Project Application 6 th edition Guidebook on APEC Projects Wednesday 15 February 2006.

Slides:



Advertisements
Similar presentations
INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
Advertisements

UNSW Strategic Educational Development Grants
APEC Project Management: Concept Note Development to The Full Project Proposal Presented by Khemrutai Khemmarat Department of International Economic Affairs.
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
2006/TPT-WG-28/HOD/006 PROJECT MANAGEMENT – For Information – APEC Secretariat 28 th APEC Transportation Working Group Meeting Vancouver, Canada 5-8 September.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
Financial, Reporting and Practical issues Per Mogensen, DASTI.
Implementation of Leader Axis measures by Jean-Michel Courades AGRI-F3.
ENA Chapter Treasurer DUTIES AND RESPONSIBILITIES.
SOCRATES PROGRAMME ADMINISTRATIVE AND FINANCIAL HANDBOOK FOR BENEFICIARIES Selection 2005.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
European Cooperation in the field of Scientific and Technical Research COST is supported by the EU RTD Framework Programme ESF provides.
APEC Communications & Public Affairs 15 th ATCWG Meeting 3 March 2011 APEC Secretariat.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) ‏ inhabitants inhabitants 43 inhab / km² 43 inhab.
APEC Project Management Workshop Presented by Rongvudhi Virabutr Department of International Economic Affairs Ministry of Foreign Affairs 19 July 2010.
Copyright © 2010 APEC Secretariat. Project Management : Implementation and Monitoring Presented by (Art) Phanpob Plangprayoon.
Project Overview, Objectives, Components and Targeted Outcomes
TPT-WG35 20–24 February 2012 Bangkok, Thailand Project Proposal : Cargo preference and Restrictions Applying to Specific Trades Speaker: MLTM Economy:
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
2015 A PPLICATION P ROCESS FOR APEC-F UNDED P ROJECTS Chen-Sheng Ho, Ph.D. Associate Research Fellow Chinese Taipei APEC Study Center Taiwan Institute.
APEC Project Circle Presented by Khemrutai Khemmarat Department of International Economic Affairs Ministry of Foreign Affairs 15 December 2010.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
“Beyond 2008” A Briefing 11th European Conference on Rehabilitation and Drug Policy Working together – Partners for Change Ljubljana, 6 June,
APEC Secretariat Presented by Luis Enrique Vertiz © 2011 APEC Secretariat Report to EWG 42 Kaohsiung.
EGNRET Projects Cary Bloyd EGNRET 27 Zhuhai, China 9-11 October 2006.
UN-REDD – QUICK OVERVIEW. The UN-REDD Programme. What it is? Since part of you may not have heard about the UN-REDD Programme, I have thought it could.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
APEC Secretariat Presented by Penelope Howarth, Program Director, APEC Secretariat EWG49 - June 2015, Gyeongju, Korea Copyright © 2015 APEC Secretariat.
© Commonwealth of Australia 2003 The Quality Assessment Framework.
ETCF-II is implemented by EUROCHAMBRES& TOBB TOBB ETCF-II is co-funded by the European Union and Turkey 1 CIVIL SOCIETY DIALOGUE- EU-TURKEY CHAMBERS FORUM.
APEC Project Management Workshop Presented by Rutchanee Uerpairojkit Department of International Economic Affairs Ministry of Foreign Affairs 21 June.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
Copyright © 2010 APEC Secretariat. PROJECT GUIDEBOOK & MULTI YEAR PROJECTS Presented by: NADIRA MAILEWA Director (Program) Project Management Unit (PMU)
Inside APEC 11 January 2006 APEC Secretariat Presented by Anita Douglas Communications & Public Affairs Director, APEC Secretariat.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Peter Scherer Head, Health Division 7 th Meeting of Health Accounts Experts and Correspondents for Health Expenditure Data Paris, September 2005.
ENHANCING OUR UNDERSTANDING OF APEC CONCEPT NOTE & PROPOSAL FORMS Chen-Sheng Ho, Ph.D. Associate Research Fellow Chinese Taipei APEC Study Center TIER.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
APPLICATION PROCESS FOR APEC-FUNDED PROJECTS Chen-Sheng Ho, Ph.D. Associate Research Fellow Chinese Taipei APEC Study Center Taiwan Institute of Economic.
Copyright © 2010 APEC Secretariat. Report to EWG 48 Port Moresby, Papua New Guinea Jonghan Park Program Director 19 November 2014.
2006/TPT-WG-28/HOD/007 PROJECT APPLICATION – For Information – APEC Secretariat 28 th APEC Transportation Working Group Meeting Vancouver, Canada 5-8 September.
Session II International and regional approaches to regulatory cooperation June 20, 2006 Yuki HAYASHI Deputy director International Standards and MRA Policy.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
49 th EWG Meeting, Gyeongju, Korea June 22-26, 2015.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity Structural Funds Information Team Brussels, 30 June 2005 Barbara Piotrowska, DG REGIO.
Copyright © 2010 APEC Secretariat APEC Seminar Institute of Diplomacy and International Affairs Taipei, January 10-11, 2013 Prepared by Steve Chen,
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
DG Justice and Consumers Project Modifications DG Justice and Consumers.
EuropeAid/152087/DD/ACT/LB Cultural activities 2016 Information Session 13 th June 2016.
Copyright © 2012 APEC Secretariat. Presented by: Andrew LLOYD, Program Director PROJECT MANAGEMENT UNIT (PMU) APEC Secretariat APPLYING FOR APEC FUNDS:
Organization of work and practical arrangements 28 April-10 May 2013 Geneva, Switzerland David Ogden, Acting Chief, Convention Operations Branch, Secretariat.
Interreg Atlantic Area Programme Eligibility Rules.
ECE362 Principles of Design
Overview of APEC project procedures
Interreg Atlantic Area Programme Partner Budget & Eligibility Rules
Overview of APEC project procedures
Тowards regionally-based standards of qualifications
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Helene Skikos DG Education and Culture
ESF IMPLEMENTATION IN MALTA
Process Reforms for Session 1, 2018
Technical Working Group meeting 21 March 2012 Brussels
United Nations Voluntary Fund on Disability (UNVFD)
APEC Project Management
APEC Project Cycle Overview
Presentation transcript:

