AEC Budget An estimating application for construction contracting companies Product High Level Features
Service cost/hour = Usage Rate per Hour + Fuel Cost Machine wise rental calculations are tabulated below Enter asset basic cost at [3], its life in hours at [4] and life in years at [7]. Enter Depreciation % at [5], Maintenance % at [6], Interest rate % at [8] and operator’s cost at [12]. System calculates each cost component and sums up as MRate (equivalent market rental rate). Select desired Machines and click Set to Project at [16]. This will update the Project Resource Rates. Click Set to Master at [17] to update the Master. Click Export and Import at [18] commands to work with Excel Interest Rates generally vary from 5-18% [9]. Depreciation cost = Dep% * BasicCost/Life (Hrs) {= [5]* [3 ]/[4]} [10]. Maintenance Cost = Depreciation Cost x Maint % {=[8]*[5]/100] [11]. Interest = ( P*(1+r/100)^n)-P)/(Life Hrs) {=([3]*((1+[8]/100)^[7])-[3])/[4]} [12]. Enter Operator cost per hour [13]. Total Rental Rate (MRate)/Hr [13] = [9]+[10]+[11]+[12]
Every kind of complex tool is built-in
Ease of working
Reports – Cash flow Cost summary Worksheet reports Detail RA Resource costs Material wise costs Machinery wise costs Machinery mobilization Fuel costs Cash flows Component and Group wise costs Task vs Component comparison Indirect budget Customizable reports
Reports – BOQ/Task Cost Summary Cost summary Worksheet reports Detail RA Resource costs Material wise costs Machinery wise costs Machinery mobilization Fuel costs Cash flows Component and Group wise costs Task vs Component comparison Indirect budget Customizable reports
Reports – Resource Cost Summary Cost summary Worksheet reports Detail RA Resource costs Material wise costs Machinery wise costs Machinery mobilization Fuel costs Cash flows Component and Group wise costs Task vs Component comparison Indirect budget Customizable reports
This is a Next Generation Budget Thankyou for watching