U.S. Department of the Interior U.S. Geological Survey Continuous Records Processing.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
Checking & Corrective Action
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
Department of Environmental Quality Environmental Management System Overview.
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
Evaluation of Current Practices.  Ad hoc group tasked with identifying desirable methods for efficient and cost effective print production. 2.
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
Application. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and Risk Management.
Managing the Information Technology Resource Jerry N. Luftman
Fundamentals of Information Systems, Second Edition
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
SAISD Federal Programs Department. Stage 1 of the Organization and Development Process Form the Planning Team 1 2.
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
Configuration Management
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
U.S. Department of the Interior U.S. Geological Survey Inter-Agency Datum Establishment and Conversion Collaboration in Missouri. Paul H. Rydlund Jr. PLS.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
2 WSC Training Outline 1.Introduction 2.Training Objectives 3.Fundamentals 4.iBudget Goals 5.Implementation Constraints 6.Application Roles 7.Program.
“... providing timely, accurate, and useful statistics in service to U.S. agriculture.” Achieving Innovation and Efficiencies through Organizational Change.
State of Maine: Quality Management and National Core Indicators.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
FY 2007 Conservation Reserve Program (CRP). Conservation Reserve Program Topics Agency Roles and Responsibilities Agency Roles and Responsibilities CRP.
“... providing timely, accurate, and useful statistics in service to U.S. agriculture.” NASS Methodological, Operational, and Structural Transformation.
Section 15.1 Identify Webmastering tasks Identify Web server maintenance techniques Describe the importance of backups Section 15.2 Identify guidelines.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
North Carolina CTS Committee Meeting #4 January 16, 2001.
USGS Overview Workshop on Improved Quality of Data and Data Exchange for Climate Research and Analysis NOAA National Climatic Data Center Bill Hazell,
SW-PBIS Cohort 8 Spring Training March Congratulations – your work has made a difference Cohort 8.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Financial Management of Sponsored Awards: Confessions From A Department Administrator.
August Priority 7 Review Team 7: Planning Subcommittee R. Hall-Allen, M. DesVignes, J. Moore, R. Romali, R. Tillberg Increase the resources available.
U.S. Department of the Interior U.S. Geological Survey U.S. Geological Survey Scientific Records Appraisal Tool Presented at the Ensuring the Long-Term.
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
Efficiently Completing and Updating Campus Greenhouse Gas Inventory University of Wisconsin-Stout Applied Research Center (ARC) Wisconsin’s Polytechnic.
© 2007 SRI International CPATH Principal Investigators Meeting: Program Evaluation Update March 26, 2010 By the Center for Education Policy Dr. Raymond.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Managing Records: Good government, Better business. FOI Presentations to Boards & Committees Cayman Islands National Archive November 2008.
OEPA West Virginia Board of Education Policy 2320: A Process for Improving Education: Performance- Based Accreditation System RESA 6 – October, 2014 Office.
New England Region Homeless Management Information System PATH Integration Into HMIS Richard Rankin, Data Remedies, LLC Melinda Bussino, Brattleboro Area.
Progress in FDA’s Drug Product Quality Initiative Janet Woodcock, M.D. November 13, 2003.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
Development of the Egyptian Code of Practice for Student Assessment Lamis Ragab, MD, MHPE Hala Salah, MD.
State of Georgia Release Management Training
Washington State Work Zone Rule  Work Zone Rule Implementation  New Work Zone Policy Cathy Nicholas, FHWA - WA Division Office Frank Newboles, WSDOT.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
WHAT WE ARE LEARNING THROUGH IMPLEMENTATION TODD A. SPANGLER, PE BRENTWOOD WATER SERVICES.
ERA Project Team Meeting Project Management Plan April 23, 2002.
EDealer Concept Linda Sitz, Director Motor Vehicle October 2012 North Dakota Motor Vehicle Division.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Fort Stanwix National Monument Energy Audit Contract
Testing the System.
Industrial Assessment Center Database
RECORDS AND INFORMATION
Roles and Responsibilities COC & District
Presentation transcript:

U.S. Department of the Interior U.S. Geological Survey Continuous Records Processing

Background Information  In 2002, the Central Region Advisory Committee on Hydrologic Data Operations (CRACD) began investigating methods to accomplish the goal of computing records continuously  In 2005, the Central Region Continuous Records Processing Team (CRPT) met to establish and document guiding principles and best practices for all Central Region WSCs to implement for processing streamflow records on a continuous basis

External Driver – OMB/PART  External measure for “appropriate time period” is the 120-day OMB/PART requirement (compliance is 20% in 2006; 30% in 2007)  PART was NOT a consideration in the Central Region continuous records pilot program.  CR committed to meeting PART requirements using the technically based processes developed by the pilot WSCs.

