Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.

Slides:



Advertisements
Similar presentations
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
Irish Gulf, Boston, NY  Vertical eroding banks  Urban  Pool-riffle-pool regime  Gravel-cobble bed stream  Small stream (average width 30 ft, 10 ft.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP}
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
GOODWIN MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
River Research & Design, Inc.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
MISSOURI RIVER INNOVATIVE BANK STABILIZATION & AQUATIC & RIPARIAN HABITAT LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD.
SOIL-CHOKED STONE KEYS WITH VEGETATION
RACKET ELK CITY LAKE NEAR INDEPENDENCE, KANSAS PROJECT CONSTRUCTED DECEMBER 7-9, 2008.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
ONONDAGA CREEK, NEAR SYRACUSE, NY
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE

REPLACEMENT OF ONE BANK OF A CONCRETE-LINED CHANNEL CAZENOVIA STEPHENSON STREET BRIDGE SPONSOR: CITY OF BUFFALO, NY CONSTRUCTED OCTOBER MARCH 2006

CAZENOVIA STEPHENSON STREET BRIDGE Urban Urban Urban!! Steep bank slopes-fenced off for public safely, concrete lined channel Roads on top of both banks within feet of sloped bank of stream Dense urban single-family dwellings Floods fairly often due to flow, ice jams, & backwater effects from the Buffalo River City of Buffalo, NY project Pool-riffle-pool stream, less than 1% slope

PRE-PROJECT PHOTOS by Lallman Rambali NYS-DOT REGION 9 WINTER 2003

Ice on US side of Stephenson Street bridge. Pix by Lallman Rambali 2003

From Stephenson St. bridge, looking US. Pix by Lallman Rambali 2003

PRE-PROJECT PHOTOS by Dave Derrick FEBRUARY 24, 2005

Looking across stream, left bank in background. Pix by Derrick 2/24/2005

CONSTRUCTION PHOTOS by Jeff Fisk, Project Engineer, OCTOBER 2005

Looking left bank, US end of project. Pix by Jeff Fisk - Oct. 2005

Positioning & driving sheetpile. Note worker Pix by Jeff Fisk - Oct. 2005

CONSTRUCTION PHOTOS by Dave Derrick NOVEMBER 4, 2005

Looking DS. Old sheetpile removed, new installed. Pix by Derrick 11/4/2005

Looking DS. Driving sheetpile toe. Project is 1,000 ft long. Pix by Derrick 11/4/2005

CONSTRUCTION COMPLETE Photos by Derrick MAY 18, 2006

Looking DS. Trees-fence-shrubs-riprap-stone-sheetpile. Pix by Derrick - 5/18/2006

Looking DS. Close-up of soil-choked riprap mid-bank & upper bank shrubs. Note engineered soil-clay-gravel-organic mix for stability & plant growth of shrubs. Pix by Derrick - 5/18/2006

Robust upper bank rooted stock shrubs. Pix by Derrick - 5/18/2006

Looking DS. Shrubs and top-bank trees. Pix by Derrick - 5/18/2006

5 MONTHS AFTER PROJECT COMPLETION Photos by Derrick AUGUST 23, 2006

Mid & Upper bank vegetation growing well Pix by Derrick - 8/23/2006 TreesNo protection, 2 rows of shrubs Riprap with grasses Square cut stone with willow & dogwood whips Sheetpile

3 YEARS & 1 MONTH AFTER PROJECT COMPLETION Photos By Derrick JUNE 12, 2009

Looking left bank. Nice species diversity of plants. 3YRS 1 MONTH AFTER-CAZENOVIA STEVENSON ST-DERRICK

Vines & some veg growing amongst large toe stone 3YRS 1 MONTH AFTER-CAZENOVIA STEVENSON ST-DERRICK

Close up of robust mid & upper bank veg. 3YRS 1 MONTH AFTER-CAZENOVIA STEVENSON ST-DERRICK

4.66 YEARS AFTER PROJECT COMPLETION Photos by Derrick JUNE 16, 2010

4.66 YRS LATER-CAZENOVIA STEVENSON ST-DERRICK years after completion. From the bridge looking DS. Except for narrow band of stone at toe, dense veg has covered the entire bank.

