California Coastal Commission Permitting For Emergency Response to the 2010 El Nino Storm Event Department of Public Works July 2011.

Slides:



Advertisements
Similar presentations
Carmel River Lagoon Update A presentation to the Carmel Point and Lagoon Preservation Association Monterey Peninsula Water Management District Status of.
Advertisements

Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Topic 19 Shoreline Engineering
SPTC – JPA RAIL/TRAIL CORRIDOR Presented by John Segerdell, CEO Sacramento-Placerville Transportation Corridor Joint Powers Authority (SPTC-JPA)
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Flood Avoidance and Mitigation
Integrating Community Planning and Hazard Mitigation Planning Amanda Engstfeld FEMA Region X
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
Coastal Impacts: Beaches, Sand Spits, and Bluffs Amber Moore University of Washington School of Marine Affairs 12 February 2009 Amber Moore University.
SEA LEVEL RISE: A California Perspective Julie Thomas Coastal Data Information Program Southern California Ocean Observing System Scripps Institution of.
The Adapting to Rising Tides Project San Francisco Bay Conservation and Development Commission Hayward Resilience Study.
May 18, 2011 RISING TIDES: West Coast Sea Level Rise Implications for Infrastructure Improvements and Coastal Flood Protection Darryl Hatheway, Sr. Coastal.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Sec 2 IDS, 2010 Coastal Management. You will learn: 1.Evaluate the feasibility of coastal protection measures at Pulau Ubin.
Local Adaptation Efforts Along the Massachusetts Coast Julia Knisel Coastal Shoreline & Floodplain Manager.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Mouth of the Columbia River Jetties Major Rehabilitation.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Coastal Preservation Surfrider Foundation CA Chapter Conference Aug. 27, 2010.
Tracking No Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master.
Department of Public Works Winter Great Highway Emergency Case Study.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
CLEAN WATER ACT Section 319 Grant Funds Robin F. “Rob” Rung Contracts / Grants Officer Water Quality Planning Bureau Department of Environmental Quality.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
City of Solana Beach Local Coastal Program Land Use Plan Amendment CCC Item Th8a November 14, 2013.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
City of Solana Beach Local Coastal Program Land Use Plan Amendment CCC Item Th7d January 9, 2014.
US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Josephine Axt, Ph.D. Chief, Planning Division Los Angeles District July 10, 2013.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Item Th10b (City & County of San Francisco, DPW) 1 No (San Francisco Dept. Public Works) Coastal Commission Hearing July 2011 Agenda.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Climate Change Adaption for At Risk Communities Hal Shepherd Water Policy Consulting, LLC (907)
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
Back River Flooding and Shoaling Citizens Committee Back River Flooding and Shoaling Citizens Committee August 15, 2007.
POM & I-84/US 730 IAMPs Morrow County Planning Commission Hearing December 20, 2011.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development.
CP-TXT Amendment to the Capital Improvements Element (Annual Update) September 25, 2007.
Jefferson County SA Red Rocks Site Approval
Parks and Recreation Commission
Continuing Authorities Program
Construction Management & Inspection
Cost Sharing Responsibilities
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
NH 1A Maintenance – Going beyond the roadway
Ohio Department of Natural Resources Office of Coastal Management
Presentation transcript:

California Coastal Commission Permitting For Emergency Response to the 2010 El Nino Storm Event Department of Public Works July 2011

Presentation / Overview Project Area and Vicinity History / Background Summarize the History of El Nino Storm Damage 1997 to 2010 Illustrate Potential Impacts to the Lake Merced Tunnel Present Project Elements Key California Coastal Commission Concerns: Alternative Analysis Sand Supply Sea Level Rise Monitoring and Maintenance Public Access and Recreation Visual Resource Long Term Planning Efforts Funding

Project Area and Vicinity The project area is located along Ocean Beach and the Great Highway, from Sloat Boulevard to Skyline Boulevard Project Area