Central Region Policy  In 2006 all WSCs in Central Region are required to:  Finalize (locked in ADAPS) all 2006 continuous-discharge records by February 1,  Annual Data Report deadline March 1,  Work and finalize percentage of records continuously to meet PART requirements.  Implement RMS for records tracking.

Processing Records  Processing records includes 4-steps:  Computing  Checking  Reviewing  Approving

Approach to Processing Records Continuously  Change in definition of a field trip  Establish work teams in the field offices  Emphasize better scheduling of all planned work  Acknowledge the benefit of DCPs at all sites  Develop and use proposed tools

Pilot Effort  Six pilot offices were chosen to pilot the study based on Office size, Experience, Current records status, Geography, Hydrology, and Climate.  These offices were:  Arkansas WSC  Iowa WSC  Kansas WSC  Durango Field Office, Colorado WSC  North Dakota WSC (computation during ice period)  Missouri WSC

Lessons Learned  Transition time before records process became continuous  Time was needed to:  Catch records up to current  Change mindset  Reestablish priorities

Lessons Learned  Records that had been processed continuously for 319 stations were published in the 2004 Annual Data Reports  During the end-of-year reviews problems requiring that the record be reworked were found with 3 of 319 stations  None of the problems were the result of the record being processed continuously

Guiding Principles for Processing Records Continuously  Based on the experiences of the pilot offices, two guiding principles have been recognized for processing records continuously  The record process is data driven  Processing records continuously must be a high priority

Driving Factor  Paradigm shift concerning what drives the records process  Traditionally the records process was driven by the Annual Report deadline  The process of computing records continuously is driven by the data

Data Driven  As data are collected, the records are processed to the fullest extent that the data will allow  The data dictate the proper time to work, check, review, and approve the record

Priority  Processing records continuously has to be a high priority for the Water Science Center  Director  Data Chief – Other Section Chiefs  Field Unit Chief  Field staff

Priorities  Traditional  Gage operation  Flood measurements  Routine field trips  Gage construction  Project work  Field maintenance  Levels  Equipment maintenance  Field vehicles  Processing records  Continuous Process  Gage operation  Flood measurements  Processing records  Routine field trips  Gage construction  Project work  Field maintenance  Levels  Equipment maintenance  Field vehicles

Best Practices for Processing Records Continuously  Evaluate and take advantage of any efficiency that will save time without sacrificing the quality of data collection and record processing  Maintain a detailed work schedule  Use a records management system to track the status of records

Field and Office Efficiencies  Maintain high-quality gages  Less time spent diagnosing and repairing problems  Higher-quality gage height record  Monitor battery voltages, transmit times, transmit signal strengths, and other variables for problems  Be proactive rather than reactive with gage maintenance

Field and Office Efficiencies  Field trip organization  Team approach – field trips are organized into sections that are run concurrently  Multiple people in the area at the same time makes it more efficient to conduct tasks that require more than one person (levels, boat operation, construction/maintenance, etc.)

Field and Office Efficiencies  Technological advances in field equipment  Hydroacoustics  GPSs  Digital levels  Others

Field and Office Efficiencies  Take advantage of new software tools and scripts

Work Schedule  A comprehensive work schedule should be developed and maintained for each 12 months  The schedule should include  Routine field trips  Record processing  Field maintenance trips  Project work  Training  Meetings  Leave  Other tasks that require significant amounts of time

Work Schedule  WSC management needs to be supportive of the schedule  Record processing needs to remain a high priority  Record processing needs to be completed before moving on to next scheduled tasks

Records Management  It is important to track the day-to-day status of record processing  Methods that have been used to track the status of records include:  Hand updated charts  Electronic spreadsheets  Web based systems

Records Management  Records Management System (RMS) is a tool currently being used by all CR WSCs Status on 11/8/06

Partial-year approval of data

Summary  There are no fundamental changes in the record computation procedures – the same USGS standards are used when processing records continuously compared to the traditional method

Summary  The key to being successful at processing records continuously is PRIORITY