4.66 YRS LATER-CAZENOVIA STEVENSON ST-DERRICK years after completion. From the bridge looking DS. Good diversity of plant species with some volunteer plants (Cottonwood, Black Locust, herbacious, some invasive Japanese Knotweed).

4.66 YRS LATER-CAZENOVIA STEVENSON ST-DERRICK years after completion. From the bank looking DS. Willow is growing well in the riprap section.

4.66 YRS LATER-CAZENOVIA STEVENSON ST-DERRICK years after completion. Looking at top bank.

5 YEARS AFTER PROJECT COMPLETION Photos by Chuck Godfrey Feb. 18, 2011

5 YRS LATER-CAZ STEVENSON ST-CHUCK GODFREY YEARS AFTER PROJECT COMPLETION. Ice is back!! DOT closed the bridge for 2 days, concrete channel UGLY

5 YRS LATER-CAZ STEVENSON ST-CHUCK GODFREY YEARS AFTER PROJECT COMPLETION. Ice flowing around plants & pounding project, plants look OK!!!

VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS- ON WORKSHOP, MARCH 2007

Looking US, Feb BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

Looking DS at supercritical flume-good hydro data GOODWIN CREEK – FLOOD APR 6, 2005

THE PLAN Actually Derrick’s cheat sheet PIX BY DANNY KLIMETZ

LET’S GET IT STARTED

1 of 7 trucks stuck GOODWIN CREEK – CONSTRUCTION - FEB 2007 –DANNY KLIMETZ

FILL CUT LPSTP Typical post-project cross-section

Looking DS, digging floodplain bench & placing soil along toe of right bank GOODWIN CREEK – CONSTRUCTION - FEB DERRICK

Sloping upper bank - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB DERRICK

Dave Derrick teaching some of the 44 workshop participants GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

The cutting, toting, & planting crew, I mean the workshop participants GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

Positioning & planting RPM trees & shrubs - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

Or slap a Sycamore with the trackhoe & release a thousand seeds GOODWIN CREEK – CONSTRUCTION - FEB DERRICK

Rolling and spreading hay mulch - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

BEFORE & AFTERS OVER TIME BEND #1

Looking US, Feb BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

Looking US – Construction Complete - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

Looking Bend #1 – 2.5 months later GOODWIN CREEK – 2.5 MONTHS – May 18, 2007 – DAVE BIEDENHARN

2.4 YEARS AFTER PROJECT COMPLETION Photos by Derrick JULY 3, 2009 BEND # 1

2.4 YEARS LATER-Looking Bend #1 – Rooted stock & pole plantings growing exceptionally well! 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK

2.4 YEARS LATER-Looking Bend #1 Rocked Riffle & vegged bank 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK

2.4 YEARS LATER-Looking upper end of Bend #1. THIS IS WHAT WATER SEES!!!! 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK

Soil was soft enough in places Live Stakes could be pushed in - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

2.4 YEARS LATER-Upper bank Sycamore Live Stakes are growing well. Several are 6 to 12 ft tall. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK

2.4 YEARS LATER- Sycamore Live Stakes growing well on upper third of bank (10-12 ft above base flow water surface elevation). Sycamore Live Stakes are 6-10 ft tall with robust growth. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK

July 2009 Looking downstream, what a difference 2 years after the project was completed makes !!

HAW CREEK, PIKE COUNTY, MISSOURI- TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY PIKE COUNTY PUBLIC WORKS DEPT, LaDON ATKINSON, ROAD SUPERVISOR

HAW CREEK GENERAL INFORMATION Bank erosion is threatening county road, threatening public safety Stream wildly meandering in response to historic straightening Decent riparian areas in places Bed material: gravel-sand. Channel is incised Pool-riffle-pool regime, slope less than 1% Average width ft, 15 ft tall banks Funding, equipment, and manpower provided by Pike County, MO

PRE-PROJECT PHOTOS by JAYNIE DOERR, REGULATORY, ST. LOUIS DISTRICT FEBRUARY 25, 2009

Looking the lower end of the project bend PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR

Looking the project bend. Road is 4 ft from 14 ft tall eroding bank. PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR

QUESTIONABLE STONE Stone used for keys & LPSTP was a sub-standard shot rock of questionable hardness. The amount of fine material was close to 20-30%. This was a self- filtering stone, but not well-graded, & not self-adjusting.

