Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System.

Slides:



Advertisements
Similar presentations
John Coughlan et al.Rutherford Appleton Laboratory14th May 20023rd CMS Electronics Week Tracker Front-End Driver Progress Report 3rd CMS Electronics Week.
Advertisements

Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory12 March 2002 CMS Tracker FED - Front End FPGA.
Instrumentation Department Rutherford Appleton Laboratory27 March 2002 CMS Tracker FED Front End Module Analogue Circuit Considerations Draft 1.0 Rob Halsall.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
1 ROD US ATLAS FDR, ROD Overview Atlas Wisconsin Group Khang Dao, Damon Fasching, Douglas Ferguson, Owen Hayes, Richard Jared, John Joseph, Krista Marks,
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Proposal for the read out system for the future Si. Vertex Detector with signal processing and hit data production for a fast track trigger ? M. Pernicka.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory14 September 2000LEB2000 Krakow The Front-End Driver Card for CMS Silicon Microstrip.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
University of Calcutta CBM 1 ROC Design Issues Dr. Amlan Chakrabarti, Dr. Sanatan Chattopadhyay & Mr. Suman Sau.
Electronics/DAQ for SVD2+SVD3 KEK, 17 Nov 2004 Manfred Pernicka, HEPHY Vienna We want to investigate penguins!
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
Instrumentation DepartmentJohn Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 Delay FPGA I/O Clock40.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory21 October 2002 CMS Tracker FED Back End FPGA Frame_Sync_out0.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory16 January 2002 CMS Tracker FED Back End FPGA Frame_Sync_out0.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
J. Coughlan et al. 1st October 2003 LECC 2003 Amsterdam The CMS Tracker Front-End Driver 9 th Workshop on Electronics for LHC Experiments Amsterdam J.A.Coughlan,
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory17 October 2001 Delay FPGA I/O Clock40 Reset ADC_Data_stream_0.
Tracker Week 11th February CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Tracker Week 21st April CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK.
CMX Collection file for current diagrams 30-Apr-2014.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory11 September 2002LEB 2002 Colmar The Front-End Driver Card for the CMS Silicon.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
PowerBench Programmable Power Supply Dror Lazar Moran Fishman Supervisor: Boaz Mizrahi Winter Semester 2009/10 HS DSL.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (1) Firmware: - 3 different ALTERA FPGA’s Cyclone Stratix Stratix.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob HalsallRutherford Appleton Laboratory19 July 2002 Electronic System Design Group CMS Tracker.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 CMS Tracker FED Firmware.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory18 July 2001 CMS Tracker FED CMS Tracker Two Weekly.
GPL Board Pattern Generator for the Level-0 Decision Unit Hervé Chanal, Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Jacques Lecoq,
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
Development of the CMS Silicon Strip Tracker Readout
Production Firmware - status Components TOTFED - status
Possible contribution of Pisa on pixel electronics R&D
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
PRODUCTION BOARDS TESTING
Status of the Detector Dependent Unit 2 channel prototype
UK ECAL Hardware Status
PRODUCTION BOARDS TESTING
The CMS Tracking Readout and Front End Driver Testing
FED Design and EMU-to-DAQ Test
Presentation transcript:

Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System ACE Clocks EPROM EPROM TTCrx QDR Write QDRs QDR Read Serial Comms Headers TTC chanA VME LinkRegs S-LINK S-LINK Clocks Data Serial Comms Scope Mode Header Mode FIFOs Input Regs Serial Comms Scope Mode Header Mode Output Input Regs Opto Rx DAC Opto Rx DAC DELAY FPGA x 3 x 8 FE FPGA x 8 BE FPGA VME FPGA ADC Under Simulation Under Test on FED FEDv2 Controls Data Readout Control Throttle TCS Input ClusterMode Ed Saeed Ivan Ed Ed, John Saeed, Ivan Chan B I2C Temp “Working” on FED External Devices Temp 15th May 2003 To be Implemented

Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System ACE Clocks EPROM EPROM TTCrx QDR Write QDRs QDR Read Serial Comms Headers TTC chanA VME LinkRegs S-LINK S-LINK Clocks Data Serial Comms Scope Mode Header Mode FIFOs Input Regs Serial Comms Scope Mode Header Mode Output Input Regs Opto Rx DAC Opto Rx DAC DELAY FPGA x 3 x 8 FE FPGA x 8 BE FPGA VME FPGA ADC Under Simulation Under Test on FED FEDv2 Controls Data Readout Control Throttle TCS Input ClusterMode Ed Saeed Ivan Ed Ed, John Saeed, Ivan Chan B I2C Temp “Working” on FED External Devices Temp 11th June 2003 To be Implemented

Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System ACE Clocks EPROM EPROM TTCrx QDR Write QDRs QDR Read Serial Comms Headers TTC chanA VME LinkRegs S-LINK S-LINK Clocks Data Serial Comms Scope Mode Header Mode FIFOs Input Regs Serial Comms Scope Mode Header Mode Output Input Regs Opto Rx DAC Opto Rx DAC DELAY FPGA x 3 x 8 FE FPGA x 8 BE FPGA VME FPGA ADC Under Simulation Under Test on FED FEDv2 Controls Data Readout Control Throttle TCS Input ClusterMode Ed Saeed Ivan Ed Ed, John Saeed, Ivan Chan B I2C Temp “Working” on FED External Devices Temp 26th June 2003 To be Implemented

Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System ACE Clocks EPROM EPROM TTCrx QDR Write QDRs QDR Read Serial Comms Headers TTC chanA VME LinkRegs S-LINK S-LINK Clocks Data Serial Comms Scope Mode Header Mode FIFOs Input Regs Serial Comms Scope Mode Header Mode Output Input Regs Opto Rx DAC Opto Rx DAC DELAY FPGA x 3 x 8 FE FPGA x 8 BE FPGA VME FPGA ADC Under Simulation Under Test on FED FEDv2 Controls Data Readout Control Throttle TCS Input ClusterMode Ed Saeed Ivan Ed Ed, John Saeed, Ivan Chan B I2C Temp “Working” on FED External Devices Temp 23rd July 2003 To be Implemented

Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System ACE Clocks EPROM EPROM TTCrx QDR Write QDRs QDR Read Serial Comms Headers TTC chanA VME LinkRegs S-LINK S-LINK Clocks Data Serial Comms Scope Mode Header Mode FIFOs Input Regs Serial Comms Scope Mode Header Mode Output Input Regs Opto Rx DAC Opto Rx DAC DELAY FPGA x 3 x 8 FE FPGA x 8 BE FPGA VME FPGA ADC Under Simulation Under Test on FED FEDv2 Controls Data Readout Control Throttle TCS Input ClusterMode Ed Saeed Ivan Ed Ed, John Saeed, Ivan Chan B I2C Temp “Working” on FED External Devices Temp 22nd August 2003 To be Implemented

Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME System ACE System ACE EPROM TTCrx QDR Write QDRs QDR Read Serial Comms Headers TTC chanA VME LinkRegs S-LINK Clocks Data Serial Comms Scope Mode Header Mode FIFOs Input Regs Serial Comms Scope Mode Header Mode Output Input Regs Opto Rx DAC Opto Rx DAC DELAY FPGA x 3 x 8 FE FPGA x 8 BE FPGA VME FPGA ADC Under Simulation Under Test on FED Controls Data Readout Control Throttle TCS Input Cluster Mode Ed->Saeed Saeed Saeed Ed->Saeed Ed, John Saeed, Ivan Chan B I2C “Working” on FED External Devices Temp 4th November 2003 To be Implemented Spy Clocks FEDv2