ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
FP7: EuCARD after a year of preparation… A.Jeremie.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Special ATF Session - ATF/ATF2 day on 28th September -
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
13th ATF2 Project Meeting Summary
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Auxiliary Positron Source
Oversea collaborators
Beam-based alignment measurements
ATF2 Instrumentation Stewart T. Boogert
3rd ATF2 Project Meeting, December 18-20, 2006
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK

Priority of the Commissioning Task The main task of the commissioning team is to achieve the 35nm vertical beam size at ATF2 IP. But … The 1 st priority of the ATF2 commissioning in 2008 is to pass the radiation inspection. The radiation inspection is not only for ATF, but also for all of KEK accelerators. In the radiation inspection, we must operate the ATF with 10% of maximum beam power (2x bunches 12.5Hz). The beam intensity is far from the normal operation. We must concentrate not only ATF2 beamline commissioning, but also reduction of the injection loss to DR. - We will install new RF gun to reduce the dark current. - We must stabilize the linac water system. - We must put more radiation shield etc.. Thereby, we have no idea how much time will be prepared for the ATF2 beam study in I think most of the beam study will be started from early 2009.

Beam line commissioning DR study ( fast ion, DR emittance … ) Hardware study at the extraction line ( FONT, Laser Wire … ) Device Commissioning for ATF2 (cavity BPM, Mover, Guarder, Magnet PS ) Extraction line tuning and study ( dispersion, coupling correction, emittance growth at extraction… ) ATF2 final focus line study ( beam size tuning, stabilization … ) ATF2 Start early 2009 ~ ? Schedules of ATF2 commissioning Reduction of radiation loss early December Radiation Inspection Fast Kicker Study ?? ( Not yet decided ) The “fast kicker study” will be used the special setting. Injection stabilization

QF9AFF /m QD8FF /m QF7FF /m QF3FF /m turn on only 4 quads QF9AFF QD8FF QF7FFQF3FF Advantage Small number of beam steering knob Small beam size MS1FFMS2FF MSPIP Disadvantage Example of Special Optics for Commissioning Difficult to put IPBPM same to the nominal Final focus section Extraction section Mechanical alignment of bending magnet rotation Fix the strength of the bending magnet and easy to make a orbit reference Possible to be first step of BBA Possible to be BPM calibration

For Commissioning from November 2008 Beam deliver to the dump with small beam loss - Beam delivery to the dump KEK, … - New RF gun commissioning KEK, … - Realize the good injection efficiency KEK, … ( linac stabilization etc. ) - PLIC cable SLAC, … Hardware Commissioning for ATF2 ( including the software work ) - Commissioning of magnet PS SLAC, KEK, … - Commissioning of magnet mover and guarder SLAC, LAPP, KEK, … ( beam steering test with mover ) - Commissioning of Cavity BPM JAI, UCL, SLAC, KNL, KEK, … ( calibration of position sensitivity with beam ) The list of beam commissioning team tasks

For Commissioning from January 2009 ?? Optics Modeling ( ORM ? ) - Measurement of the quadrupole strength error KEK, SLAC, (Daresbery ), … and optics modeling of the extraction and ATF2 beamline - BBA ( with/without Mover ) KEK, SLAC, … Beam diagnostics at extraction line * - Dispersion correction KEK (Vsystem based), SLAC (FS based ), … - Coupling correction KEK, SLAC, LAL, … - Beta Matching KEK, SLAC, … - Emittance growth study from DR to EXT LAL, (Daresbery), SLAC, KEK, … The list of beam commissioning team tasks ( continued.. )

For Commissioning from January 2009 ?? IP BSM Development - Laser Interferometer ( Shintake Monitor ) U. of Tokyo, KEK, … - IP BPM KEK, ( KNU ? ), … - Carbon Wire Scanner SLAC, KEK, … Feedback Study - Orbit Feedback ( long term ) * KEK, SLAC, LAL, … - Intra-train feedback Oxford, JAI, … - IP feedback LAL (software), … Beam size tuning at ATF2 final focus line FF Optics test before IP BSM ready LAL, (IHEP), … - with large beta optics - by IP waist scan IP beam size tuning with IP BSM All ( representative Kuroda-san ?? ) The list of beam commissioning team tasks ( continued.. )