Stone is not well-graded & too many fines. The stone is self-filtering, but not self-adjusting, but only $4.70/ton delivered. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

STONE COSTS However, the stone was extremely inexpensive. The 432 tons of rock used in the project, at $4.70 per ton (delivered) total cost of stone = $2032. That was very cost effective for what we accomplished.

HAW CREEK METHODS EMPLOYED 110 ft of Longitudinal Peaked Stone Toe Protection (LPSTP), crest built to 4 ft above the base flow water surface elevation Locked Logs A vegetated floodplain bench Single-Stone & Short Bendway Weirs Live Willow Pole Plantings Vegetated & curved upstream key, straight DS key Living Dikes Slit Brush Layering (Joint Planting) in riprap bank Live Siltation

We will construct from upstream (US) to downstream (DS)

LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)

Stream channel Top bank Eroding bank ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Road

LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP} Description: A continuous stone dike placed longitudinally at, or slightly streamward of, the toe of the eroding bank. Cross-section is triangular. The LPSTP does not necessarily follow the toe exactly, but can be placed to form a "smoothed" alignment through the bend. Smoothed alignment might not be desirable from the environmental or energy dissipation points of view. Amount of stone used (2 tons/linear ft, 1 ton/ft, or less) depends on depth of scour at the toe, estimated stream forces (impinging flow) on the bank, and flood durations and stages. Tie-backs are short dikes connecting the LPSTP to the bank at regular intervals. Tie-backs are usually the same height as the LPSTP or elevated slightly toward the bank end, and are keyed into the bank. If tie-backs are long they should be angled upstream to act as bendway weirs.

Longitudinal Peaked Stone Toe Protection (LPSTP) As-built After a couple of high flow events stream has scoured at the toe & stone has self-adjusted Sediment has deposited landward of the LPSTP

Locked Logs are then “locked” under the Longitudinal Peaked Stone Toe Protection (LPSTP). ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)

Looking US. LPSTP crest is 4 ft above base flow stage CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Tree or shrub poles (called Live Siltation) installed on top of LPSTP Willow, dogwood, river birch poles can then be laid on the stone and up against the bank. Basal ends should be in vadose zone (capillary zone). Willow used on this project. Live poles laid against eroded bank

Looking US. Class laying willow poles against eroding bank. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Backfill material from point bar to form a floodplain bench at the Q-2 flood elevation

Looking DS. Backfilling between LPSTP & bank to form floodplain the Q-2 elevation. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

Looking US. Installing Living Dikes perpendicular to high flow, Live Siltation & Live Poles are parallel with the stream. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) At intervals, install willow Living Dikes (densely deep-planted adventitious poles perpendicular to direction of high flow)

A Living Dike (perpendicular to high flow) on the floodplain bench. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

Floodplain bench planted on a grid pattern Flow AERIAL VIEW OF ENHANCED LPSTP WITH A FLOODPLAIN BENCH WITH VEGETATION PLANTED ON A GRID PATTERN. Living Dikes- plants perpendicular to flow Live Siltation Live Poles

PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009

4 MONTHS AFTER PROJECT COMPLETION Looking US to DS Photos by LaDon Atkinson JULY 11, 2009

4 MONTHS LATER-Looking the project bend. 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking floodplain bench 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking the thalweg trace, LPSTP, Single Stone Bendway Weirs & the floodplain bench. 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

After 4 months, great growth from the 500 willows we planted! LaDon says the floodplain bench has about 6 inches of sediment deposition on it.

4 MONTHS AFTER PROJECT COMPLETION Looking DS to US Photos by LaDon Atkinson JULY 11, 2009

4 MONTHS LATER-Looking SSBW, LPSTP & Live Siltation 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking project & road 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking a Living Dike on the floodplain bench 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

Haw Creek Project (5 inch rain 48 hours prior to photos) September 20, 2010 Two Growing Seasons After Completion Photos By Rob Gramke, Regulatory, St. Louis District, U.S. Army Corps of Engineers

Looking upstream from road Sep 2010-notice how wide the shoulder appears now March 2009-bank 4 feet from road

Looking downstream March 2009 September 2010

Looking downstream from left descending bank. The vegetation has almost completely grown over the rock – Sept 2010

Short Bendway Weirs & Rock toe

Locked log still in place

Brothers separated at birth!!