Project Application 6 th edition Guidebook on APEC Projects Wednesday 15 February 2006

Project Application Projects are initiated by economies through Working Groups or Committees Relevant other APEC fora should be consulted where the work cuts across fora SOM may initiate projects on cross-cutting issues with the prior support of relevant APEC fora Projects from SOM Task Forces require at least in principle approval from SOM Projects from CTI sub-fora require explicit approval (and ranking) from CTI

Project Application 6 th edition Guidebook on APEC Projects Chapter 4 Annex B – Application form Annex B1 – Special format for databases and websites requesting APEC funding Annex B2 – Simplified form for self-funded projects Annex B3 –Quality Assessment Framework (QAF) Annex D – Assistance in filling in application form – maximum rates; common waivers

Project Application Face Sheet Title of Project –Short and simple –Explanatory –Distinctive –CTI sub-fora projects should contain the appropriate abbreviation e.g. SCCP, GOS

Project Application Face Sheet Proposing APEC Economy –At least one: usually the economy from which the Project overseer will come. Responsible for arranging co-funding (if required) Co-sponsoring APEC Economies –Number of proposing + co-sponsoring APEC economies must be three or more –No specific requirements on duties/ responsibilities (individual fora though may have their own rules on this)

Project Application Face Sheet Project number –Will be allocated by the APEC Secretariat –Takes into account the ranking of the project by the relevant APEC forum/fora APEC forum abbreviation/ year commencement/ postscript T – TILF A – APEC Support fund (ASF) ‘ ‘ - Operational Account

Project Application Face Sheet Choice of Funding –Operational Account: economic and technical cooperation –APEC Support Fund (ASF): capacity building for APEC developing economies Relevant sub-funds of ASF –TILF Special Account: cooperation projects on trade and investment liberalization and facilitation (15 areas in OAA part 1)

Project Application Face Sheet Financial information –Co-funding required for ASF projects –Co-funding required for TILF projects ~20% for projects from developing economies (11) ~50% for projects from developed economies –Co-funding desirable for Operational Account projects –Exceptions may be given for projects which are required of host economies eg IAP

Project Application Face Sheet Project start date: normally 1 January (current date for urgent projects) Project end date: at latest end November of year after start date. This allows for final disbursement by 31 December that year.