History of Wastewater Facilities In 1979, in response to the Clean Water Act to improve water quality, the City prepared and the Coastal Commission adopted the San Francisco Wastewater Public Works Plan to address combined sewer overflows. Following the adoption of the plan, the following facilities were constructed to reduce combined sewer overflows from over 58 to 8 events per year: Westside Transport and Storage Structure Westside Pump Station Lake Merced Transport Tunnel Oceanside Treatment Plant and Southwest Ocean Outfall

Wastewater Facilities West Side Pump Station Lake Merced Transport Tunnel West Side Transport Box Southwest Ocean Outfall Oceanside Treatment Plant

Summary of Ocean Beach Activities This section of coast (Point Lobos to Sloat Boulevard) has been a managed system that was originally constructed in the early 1900s Integrally tied–in to large scale coastal processes in the vicinity Beach has experienced an erosional trend, resulting in several studies being conducted by the Corps and City since 1992 Substantial resources have been spent in seeking solutions Significant stakeholder outreach has occurred over this time period Major infrastructure is at risk in certain locations, with disastrous consequences if not addressed City is seeking interim solution until long-term solution is developed/ funded/ implemented

Erosion Trend–Sloat Parking Lots South Parking Lot North Parking Lot

Erosion Trends Reach 1Reach 3 09/07/ /23/ /15/ / /30/ /26/ /31/ /10/ /30/ /13/ /14/ Total50 feet70 feet

Beach Elevation Trends

2010 Storm The El Nino type storms during the winter of 2009/2010 were a result of 7 foot tides and 22 foot run up over an extended period of time along Ocean Beach.

Summary of 2010 El Nino Storm Damage Reach 3 Reach 2 Reach 1

Potential Impacts to the Lake Merced Tunnel The loss of bluff during the El Nino storm events is encroaching upon the Lake Merced Tunnel. Currently, there is 22 feet between the tunnel and the eroding toe of the bluff. Jacobs Associates, a consultant for the PUC identified the loss of side slope as a critical concern and recommended in-situ ground improvements to protect the tunnel from additional regression of the bluff slope. Reach 1

Risk Analysis A January 2010 type storm would result in 20 to 40-feet of bluff recession. 1.The probability that the Tunnel in Reach 3 would be threatened immediately (within 5 to 7 years) is over 80% without the pile wall. The probability of roadway closure is over 95% over the same period. 2.The probability that the Tunnel in Reach 1 would be threatened in the near future (within 5 to 7 years) is over 80% without the revetment in place. 3.The probability that the Tunnel in Reach 2 would be threatened in the near future (within 5 to 7 years) is about 50%. Reach 1

Project Description SFDPW is requesting to extend the authorization for the emergency revetments (a) Permitting the constructed EQR that was in response to the 1997 El Nino event. (b) Permitting and re- grading the 2010 emergency revetment to provide a well-defined transition at the southern end of Reach 1, prevent erosion further south, and reduce the need for additional rock to be imported EQR 2010 Rock Revetment

Project Description ( c) Permitting proposed pile walls at Reach 2 & 3 to protect the Tunnel from future storm damage. (d) Permitting the Great Highway south of Sloat Boulevard that was realigned based on traffic counts, factor of safety, storm strengths, and storm reoccurrence analyses. Need for structural support to protect the Lake Merced tunnel Rationale for the Great Highway southbound lane realignment. Reach 2Reach 3

Alternatives Analysis Reach 1Reach 2 Moving the southbound roadway east eliminates the immediate need for structural improvements at Reach 2 and other portions of the Great Highway excluding Reach 3. At Reach 3, alternatives such as pile walls, rock revetments, buried seawalls, and no-action were explored. Pile walls were selected because other alternatives would require construction on National Park Service property and additional permit approvals. Reach 3

Sand Supply With the primary source of sand originating from off-shore systems, the reduction of sand supply threatens the existing beach. Shoreline erosion along the bluffs is not sufficient to replenish beach sand and the geology of the bluffs does not contain an adequate supply of compatible sand to support the beach long term. Even with the abandonment of the southbound lanes and the allowance of bluffs to retreat, there is not enough land for a beach to establish itself in front of the Lake Merced Tunnel.

