TEAM 200 TEAM 200 ALLIANCE - T2A ROLL OUT MEETING 25th MARCH 2002 Main Hall University of East London.

Slides:



Advertisements
Similar presentations
WORKSHOP 3: Building a European funding & financial framework for the TEN-T The role of PPPs & the private sector Enrique Fuentes, Development.
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
Health & Social Care Digital Service – Market Engagement 1 Introduced by Ben Gregory – HSCIC Head of Procurement Tuesday August 13 th 2013.
Global Poverty Action Fund Community Partnership Window Funding Seminar January 2014 Global Poverty Action Fund Community Partnership Window Funding Seminar.
Moving to a Unified Grants Process and a Single Monitoring Framework Jim Gray Acting Head of Community Planning, Corporate Services Dept, Glasgow City.
Improvement Service / Scottish Centre for Regeneration Project: Embedding an Outcomes Approach in Community Regeneration & Tackling Poverty Effectively.
Program Management Overview (An Introduction)
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
Reporting and Delivery Project Review and Repeat Project Spec & Terms Targets & Goals ffffff Hands On Execution RESULTS Time & £ Modelling Product & Positioning.
Design of Drilling Contracts – Economic Incentives and Contractor’s Focus on HSE Presented by Anders Toft SPE International Conference on Health, Safety.
Construction Category Management Planning Version 1.1 (May 2015)
NHS Greater Glasgow & Clyde Local Data Sharing Partnership Case Study “ Data Sharing Enabled by Clinical Portal Technologies” George Lynch Information.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
1 A Member of the Team Focus Group Integrated Management Systems Industry View 2 Michael Thompson BSc (Eng), FFICE, MCIWEM Roe Thompson Limited.
Success Principles in Integrated Delivery System.
ABC of Clean Administration Back to basics through Performance Management service Institute of Municipal Finance Officers & Related Professions IMFO Audit.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Investment Reform Lenders’ Interests November 2009.
1 Copyright © 2007 Accenture All Rights Reserved. About CIS Co-op Insurance Services (CIS)—a subdivision of the Co-Op Group—provides a full range of life,
REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,
Compensation events and claims Presented by Prof. Khem Dallakoti.
1 REPORT OF:Joanne Newton DATE OF PAPER:26 June 2013 SUBJECT:Financial Position at 31 st May 2013 IN CASE OF QUERY, PLEASE CONTACTJoanne Newton Joanne.
How RISKY Is This??. How RISKY is This?? Buy a lottery ticket Only 3 will be sold Cost for a ticket $80 million Jackpot $2,000,000,000 Where is the
1st PMI AGC Energy Forum: DMS & PMI Debates Abu Dhabi, UAE 2nd June Wael H. Al-Jasem (MBA, PMP, MSP Register Practitioner) EPCs on Bonus Incentive.
Annual Accounts: April 2014 – March 2015 David Maloney Chief Finance Officer Haringey CCG.
Councillor Community Fund Isabell Procter Director of Resources Francis Fernandes Borough Secretary.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
Council of Governors Meeting Financial Climate and its implications Suzanne Tracey Director of Finance and Business Development January 2010, Item 8.
1 Railway Safety Regulator Strategic Plan: 2007/8 to 2009/10 Presentation to the Portfolio Committee on Transport 28 March 2007.
EU COMMON STRATEGIC FRAMEWORK FUNDS IN ENGLAND INITIAL PROPOSALS FROM HMG 21 NOVEMBER 2012.
S S P EXECUTIVE Monday 14 March 2011 Item 4a) Salford City Council Revenue Budget 2011/12 Martin Vickers Strategic Director Salford City Council.
Commissioning social care Angela Canning & Cathy MacGregor, 15 March 2012.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
INVESTOR MANAGEMENT DAY ‒ DUBAI 1. 2 Background Strategy OperationsSome current and recently secured contracts.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Integration of Health and Social Care Keith Darragh – Assistant Director Safeguarding, Quality and Business Strategy.
What new care models may mean for accountability and commissioning Rachael Addicott, Senior Research
Briefing: 4 th Quarter Financial Report 2011/12 Vote 25: Police.
Budget Presentation 2010/2011 – 2013/2014 All Communities 28 January 2010.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
1 Consultation: Framework Contract for Home Support and Care Homes with/out nursing 1 June 2011.
THE ALMO SECTOR IN ENGLAND Dublin City Council 3 June 2015.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOTS 1-6.
Senior Management Team Away Day Session 1: HMS Business Update Presentation by Paul Worthington Managing Director Friday 19th and Saturday 20th October.
Ray Harding – Chair, Norfolk IHAT Strategy Group Martin Sands – Norfolk IHAT Coordinator INNOVATION TO IMPROVE WELLBEING INTEGRATING.
Copyright © The Conestoga Group PY 674 – Session 2 Review of week 1 material... Chapter 1: PM Overview – Main Text Book / H. Kerzner Ph. D. Focus.
Andrew Webster 11 March 2016 Funding settleme nt Social Care Issues.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Copyright 2013 Field Training Services Pre Job Planning Tim Faller Field Training Services
Upturn Consulting 27, March 2017.
Profession Practices (ECIV-5105)
Programme Management Board
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Application Form.
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
The Canterbury Clinical Network
Cost Containment Working Group Board Update
Programme Management Board
Department Of Energy Review Linac Coherent Light Source Project
VETS 2 Advantages for Federal Agencies
Delivering Successful Outcomes
Presentation transcript:

TEAM 200 TEAM 200 ALLIANCE - T2A ROLL OUT MEETING 25th MARCH 2002 Main Hall University of East London

TEAM 200 TEAM 200 ALLIANCE - T2A Agenda for the Afternoon Why do we need to changeGarry Field What are our future objectivesTerry McDonald What are we changing in the ContractTerry McDonald How will working practices changeBob Ibell What challenges do we faceIeuan Morgan Where are we now re Schedule & BudgetIeuan Morgan QuestionsAll TEAM 200

TEAM 200 ALLIANCE - T2A ‘Informal’ Area 200 Alliance operating since Contract Award Shared Office Complex at Channelsea House Shared Precast Factory for C220 and C240 Single order SGI Segments across all tunneling contracts Single Security System for Stratford Based Contracts Single spoil treatment facility for Stratford Based Contracts So why do we need to change? TEAM 200

TEAM 200 ALLIANCE - T2A Since Contract Award we have encountered a number of problems Late release of design has seriously delayed Stratford Box This has seriously delayed the launch dates for C220 & C240 Signalling problems have seriously delayed West Rail Bridge Railtrack / CRG issues delayed commencement of Graham Rd The informal Alliance is not able to manage these issues TEAM 200

TEAM 200 ALLIANCE - T2A We identified the need for RLE and all Contractors to work collaboratively as a single team work flexibly across Contract boundaries develop solutions that are best for the project not the contract set aside ‘Contract’ issues and focus on the work develop an incentive scheme that would promote the above TEAM 200

OBJECTIVES Originally Each Contractor:BUILD MY BOX AND PROTECT MYSELF Why:The Contract, Pain / Gain What should it be: Series Build our part of the Railway in TIME, in B UDGET, to the RIGHT quality TEAM 200 ALLIANCE - T2A

TEAM 200 THE PROBLEMS Intense narrow focus on pain avoidance –Individual Targets –Pain / Gain Share –Compensation Events TEAM 200 ALLIANCE - T2A

TEAM 200 IMPACT: Exploit problems / Changes Excuses for non performance Cause of friction No incentive to co-operate with others Budgets are blown - BUT NOBODY WINS Programmes no longer useful tools Project is late TEAM 200 ALLIANCE - T2A

TEAM 200 SOLUTION: Remove Pain share from contract No Compensation Events! RESULT: Allows focus on delivering project TEAM 200 ALLIANCE - T2A

TEAM 200 HOW WILL THIS WORK? THERE IS ONLY ONE BUDGET –Contractors Tender Prices –Client Contingency for: Design Development Settlement Issues Undefined Scope –RLE Field Engineering TEAM 200 ALLIANCE - T2A

TEAM 200 HOW WILL THIS WORK? Therefore the Budgets have been COMBINED (THE “POT”) Total budget 220, 230, 240, 250, Field Engineering IT CANNOT BE INCREASED (there is no other money!) Any surplus is shared between the 5 of us If the POT is exceeded, then as now for individual targets, no FEE and ALL CONTRACTS SUFFER EQUALLY TEAM 200 ALLIANCE - T2A

