VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012
Identify common objectives, and find opportunities for cooperative projects, tasks: water level gage datum updates, sea level change or subsidence studies Identify Products and Services within each agency impacted by new vertical datums: flood maps Update existing guidelines, standards, specifications to support transition to new datums Education, Outreach, Capacity Building for users Vertical Reference System Work Group Work Plan
Quarterly teleconferences - next meeting April 5, 2011 Developed worksheet for each agency to identify their products/services that rely on vertical datums Identify venues for outreach/education VRSWG Accomplishments: May 2010-Present
Infrastructure – Special Projects: So LA, MSDOT leveling and GPS, TN leveling, WI Statewide leveling adjustment – NA2011 – consistent ellipsoid heights – Updates to NGS Datasheet formats Announcement on NGS website Implementation to coincide with NA2011 release Relevant Height Modernization / NGS Accomplishments: July 2012-Present
Datasheet Format Changes Move ell ht and epoch info into top box, add datum tags Note when GPS Ortho Ht computed with previous geoid model, and provide that model ht Better way to quantify accuracies
Current Datasheet
Models/Tools – GEOID12 – GRAV-D – TX Geoid Slope project – VDatum – HTDP – VTDP – OPUS DB, Projects, etc. Relevant Height Modernization / NGS Accomplishments: July 2012-Present
Insert VDATUM slides here Relevant Height Modernization / NGS Accomplishments: July 2012-Present
HTDP (Trans4D)/VTDP – Plan to include a vertical component with HTDP = Trans4D Developed by Jeff Freymueller at UAF with Richard Snay Uses primarily CORS velocities Not ready for Prime Time in areas like Gulf Coast – Leveling projects in Gulf Coast region, added to NGS IDB since 1995, being incorporated into VTDP Relevant Height Modernization / NGS Accomplishments: July 2012-Present
Guidelines/Specifications – Guidelines for analysis and adjustment of survey data in areas prone to crustal motion – NC/FEMA Floodplain mapping pilot Relevant Height Modernization / NGS Accomplishments: July 2012-Present
Floodplain Mapping Pilot Project Goals: – Analyze how FEMA floodplain mapping will be affected by the release of the new datums – Provide recommendations for FEMA, cooperating partners and NGS Selected one stream with existing detailed study in coastal area Two Part Method: – Converted data to “proxy” datums ITRF 2005/GRS80 State Plane 3200 USGG2009 – Analyzed impacts to floodplain mapping Derived products (DEM creation from LiDAR) Watershed size difference Floodplain boundary and Base Flood Elevation change Bridge height sensitivity 11
Pilot Project: Conclusions 12 Significant coordinates shift Horizontal: ft/0.828 m Vertical: ft/ m Larger impact on higher accuracy elevation data DEMs derived from LiDAR can be transformed directly for hydrology, may use same models Minimal changes in the floodplain, will depend on the location, the mapping method, and engineering judgment Existing models will need to be revised to use ground data collected in new datums While this study provides the first look at the expected effects, additional studies are warranted prior to the 2022 modernization The development of an implementation plan is extremely important for FEMA and other agencies Important to have a clear message and communication to constituents Full Report:
Part A: Coordinates US ftAverageMaxMinStDev dx dy dxy dH MetersAverageMaxMinStDev dx dy dxy dH
Part B: Derived Products 14 DEM Elevation Differences Transformed - LiDAR AverageMax.Min.Std Dev. Feet Meters
Part B: Watershed Difference 15
Part B: Floodplain Mapping 16
17
Part B: Bridge Height Sensitivity Cross Section Top Width Difference (ft)BFE Difference (ft) BRIDGE CROSS SECTION
Outreach/Education – Geospatial Summit – Monthly Height Mod teleconferences to inform users – value- added with guest speakers – Website completed – Lidar Forum – August 2011 – Height Mod Partner meeting – August 2011 Relevant Height Modernization / NGS Accomplishments: July 2012-Present
First draft of overall Plan complete and being reviewed Strategic plan development underway Operating plans will be developed from these Emphasize coordination with federal partners and local partners Develop budget strategies National Height Modernization Program Plan
Questions Renee Shields Height Modernization Manager , x116