ME 4054W: Design Projects RISK MANAGEMENT. 2 Lecture Topics What is risk? Types of risk Risk assessment and management techniques.

Slides:



Advertisements
Similar presentations
Operation & Maintenance Engineering Detailed activity description
Advertisements

Quality Management System Corrective and Preventive Actions Argenis Osorio – Manager, Quality Assurance 19 September 2013 FACULTY MANAGEMENT.
PROJECT RISK MANAGEMENT
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Failure Mode and Effect Analysis
Failure Effect Mode Analysis
Risk Management Chapter 7.
Reliability Risk Assessment
Failure Mode & Effect Analysis Tom Hannan & Kevin Kowalis Eastern Illinois University School of Technology Total Quality Systems INT 5133 (FMEA)
Root Cause Analysis Presented By: Team: Incredibles
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
Popcorn Sample PFMEA: Process Flow
1 CE-407 Project Planning, Management & Engg. Economics, 02 Credit Hours Spring 2015 Lecture 02 Work Breakdown Structure by Faisal Rehman Department of.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
LSU 10/09/2007Risk Management1 Risk & Risk Management Project Management Unit #5.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
8 Managing Risk Teaching Strategies
Barry Murash MBBit Nortel 2007
F.M.E.A (Failure Mode and Effect Analysis)
Failure Mode and Effects Analysis FMEA
Software Project Management
Failure Mode Effect and Criticality Analysis Adam Adgar School of Computing and Technology.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Quality in Product and Process Design Pertemuan 13-14
Quality Risk Management Methodology Anthony Cumberlege SAPRAA meeting - Randpark golf club, 20 March 2009.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
Chapter 11: Project Risk Management
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
Analyze Opportunity Part 1
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Root Cause Tutorial Page 1 More on Hazard Identification Techniques 1.Identify potential hazards that could threaten the safety of your employees,
Chapter 11: Project Risk Management
FAULT TREE ANALYSIS (FTA). QUANTITATIVE RISK ANALYSIS Some of the commonly used quantitative risk assessment methods are; 1.Fault tree analysis (FTA)
Lecture: Reliability & FMECA Lecturer: Dr. Dave Olwell Dr. Cliff Whitcomb, CSEP System Suitability.
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
Advance to the next slide when ready to start $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Sample.
Safety-Critical Systems T Ilkka Herttua. Safety Context Diagram HUMANPROCESS SYSTEM - Hardware - Software - Operating Rules.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Project Risk Management Planning Stage
Copyright 2013 John Wiley & Sons, Inc. Chapter 3 Monitoring and Controlling the Transformation System.
Corrective Action Training Document World Class Solutions for Global Applications Riverhawk.
Failure Modes and Effects Analysis (FMEA)
Failure Modes, Effects and Criticality Analysis
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Chapter 11: Project Risk Management Information Technology Project Management, Fifth Edition.
Six Sigma Greenbelt Training
Failure Mode & Effect Analysis (FMEA)
Fault Trees.
8 Managing Risk (Premium).
CHAPTER11 Project Risk Management
FMEA.
Failure Modes and Effects Analysis (FMEA)
Safety and Risk.
Failure mode and effect analysis
GE 6757 TOTAL QUALITY MANAGEMENT
The Importance of Project Risk Management
The Certified Quality Process Handbook Chapter 22: Preventive Action
Failure Mode and Effect Analysis
Failure Mode and Effect Analysis
Assessing and Managing Risk
Definitions Cumulative time to failure (T): Mean life:
A New Concept for Laboratory Quality Management Systems
PFMEA Summary Process Steps
Failure Mode & Effect Analysis
Presentation transcript:

ME 4054W: Design Projects RISK MANAGEMENT

2 Lecture Topics What is risk? Types of risk Risk assessment and management techniques

3 Risk Trivia The study of risk as a science started during the Renaissance in the 16 th century. The initial impetus was from the financial world. The word “risk” is derived from the early Italian word “risicare” which means “to dare”.

4 Risk Risk is a measure of the probability and severity of adverse effects. 1 1 Lowrance 1976 Risk involves the possibility of loss. Without the potential for loss, there is no risk. Managing risk involves choice. Without choice, there is no risk management.

5 Risk Risks are future events with a probability of occurrence and a potential for loss. If caught in time, risks can be avoided or have their impacts reduced. Completely eliminating all risk would be very expensive, if not impossible. The key is achieving an acceptable risk level.

6 What are some of the types of risk found in projects?

7 Types of Risk Found in Projects Technology risk Economic risk Market risk Timing risk etc. Human resource risk Operational risk Geographic risk Environmental risk The primary focus of the balance of this lecture will be technology risk

8 Team Exercise What are some items on your project that you consider risks? What are some of the attributes of the items identified as risks?

9 Risk Assessment Kaplan and Garrick 1981 It is common in risk assessment processes to seek answers to the following set of questions: What can go wrong? What is the likelihood that it would go wrong? What are the consequences?

10 What is Risk Management? businessdictionary.com The identification, analysis, assessment, control, and avoidance, minimization, or elimination of unacceptable risks. Identify, assess, prioritize, then manage risk.

11 Risk Management Haimes 1991 Risk management seeks to answer a second set of three questions: 1.What can be done and what options are available? 2.What are the associated tradeoffs in terms of all costs, benefits, and risks? 3.What are the impacts of current management decisions on future options?