Project Application Face Sheet Brief description of project- its purpose and the principal activities (including when and where) –Emphasis is on brief - but giving a good overall picture of the project

Project Application Face Sheet Project Overseer –Should be knowledgeable of the substance of the project –Should not be a principal in the project

Project Application Project Design ((1) to (6)) (1) Be brief and relevant, concentrating on the most recent priorities (2) usually no more than 3 objectives (4) to (5) describe project outputs and how these will assist the target beneficiaries. This will help provide the answers to (3) on assessment

Project Application Project Design (6) TILF linkage. 15 items in OAA part 1 and where appropriate part 2 Consult with TILF co-ordinator. Ensure that PO/WG consult with Japan

Project Application Linkages ((7) to (9)) Director (Program) can add value by checking with colleagues on related work in other APEC fora WG should check not duplicating work of other international organizations Objective to ensure added value for the project

Project Application Methodology ((10) to (11)) This should be easy to understand for the reader of the project proposal It is desirable to have as many APEC member economies involved as possible in a project. There may be occasions when projects are demonstration projects involving one or two economies or where for obvious reasons projects are not applicable to all members (eg on mining)

Project Application Dissemination of Project Output (12) Consult with Director (Communications and Public Affairs) On-line / soft copy publication is often most cost- effective Publication costs should not normally exceed US$5,000 and often be considerably less Occasionally output may be suitable for a wider audience.

Project Application Gender Concerns ((13 to (14)) Ensure gender concerns are brought into the project at an early stage – eg a project on microfinance should consider the particular problems of access to micro- finance for women who make up a significant proportion of micro- entrepreneurs

Project Application Budget ((15) to (17)) and Annex A Direct labour –Speakers honorarium (not for government officials) maximum US$1,500: should normally be less than US$1,000 –Consultant fees – less than US$80/ hour (indicative amount) –Secretarial assistance – less than US$20/hour –Translators fees (including SI) – need to justify in project proposal

Project Application Budget Airfares budget should be based on broad regional parameters: –SE Asia –NE Asia –Australasia – separate costings may need to be given for Papua New Guinea –Latin America –Russia

Project Application Budget Airfares restricted economy class except for speakers/ experts for travel in excess of 12 hours where restricted business class is given Airfares for participants from travel-eligible economies only (11 APEC developing member economies). Participants from other economies must be funded by the relevant economy

Project Application Budget Per diem UN per diem of destination city paid for arrival day + duration of APEC event as additional payment 3 day workshop = 4.75 days per diem ( ) Per diem paid to all speakers/ experts: active participants from APEC developing economies only - with waiver and for a maximum of 2 per economy Government officials – waiver required

Project Application Budget Equipment – computer equipment should be required less and less now as such items are now more standard in ministries/ universities, etc Photocopying – maximum of US$2,000: payable on reimbursement only Communications – maximum of US$2,000. If videoconferencing can save travel costs the amount could increase

Project Application Budget Hosting costs Maximum of US$5,000 for a 2-day conference: pro rata for longer. Meals/ coffee breaks/ souvenirs are not fundable Organisers should use competitive bidding to source venues wherever possible. Not necessary to be in expensive city centre locations.

Project Application Urgent Projects (18) Urgency definition in Chapter 2 – related to Ministerial/ Leaders’ Statements/ Declarations

Project Application QAF For OA and ASF projects To be filled in by Small Group of relevant APEC forum (not by the PO) and results reflected back to the PO so that improvements may be made Only necessary to rescore if significant changes made as a result

Project Application A workshop on project management will be held later in 2006 THE END