TEAM 200 HOW WILL THIS WORK? RESULT WE ALL HAVE TO CARE ABOUT AND MANAGE: –The Interfaces –The Budget –The Problems BUDGET  TEAM 200 ALLIANCE - T2A

TEAM 200 HOW DOES THIS DELIVER THE PROJECT? PROGRAMME Any surplus from the POT is only paid if Team 200 MILESTONE DATES are delivered 8 MILESTONE defined to remove Project Risk and, importantly, provide access for SYSTEMWIDE A REAL INTEGRATED PROGRAMME PROGRAMME  TEAM 200 ALLIANCE - T2A

TEAM 200 SYSTEM WIDE The reason we are building the BIG BOX Systemwide Scope Transfer to Civils where possible –Increase the POT –Remove TAIL END PROGRAMME RISK from the Project RESULT: PROJECT BUDGET   PROJECT PROGRAMME   TEAM 200 ALLIANCE - T2A

TEAM 200 OBJECTIVES BEFORE: BUILD MY BOX & PROJECT MYSELF NOW: BUILD OUR PART OF THE RAILWAY NO EXCUSES…….. TEAM 200 ALLIANCE - T2A

TEAM 200 HOW IS THIS DEALT WITH? SUPPLEMENTAL AGREEMENT –Addendum to Main Contract  Disapplies Compensation Events (incl. Retrospectively)  Defines the POT & has mechanisms for measuring any surplus  Defines MILESTONES & how payment of any surplus relates to achievement of milestones. TEAM 200 ALLIANCE - T2A

TEAM 200 T2A has: One budget One programme One team TEAM 200 ALLIANCE - T2A

TEAM 200 One Budget. Manage Costs Reduce Waste Improve Efficiency TEAM 200 ALLIANCE - T2A

TEAM 200 Manage Costs Manage Costs not Margin Control Expenditure TEAM 200 ALLIANCE - T2A

TEAM 200 Improve Efficiency Communications Decision Making Resist Changes TEAM 200 ALLIANCE - T2A

TEAM 200 We have to Perform (nowhere to hide) TEAM 200 ALLIANCE - T2A

TEAM 200 Responsible for delivery of: –Health & Safety –Quality –Environment Management TEAM 200 ALLIANCE - T2A

TEAM 200 Organisational Changes TEAM 200 ALLIANCE - T2A

TEAM 200 Alliance Management Board G. Field K. McManus J. Horner I. Morgan T. McDonald D. Court R. Ibell

TEAM 200 TEAM 200 ALLIANCE - T2A Organisational Concept T2A Design Dept Property Owners Utilities Railtrack (CRG) LUL

TEAM 200 I Galloway ALLIANCE STEERING GROUP ALLIANCE MANAGEMENT BOARD G. Field T. McDonald URN RLE Interfaces Cost Monitoring Programme Monitoring Budget Monitoring Environmental Management Project Control Interface Field Engineering D. CourtR. IbellI. MorganJ. HornerK. McManus

TEAM 200 Utilities / RTI / Settlement Manager T. McDonald C220 Production Management Contract Administrator C250 / Structures Earthworks Manager ALLIANCE BOARD J Horner D. Court C250 R. Ibell C240 Production Management Project Control Contract Administrator G. Field K McManus Health & Safety Quality Environment LUL / Tunnels / Shafts Manager Production Teams I. Morgan C230 Production Management Production Teams Contract Administrator Production Management Production Teams Contract Administrator T2A Functions Management

TEAM 200 TEAM 200 ALLIANCE - T2A Ieuan Morgan Current Contract in Terms of TIME and COST The supplemental agreement with regard to COST The supplemental agreement with regard to TIME

TEAM 200 The Previous Situation Contractors performance measured against Target Sum Target Sum is adjusted by Compensation Events Each Contract has Sectional Completion Dates These dates are adjusted by Compensation Events TEAM 200 ALLIANCE - T2A

TEAM 200 Drawbacks of the Previous Arrangement Concentration on Compensation Events Each Contractor focused on the particular contract dates No incentive to ‘Co-operate’ TEAM 200 ALLIANCE - T2A

TEAM 200

AREA 200 ALLIANCE

TEAM 200 Possible Future Savings TEAM 200 ALLIANCE - T2A

TEAM 200 AREA 200 ALLIANCE - Team T2A