12 Risk Management When should it be done? –Recommended practice is to apply risk management before “release” using judgment, expert knowledge and experience. –Risk should also be monitored throughout a product’s life. –Not all issues are identified before the fact. Analyzing and responding to failures is an important aspect of risk management.

13 Failure Mode & Effects Analysis (FMEA) FMEA is a structured approach aimed at identifying all possible failures in a design, process, product or service. It is also called potential failure modes and effects analysis (PFMEA) and failure modes, effects and criticality analysis (FMECA). Source: American Society for Quality (asq.org)

14 Failure Mode & Effects Analysis (FMEA) “Failure modes” means the ways, or modes, in which something might fail. Failures are any errors or defects, especially ones that affect the customer. Failures can be potential or actual. “Effects analysis” refers to studying the consequences of those failures. Source: American Society for Quality (asq.org)

15 Failure Mode & Effects Analysis (FMEA) The purpose of the FMEA is to take actions to eliminate or reduce failures, starting with those that are the highest priority. Ideally, the use of FMEA begins during the earliest conceptual stages of design and continues throughout the life of the product or service. Source: American Society for Quality (asq.org)

16 Failure Mode & Effects Analysis (FMEA) When to use FMEA When a process, product or service is being designed or redesigned, after quality function deployment. When an existing process, product or service is being applied in a new way. Before developing control plans for a new or modified process. Source: American Society for Quality (asq.org)

17 Failure Mode & Effects Analysis (FMEA) When to use FMEA When improvement goals are planned for an existing process, product or service. When analyzing failures of an existing process, product or service. Periodically throughout the life of the process, product or service. Source: American Society for Quality (asq.org)

18 FMEA Procedure 1.Assemble a cross-functional team with diverse knowledge about the process, product or service and customer needs. Functions often included are: design, manufacturing, quality, testing, reliability, maintenance, purchasing, sales, marketing and customer service. Suppliers and customers can be added, if needed, to supplement the team. Source: American Society for Quality (asq.org)

19 FMEA Procedure 2.Identify the scope of the FMEA. Is it for a concept, system, design, process or service? What are the boundaries? How detailed should we be? Source: American Society for Quality (asq.org)

20 FMEA Procedure 3.Complete the FMEA form beginning with the identifying information at the top of the form. Source: American Society for Quality (asq.org)

21 FMEA Procedure In an FMEA, potential failure modes are rated on the following attributes: –Severity (S) is an assessment of the severity of the potential effect of the failure. –Occurrence (O) is an assessment of the likelihood of occurrence of the failure. –Detection (D) is an assessment of the likelihood that the problem will be detected before it reaches the end-user/customer.

22

23

24

25 FMEA “By The Numbers” The Risk Priority Number (RPN) is defined as: RPN = S x O x D The Criticality Index (CI) is defined as: CI = S x O

26 FMEA “By The Numbers” RPN and CI are used to assess the risk associated with potential problems in a product or process design and to prioritize issues for corrective action. The RPN or CI values that require action are project/product-specific. An approximate rule of thumb is if RPN ≥ 200 or CI ≥ 40, then that risk should be mitigated. All risks with severity of 10 must be mitigated.

27 Simple FMEA Example Source: American Society for Quality (asq.org)

28 “Completing” the FMEA Use the RPN and CI to set priorities for corrective actions. Assign responsibilities and target completion dates for the corrective actions. After action is taken, reassess S, O and D and recalculate RPN and CI to determine if additional actions are needed.

29 Risk Management Decision Making The graphic at right provides a general guideline for decisions about when to mitigate risks. There is no single right answer; a number of similar guideline tables exist. It is strongly suggested to err on the side of caution. Green = No mitigation needed Yellow = Consider mitigating risk Red = Risk mitigation needed

30 You’ve launched the product and there are failures. What now? The FMEA process is primarily focused on pre-release risk management, but can be used after launch. Many other processes, such as FRACAS, Fault Tree Analysis, Root Cause Analysis and 5 Whys are available to assess and manage failures of commercial products.

31 FRACAS FRACAS stands for Failure Reporting and Corrective Action System. FRACAS provides a process for reporting, classifying, analyzing failures, and planning corrective actions in response to those failures. Common FRACAS outputs may include: Field MTBF, MTBR, MTTR, spares consumption and reliability growth.

32 Sample FRACAS Process Flow

33 Root Cause Analysis Root cause analysis (RCA) is a method of problem solving that tries to solve problems by attempting to identify and correct the root causes of events, as opposed to simply addressing their symptoms. Focusing correction on root causes has the goal of preventing problem recurrence.

34

35 Fault Tree Analysis Fault tree analysis (FTA) is a top down, deductive failure analysis in which an undesired state of a system is analyzed using Boolean logic to combine a series of lower-level events.

36 5 Whys The 5 Whys is an iterative question-asking technique used to explore the cause-and- effect relationships underlying a particular problem. The primary goal is to determine the root cause of a defect or problem.

37 5 Whys Example The vehicle will not start. (the problem) o Why? - The battery is dead. (first why) o Why? - The alternator is not functioning. (second why) o Why? - The alternator belt has broken. (third why) o Why? - The alternator belt was well beyond its useful service life and not replaced. (fourth why) o Why? - The vehicle was not maintained according to the recommended service schedule. (fifth why, a root cause) A possible corrective action addressing the fifth Why and solution to the problem’s root cause is to maintain the vehicle according to the recommended service schedule. Adapted from

38 Risk Management Cycle