Www.see-grid-sci.eu SEE-GRID-SCI NA1-Technical Execution Plan Overview Open of PSC-03 Bucharest Ioannis Liabotis Greece GRNET iliaboti grnetSPAMFREE.gr.

Slides:



Advertisements
Similar presentations
SEE-GRID-SCI Hands-On Session: Workload Management System (WMS) Installation and Configuration Dusan Vudragovic Institute of Physics.
Advertisements

All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Nov. 18, EGEE and gLite are registered trademarks EGEE-III, Regional, and National.
SEE-GRID-SCI Miklos Kozlovszky SZTAKI NA3 – Dissemination and Training PSC06 Meeting, Istanbul, December 7-8,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Romanian SA1 report Alexandru Stanciu ICI.
DORII review Deployment and management of production infrastructure SA2 Ioannis Liabotis Greek Research and Technology Network - GRNET.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director.
INFSO-RI Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
SEE-GRID-SCI Dr. Ognjen Prnjat, GRNET SEE-GRID eInfrastructure for regional eScience EGEE09 conference The SEE-GRID-SCI initiative.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
SEE-GRID-SCI Regional Grid Infrastructure: Resource for e-Science Regional eInfrastructure development and results IT’10, Zabljak,
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
SEE-GRID-SCI SEE-GRID-SCI Operations Procedures and Tools Antun Balaz Institute of Physics Belgrade, Serbia The SEE-GRID-SCI.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator Anna Loukakou, Project Financial Administration GRNET NA1: Project Administrative and.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Enabling Grids for E-sciencE 1 EGEE III Project Prof.dr. Doina Banciu ICI Bucharest GRID activities in RoGrid Consortium.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
SEE-GRID-SCI Miklos Kozlovszky NA3 Leader SZTAKI NA3 – Dissemination and Training Overview and achievements.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
SEE-GRID-SCI Seismo VO Planning The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
SEE-GRID-SCI SEE-GRID-SCI ES VOs The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
Authentication and Authorisation for Research and Collaboration Christos Kanellopoulos
SEE-GRID-SCI REFS application: NOA The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
SEE-GRID-SCI NA4 Progress PSC05, Dubrovnik, 9-11 September 2009 Cevat Şener Dept. of Computer Engineering, Middle East Technical.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
SEE-GRID-SCI NA4 Progress PSC07 Zabljak, February 2010 The SEE-GRID-SCI initiative is co-funded by the European Commission under.
Grid Operations in EGI / NGIs The EGI mw function Panagiotis Louridas, GRNET Tomasz Szepieniec, CYFRONET Report from the 1st Session Rome, March.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
SEE-GRID-SCI Meteo-VO: Overview The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
SEE-GRID-SCI NA4 Progress PSC06 Istanbul, 7-8 December 2009 The SEE-GRID-SCI initiative is co-funded by the European Commission under.
SEE-GRID-SCI Branko Marovic University of Belgrade JRA1 progress PSC05 Meeting, Dubrovnik, 8-11 September 2009.
Induction: What is EGEE? –April 26-28, EGEE organisation and procedures John Murison, EGEE Training Team EGEE is funded by the European Union.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NGI Policy Workshop Introduction and scope.
Resource Provisioning EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia The SEE-GRID-SCI initiative.
WP2: Consolidation of existing state of the art Dr. Ognjen Prnjat, GRNET.
SAFE SSCs for A&A, Fusion and ES Coordinator: Claudio Vuerli, INAF, Italy.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-II All Activity Meeting, Sofia
WP2: Consolidation of existing state of the art Dr. Ognjen Prnjat, GRNET.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
EGI InSPIRE Report to the EGI Council Steven Newhouse On behalf of the Editorial Board.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Training in EGEE-III and beyond Robin McConnell,
Transition to EGI PSC-06 Istanbul Ioannis Liabotis Greece GRNET
Bob Jones EGEE Technical Director
SA1 Execution Plan Status and Issues
EGEE support for HEP and other applications
NA3: User Community Support Team
PSC06 Meeting, 7-8 December, 2009 Gabriel Neagu NA2 Representative
Connecting the European Grid Infrastructure to Research Communities
Cécile Germain-Renaud Grid Observatory meeting 19 October 2007 Orsay
Presentation transcript:

SEE-GRID-SCI NA1-Technical Execution Plan Overview Open of PSC-03 Bucharest Ioannis Liabotis Greece GRNET iliaboti grnetSPAMFREE.gr The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA2 - What should be reported here Comments to EGI Blueprint given – Ognjen will make some statements here DNA2.2 – “NGI Cookbook” ongoing - end of January AM, GE NGI good steps NGI Metrics  given to EGEE  expanded to include EGI requirements  This is crucial stage now to show good metrics NGI Assessment

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA2 - Future Actions MNA2.1 - NGI cookbook defined and made available in wider public (M09) Linked to DNA2.2 NGI Assessment: crucial for EGI inclusion! DNA2.3a – Intermediate NGI Assessment (M12 – end April) GE NGI kick-off

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA3 - What should be reported here Country-level Training events status VO Specific Training Materials Status of central web-pages (papers, ppts.. Etc) VO Web Pages status and Partners web sites Training Community in GE, AL, MD NA3 Metrics analysis: estimate now!

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA3 - Plans MNA3.4 - Standardized training material available: M09 – end January DNA 3.3a - Regional & national dissemination events report (M12) DNA 3.4a -Regional & national training events report (M12) BOTH END APRIL User forum / Regional Operators training

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA4 - Status Status of Application Deployment in each VO  Meteo  status of model porting for both applications  Seismo  Seismology data inventory to be finalized including data from all countries – Explain issues with data transfers  SDS Iterators status to be clarified  Regional Collaborations for FPS(TR) and NMMC3D(HU) to be developed further  Environmental  Porting status  GENESI-DR Interactions

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA4 - Status MoU Between VOs and Sites – to be finalized soon ASG Creation and Helpdesk groups 1 st EVO VO meetings complete – More to be organised NA4 Metrics to be presented here

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 NA4 – Future Plans Application selection for 1 st Periodic Review Demo: one per VO. Candidates here. Applications Deployment in production to start ASAP Deployment plan to be very concrete. DNA Application deployment and support (M12) – Very important deliverable. To be successful applications have to be deployed in advance.

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 SA1 - Status Status of the infrastructure  Services for Vos  VO Resources SEE Interoperation activities status  HelpDesk  Monitoring/BBmSAM/ops.vo.egee-see.org  HGSM-GOCDBl improvements  Wiki re-organization Application Accounting SLA signatures Sites in AL, MD, ME, GE SA1 metrics to be presented here

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 SA1 – Future Plans DSA1.1b – Infrastructure overview and assessment (M12) VO support is important now that apps will start being deployed

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 JRA1 - Status (DJRA1.1 - Grid application requirements commonalities assessment – Submitted) (DJRA1.2 - Application-specific monitoring and control tools design – Submitted) Application Services and Applications specific tools identified Follow Development and deployment plan

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 JRA1 – Future plans JRA1 Metrics to be presented here DJRA1.3 - Application services design report – M12 Discuss proposed application services and tools and finalize decisions, i.e. Security tool.

SEE-GRID-SCI PSC03 meeting, Bucharest, Jan , /13 Final Remarks Special attention to be given on application deployment plan First versions of applications according to metrics and NA4 deliverables have to be deployed by M12! SA1 to be able to provide adequate support to applications NA3 – Training material and training and dissemination schedule to be clarified. 6 deliverables at the end of April!! All ToC start of March. All metrics to be stable mid-March Review-related actions: choice of applications, choice of AS/OTs.