Neutrino Factory Neutrino factory (2018) –4MW proton driver –p +   +   +  e + e  Linear e + e − collider (2014/5) –Leptons at 0.4.
Meson Production at Low Proton Beam Energy (Update) X. Ding, UCLA Target Studies May 9, /9/113.
Simulation of High-Power Mercury Jet Targets for Neutrino Factory and Muon Collider R. Samulyak, 1,2 H.C. Chen, 1 H.G. Kirk, 2 K.T. McDonald 3 1 Stony.
ICHEP Conference Amsterdam 31st International Conference on High Energy Physics 24  31 July 2002 Gail G. Hanson University of California, Riverside For.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Optimized Target Parameters and Meson Production by IDS120h with Focused Gaussian Beam and Fixed Emittance (Update) X. Ding, UCLA AAG June 27, /27/12.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
Meson Production Efficiencies
Presentation transcript:

Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk, H.K. Sayed, BNL, Upton, NY N. Souchlas, R.J. Weggel, Particle Beam Lasers, Inc., Northridge, CA 91324, USA V.B. Graves, ORNL, Oak Ridge, TN 37830, USA K.T. McDonald, Princeton University, Princeton, NJ 08544, USA (MOPPC044, IPAC12) Abstract We consider the potential for a free-flowing gallium jet target as an option for a Muon Collider or Neutrino Factory. Using the MARS15 code, we simulated particle production initiated by incoming protons with kinetic energies between 2 and 16 GeV. For each proton beam energy, we optimize the geometric parameters of the target: the radius of the liquid jet, the incoming proton beam angle, and the crossing angle between the jet and the proton beam. We compare the quantity of generated muons using this type of target to the case in which a free-flowing mercury jet is utilized. Conclusions We have simulated the IDS120h target configuration using Gallium and Mercury as its target material. With optimization, the Hg jet has target radius of 4.04 mm, beam/jet crossing angle of 20.6 mrad and beam angle of 117 mrad. While the Ga jet has target radius of 4.4 mm, beam/jet crossing angle of 13 mrad and beam angle of 88 mrad. In addition, it shows that production from Ga peaks near KE = 5 GeV and is comparable to that from Hg at that KE. Dynamic aperture of the modified (bottom) racetrack lattice. 1. Motivation to Optimize GA target Pion/muon yields for different atomic Z’s and beam energies (J. Back) Advantages of Gallium as a possible target alternative of HG: Relatively efficient meson production (near the peak for nickel), Liquid state at relatively low temperature (melting point = 29.8  C), Potential for easier handling,. 5. Optimized results from 2 to 16 GeV References 1. X. Ding, et al., “Optimization of a mercury jet target for a neutrino factory or a muon collider”, Phys. Rev. Spec. Top. Accel. Beams 14 (2011) N.V. Mokhov, “The Mars Code System User's guide:, 3. S. Osaki, R. Palmer, M. Zisman and J. Gallardo, eds., Neutrino Factory Feasibility Study 2, BNL (2001), Ch H. Kirk, “Target System Update”, IDS-NF Plenary Meeting, Arlington, VA, J. Back, “First look at ,  yields vs atomic Z”, 6. N.V. Mokhov, Nucl. Instrum. Methods Phys. Res., Sect. A 472, 546 (2001). 2. Target/Collection and Axial Field with IDS120h Configuration 3. Target Geometry and Optimization Method Count all the pions and muons that cross the transverse plane at z = 50 m. For this analysis we select all pions and muons with 40 < KE < 180 MeV. 1. Fix beam/jet intersection point at (0, 0, cm). 2. Initialize target parameters at proton KE of 8 GeV: target radius of 5 mm, beam angle of 67 mrad at z = cm, beam/jet crossing angle of 33 mrad at z = cm. Optimization method: Take 3 runs in each cycle: 1) Vary jet radius with initial beam angle and beam/jet crossing angle; 2) Vary beam/jet crossing angle with new target radius while keeping jet fixed - always project beam back to z =-200 cm; 3) Vary the beam angle with the new target radius while adjusting the jet angle to always maintain a constant beam/jet crossing angle. Repeat above cycle until convergence. HG GA Target radius, mm Crossing angle, mrad Beam angle, mrad Target radius, mm Crossing angle, mrad Beam angle, mrad Initial(5mm, 33mrad, 67mrad) 1 st Cycle nd Cycle rd Cycle th Cycle th Cycle th Cycle Optimization Results at 8 GeV 6. Comparison with Previous Studies for Hg