30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006 1 LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.

Slides:



Advertisements
Similar presentations
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Advertisements

Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
D. Peterson, “Development of a TPC for the ILC”, NSF Site Visit, 18-April of 24 Development of a TPC for the ILC Dan Peterson L. Fields R. S. Galik.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
Carleton University A. Bellerive, K. Boudjemline, R. Carnegie, A. Kochermin, J. Miyamoto, E. Neuheimer, E. Rollin & K. Sachs University of Montreal J.-P.
LC TPC R&D Results Cornell WS July Selected LC TPC R&D Results (DESY RPC) for the Cornell WS July 2003 The LC TPC R&D Groups of the PRC R&D-01/03.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
Test beams for Introduction and plan for discussion EUDET contract to end Dec ‘Mombusho’ to end…. Canada funding secure till April 2012.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
Marseille – January 17 th, TPCs for High Energy Physics David Attié Max Chefdeville,Paul Colas, Arnaud Giganon, Marco Zito,
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
21/12/2006 Ron Settles MPI-Munich TUM Dec ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
27/11/2006 Ron Settles MPI-Munich Tsinghua Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback to the R&D program.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Large prototype goals Endplate design P. Colas. General ideas We have to agree first on the goals to understand how to build the endplate We have to agree.
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.
23/08/2005 Ron Settles MPI-Munich/DESY Snowmass2005 TPC Large Prototype1 TPC R&D, Tasks towards the Design of the ILC TPC LC TPC R&D Groups OUTLINE of.
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
17 October 2003TPC ALEPH TPC Ron Settles, MPI-Munich/DESY1 The Aleph Time Projection Chamber Ron Settles, MPI-Munich/DESY TPC
ILC TPC resolution studies with charge dispersion in MPGDs with a resistive anode Madhu Dixit Carleton University & TRIUMF IPNS KEK 14/05/2005.
25/10/2006Ron Settles MPI-Munich/DESY 12th WP phonemeeting 25 October LCTPC/LPWP-12th phonemeeting –Date 25 October 2006 –Time 7:00 west coast 10:00.
10 Nov Ron Settles MPI-Munich LCTPC advanced-endcap studies for the LOI1 Continuation of LCTPC “advanced- endcap” planning for the ILD LOI ILD Logo.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
1 Status ‘Si readout’ TPC at NIKHEF NIKHEFMaximilien Chefdeville Auke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Micromegas (Ingrid)+TimePix 8-chip modules
07/03/2008 Ron Settles MPI-Munich TPC B-field1 On the Magnetic-field Requirements for the LC TPC OUTLINE of TALK Status of Discussion.
11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.
11/09/2008 Ron Settles MPI-Munich/DESY LCTPC planning for the LOI1 LCTPC issues for the ILD LOI ILD Logo goes here.
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
LCTPC “Advanced Endplate” (Discussion) LC TPC Meeting at ALCGP07 T. Matsuda.
19 Jan Ron Settles MPI-Munich LCTPC advanced-endcap for the ILD- LOI1 ILD Logo goes here Iteration on LCTPC “advanced-endcap” for the ILD LOI…
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
Ron Settles MPI-Munich LCTPC integration model
Large Area Endplate Prototype for the LC TPC
Micromegas module for ILC-TPC
Toward the final design of a TPC for the ILD detector
OUTLINE of TALK Overview of the question Framework, TPC R&D status
Carleton/Montreal/Victoria
WP-conveners 3rd phone meeting
OUTLINE of TALK Overview Motivation, LC-TPC R&D Status
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
TPC Paul Colas Technical meeting, Lyon.
LCTPC remarks for closed session
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
EUDET Extended SC meeting 31 August 2009
WP-conveners 1st phone meeting
Presentation transcript:

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00 east coast 16:00 central Europe 23:00 Japan – To join, Phone code 52872#

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Agenda for 8th WP phonemeeting (in future the meetings will be managed via AGENDA -1.News Formation of the LCTPC/LP Collaboration WWS-R&D-panel tracking review at Beijing PIRE (Dan) -2.WP meeting Gem gating (RS) Gem endplate for the LP (Akira) Fieldcage (Ties) LP endplate/electronics discussion (Leif, Dan) -3.Future meetings -Paris endcap meeting September -Eudetmeeting at MPI October -Valencia European WS 6-10 November -Beijing Asian WS February 3-7 February -4.AOB

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -1a.Formation of the LCTPC/LP collaboration  On the next foil are the groups who have replied with the name of their CB representative up to now: marked by  The non-checked groups have now been contacted directly. Status and lists of names are on the following foils…

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LP Groups (27 August 06) Americas  Carleton   Montreal   Victoria   Cornell   Indiana   LBNL  MIT  Purdue  YaleEurope LAL Orsay  IPN Orsay  CEA Saclay Aachen  Bonn  DESY  UHamburg  Freiburg  Karlsruhe MPI-Munich  Rostock  Siegen  NIKHEF  UMM Krakow Bucharest Novosibirsk  PNPI StPetersburg  Lund  CERN  Asia Tsinghua  CDC: Hiroshima  KEK  Kinki U  Saga  Kogakuin  Tokyo UA&T  U Tokyo  U Tsukuba  Minadano SU-IIT  …Other groups interested?

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Formation of the LCTPC/LP collaboration The proposal is to have: 1)Three coordinators, one chosen by each region. These spokespersons (SP) coordinate the work of the following two boards: 2)The collaboration board (CB), consisting of one representative from each group or set of groups (the group leader, principle investigator or other chosen member). Each CB member looks after the resources for its group(s) (money and people). 3)The technical board (TB), consisting of the existing workpackage (WP) conveners. The TB will ensure the technical integrity of their WP and compatibility with other WPs while maintaining close contact with the collaboration. This structure now exists. 1) We are three interim coordinators and are to be replaced by chosen ones in the course of this formation phase. 2) The CB is (almost) complete. 3) The workpackages and WP conveners were identified during the first half of this year. The names of CB and TB members are listed in the next slide.