Sea Level Rise The structure generally can accommodate up to 3-4 feet of sea level rise, after which the overtopping could be more frequent than once every 100 years. Example at Reach 1: The existing beach bluff will further be threatened by storm swells given sea level rise. Revetment height 4 feet sea level rise Run-up from 22 foot storm swells during El Nino storms Existing 30 foot revetment Sea Level

Monitoring and Maintenance A Monitoring and Maintenance Plan will be developed to: Track the rate of shoreline erosion Monitor performance of the structures Establish triggers for management actions The Monitoring and Maintenance Plan will need be amended in response to adopted and implemented Beach Nourishment Plan and Ocean Beach Master Plan.

Public Access and Recreation Establish and maintain existing beach access via sand ladder along Sloat Blvd. Reposition existing rock in 2010 revetment to create a ramp for beach access Provide a path along the original southbound traffic lanes for lateral access In the Public Access Plan, there are several proposals to reestablish beach access

Visual Resource The visual condition at Ocean Beach in the 3000 feet project area varies from rubble to naturally eroding bluffs. The 1997 EQR was constructed in an area lined with rubble. The 2010 revetment was designed to protect infrastructure and natural bluffs. The remaining 2000 feet of the project area is lined with rubble and other debris EQRRock, rubble and debris from retreating bluffs Rock revetment in response to the 2010 El Nino storm event Rubble and other debris along the project area from eroding bluffs

Long Term Planning Efforts SFDPW continues to support collaborative long term planning processes in order to maintain the sustainability of the City’s infrastructure and to preserve wildlife habitats, beach access, and natural processes. Current Long Term Planning Efforts NPS – General Management Plan Draft EIS 08/2011 – 09/2011 USACE & NPS – The Beach Nourishment Plan Draft Report 10/2011 Draft EA 11/2011 SPUR – The Ocean Beach Master Plan Concept Plan 12/2011 – 01/2012 SFPUC – Sewer System Improvement Program Present – 2014 When implemented, these plans individually or collectively would serve as guiding documents to the future of Ocean Beach and Great Highway Corridor.

Funding YearPurposeCCSF ($) CA DBW Grants ($) Federal Grant for USACE work ($) 1996Revetment 500, Initial Sand Nourishment 350, Sand Nourishment 298,000100, Sand Nourishment and Beach Post Monitoring 400,000 Reconnaissance Phase of Corps Project 100,000 Studies for Long Term Solutions 470,0001,100, Detour Southbound Lane 342, Ocean Surveys and USACE Labor for the alternatives report 200, Completed near shore surveys and continuing to monitor the pilot study disposal site 200, & 2009Army Corps 933 Program Study 744, & 2011 Revetment, Roadway Repairs, Drainage Corrections 2,500,000 Technical Studies 500,000 TOTAL$5,360,859$1,200,000$1,244,000 To date, $7.8 million dollars has been spent to provide emergency response beach nourishment, study, and monitoring primarily south of Sloat.

Conclusions The permit request by the City is only the minimum structures that directly protect its infrastructure related to the impact of the El Nino storm event, namely relocating the roadway where feasible, installing the two revetments, and identifying the need to install two pile walls. Over the past 15 years, the City’s responses to the area have been episodic as isolated El Nino type storms are triggering emergency responses. As the dynamic situation at Ocean Beach unfolds, the ability to address future El Nino type events depends on the ability of stakeholders and public agencies to determine and implement short and long term solutions in non emergency situations. Over the past 15 years, the City has funded sand nourishment projects, assisted the USACE in federal appropriations for long term planning, supported USGS ongoing studies and monitoring, prepared numerous monitoring reports, generated technical studies on risk analysis and alternatives, engaged stakeholder groups and supported the SPUR Master Plan effort.

Questions?