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August The CB members are: ================== --Americas- Carleton: Madhu Dixit Montreal: Jean-Pierre Martin Victoria: Dean Karlen Cornell: Dan Peterson Indiana: Rick Van Kooten LBNL: Mike Ronan --Asia- Tsinghua: Yuanning Gao For the following CDC groups: Akira Sugiyama Hiroshima KEK Kinki Saga Kogakuin Tokyo U A&T U Tokyo Tsukuba Mindanao

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Europe- Eudet contact: Joachim Mnich LAL Orsay/IPN Orsay: Vincent Lepeltier Aachen: Stefan Roth Bonn: Klaus Desch Desy/UHamburg: Ties Behnke Eudet: Joachim Mnich Freiburg: Andreas Bamberger MPI-Munich: Ariane Frey Rostock: Henning Schroeder Siegen: Ivor Fleck Nikhef: Jan Timmermans Novosibirsk: Alexei Buzulutskov St.Peterburg: Anatoliy Krivchitch Lund: Leif Jonsson CERN: Michael Hauschild (deputy: Lucie Linsen) --Groups with Observer status- TU Munich: Bernhard Ketzer Purdue: Ian Shipsey --Replies still missing from: MIT Yale Mindanao CEA Saclay Karlsruhe Krakow Bucharest

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August The TB members are: ================== 1) Workpackage Mechanics Ron Settles a) LP design (incl. endplate structure) Dan Peterson b) Fieldcage, laser Ties Behnke c) GEM panels for endplate Akira Sugiyama d) Micromegas panels for endplate Paul Colas e) Pixel panels for endplate Jan Timmermans f) Resistive foil for endplate Madhu Dixit 2) Workpackage Electronics Leif Jonsson a)"Standard" RO/DAQ sytem for LP Leif Jonsson+Postdoc b) CMOS RO electronics Harry van der Graaf c) Electronics for LCTPC Luciano Musa 3) Workpackage Software Peter Wienemann a) LP SW, simul./reconstr.framework Peter Wienemann b) TPC simulation, backgrounds Stefan Roth c) Full detector simulation Keisuke Fujii 4) Workpackage Calibration Dean Karlen a) Field map Lucie Linssen b) Alignment Takeshi Matsuda c) Distortion correction Dean Karlen d) Radiation hardness of materials Anatoliy Krivchitch e) LP Gas/HV Eudet Postdoc

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August We shall be sending an this week on the next steps for the formation of the LCTPC/LP collaboration… AGENDA -1a.Formation of the LCTPC/LP collaboration

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -1b.Tracking review at Beijing: As announced at the VLSW06, the WWS-R&D Panel is starting regular reviews of the different R&D projects for the LC detector. Chris Damerell has sent the that they want to start with tracking (Si and TPC) at the Asian LC meeting in Beijing (3-7 February 2007). The modus operandi is still being discussed…

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -1c.PIRE As announced by Dan, this is the “Partnerships for International Research and Education” program at Cornell. More details from Dan…

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -2a.Next iteration on the goals for LCTPC/LP. For your info: we (Fabio Sauli, Madhu Dixit, Martin Killenberg, Akira Sugiyama, RS, a.o.) have started on thinking about ways to test Gem gating with (a) small prototype(s). Martin thinks we might have a scheme that works, but it has to be tried out. If you are interested or have suggestions, let us know…

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -2b. Gem endplate (a.o.) for the LP Akira (WP convener for the LP Gem endplate) sent a mail asking which groups want to participate in the work of making/testing the Gem endplate(s) for the LP. The division of work among groups will be a part of the general organization of the LCTPC/LP collaboration which has to be done within the next few weeks. For the Gem-endplate question, more from Akira…

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -2c. Fieldcage for the LP

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -2c.LP endplate discussion Reminder: most urgent point for LP is to design layout of endplate and finalize ~12/2006 One picture from the note Leif described at the last meeting, see and two pictures of Dan’s iteration of the last meeting follow in the next three foils…

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -3.Future meetings There are (in addition to bi-weekly phonemeetings): -Paris Endcap meeting organized by Paul/Akira (12-15 September 2006): announcements already sent to the LCTPC groups, see -Eudet annual meeting MPI-Munich (18-20 October 2006) with website: -European LC workshop Valencia (6-10 November 2006), see -Asian LC workshop Beijing (4-7 February 2007) Website:

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August AGENDA -4.AOB

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Back up slides, for reference Back up slides, for reference

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Akira Sugiyama – GLD DOD

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August RS study - LDC DOD - together with Joel Pouthas Philippe Rosier (IPN Orsay)

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Aleph Endplate

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August Some features Zigzag structure prevented loss of tracks > θ~22° Sectors mounted from inside using a “handling tool” to minimize the dead space between sectors. This straight-forward operation which was performed at least 30 times during the lifetime of Aleph. Alu sandwich structure stiff, lightweight to - contain 7mb overpressure - provide forced-air thermal insulation between electronics and TPC volume Water cooling of 1kW electronics/side in addition - 22K channels per side Combination water/air cooling blocked all heat to TPC Overall thickness ~ 25%Xo (average) w/o cables Bending of endplate -20 micrometers due to 7mb overpressure - 5 micrometers due to wire tension

30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August R&D Planning 1) Demonstration phase –Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. 2) Consolidation phase –Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years. 3) Design phase –After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started.