M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
Project Scope Management
WCAG 2.0 Web Content Accessibility Guidelines Update Last Updated July 2007.
Your Project Proposal.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
Chapter 5: Project Scope Management
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Project Scope Management Process
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Status as of 9 August 2007  Rough concept draft only, much of it is incomplete  There are Notes for some slides, and none yet for others Note: This document.
Electronic Engineering Department Final Year Projects September 2008.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
@ Future Plans for SiD & Opportunities for collaboration H.Weerts Argonne National Lab.
WCAG 2.0 Web Content Accessibility Guidelines Update Last Updated August 2007.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Workshop Goals SiD RAL Workshop April 14, 2008 John Jaros.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Optimizing the SiD Detector - mainly a calorimeter perspective Andy White SiD Advisory May 5, 2008.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
How to Get Involved in SiD Richard Partridge Brown / SLAC LCWS 07.
Now what? 1.  I have short-listed projects I am interested in  I know the types of projects I would like to pursue  I have an idea of the resources.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Middle Fork Project Relicensing Process Plan April 25, 2006.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
1 Impedance-related and others collective effects Impedance-driven collective effects/Instabilities –Single-Bunch (very high priority) –Multiple-bunch.
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Status of the DCR Detector Chapter International Linear Collider (ILC) Workshop ILC-ECFA and GDE Joint Meeting in Valencia 7 November 2006 Detector Concept.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started AMS WMC and AMS Annual Conferences Click on play to begin show.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Preparations for the SiD Workshop at Fermilab, April 9-11
The SiD Detector Outline Overview
January Collaboration Meeting
The DBD: Outline and Scope
CHAPTER 4 PROPOSAL.
CHAPTER 4 PROPOSAL.
The Silicon Detector Design Study European Kickoff Meeting
Project Overview.
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of the call for LOIs What we learned from the DOD The SiD LOI effort SiD website update SiD Document database Mark Oreglia University of Chicago With special guest appearance: Tony Johnson, SLAC

M. Oreglia, ALCPG07, 23 Oct 2007 The Silicon Detector Guiding principles: use fine granularity matched to PFA techniques SiW ECAL … small Moliere radius, but expensive high field solenoid to balance smaller radius Si tracking: low mass; best  p/p; less senitive than gas to halo pixel vertex detector hermetic, integrated design Don’t call it “sid”

M. Oreglia, ALCPG07, 23 Oct 2007 SiD Organization

M. Oreglia, ALCPG07, 23 Oct 2007 Where to find information The SiD website: – You will find a database of talks, papers, workshops, and phone meetings Tony Johnson is making some changes, and he will tell you about that next

M. Oreglia, ALCPG07, 23 Oct 2007 The ALCPG07 SiD Sessions: Two sessions are available to SiD: – 8h30-noon, Tuesday, 23 October – 13h15-17h30, Friday, 26 October We need these sessions to: – set schedule for LOI preparation – review status of subsystems set milestones and assess R&D review manpower and pace – Determine (or at least discuss) how to select subsystem technologies decide what will be needed (and when) to make choices; identify responsible people – Discuss assessment of integrated performance – Identify the LOI writers…or at least start

M. Oreglia, ALCPG07, 23 Oct 2007 Charge to SiD Speakers We’ve got a lot to cover in little time. In order to get ready for the LOI we need the speakers on subsystem status to cover the following: –Summary of all technologies being considered –R&D in progress and needed for choosing a technology; manpower situation –Make clear where newcomers can contribute –activity and progress on integrating the subsystem: PFA, combined performance, benchmark reactions –Studies needed to provided essential information for LOI Speakers should think back to the Detector Outline Document and put themselves in the place of the DOD editor: what went wrong back then and what does the subsystem group need to do to be fully prepared for the LOI deadline, and for the technology choice procedure.

M. Oreglia, ALCPG07, 23 Oct 2007 SiD Concepts Schedule Tuesday, 23 rd Oct: –8h30-9h00 (30m) LOI Requirements and what we need to get there (M Oreglia) –9h00-9h30 (30m) SiD PFA and Simulation code (Steve Magill) –9h30-9h50 (20m) Benchmark reactions (Andrei Nomerotski) –10h15-10h35 (20m) VTX status (Su Dong) –10h35-10h55 (20m) TRK status (Rich Partridge) –10h55-11h15 (20m) ECAL status (Ray Frey) –11h15-11h45 (30m) HCAL status (Vishnu Zutshi) –11h45-12h15 (30m) How to make choices (John Jaros) Friday, 26 th Oct: –13h30-13h50 (20m) muon/PID status (Henry Band) –13h50-14h10 (20m) Forward systems (Bill Morse) –14h10-14h40 (30m) IR and MDI (Tom Markiewicz) –14h40-15h10 (30m) engineering; solenoid (Kurt Krempetz) –15h10-15h30 (20m) Electronics (Gunther Haller) –15h50-16h10 (20m) Optimization (M Breidenbach) –16h10-16h30 (25m) Rvw LOI tasks (Harry Weerts) –16h30-17h00 (30m) Discussion

M. Oreglia, ALCPG07, 23 Oct 2007 The LOI Announcement ILCSC wants LOIs by 1 October 2008 Goal is to facilitate two reference designs for TDR; as I understand it: –new Research Director (Sakue Yamada) and the yet-to-be-named IDAG play a big role here assess feasibility of groups (ie, critical mass) review R&D work in progress and needed possibly help interested parties join a detector concept Guidelines: – –The LOI should contain information on the proposed detector, its overall philosophy, its sub-detectors and alternatives, and how these will work in concert to address the ILC physics questions. –The evaluation of the detector performance should be based on physics benchmarks –It should contain a discussion of integration issues with the machine. It should be developed enough to allow a first preliminary assessment of civil engineering issues like interaction hall, support halls etc. –It should enable the reader to judge the potential of the detector concept and to identify the state of technological developments for the different components. Alternative technological options should be elaborated. Where needed, areas of further research and development should be identified, together with timelines and milestones. – The group submitting the LOI should define its position and role in the ongoing international research and development for a detector at the ILC. –should include a preliminary cost estimate for the detector. –should not exceed 100 pages.

M. Oreglia, ALCPG07, 23 Oct 2007 The SiD LOI Effort Hiroaki Aihara, Phil Burrows, Mark Oreglia agreed to be editors To meet the LOI deadline of October , we will need a draft by September 1 (DOD experience tells us it will take a month to polish it) –This means demonstrating adequate performance by the start of the summer –R&D or testing of some alternative subsystems will not be finished … how do we decide which system is baseline; how do we describe alternatives or cases where a decision has not been reached yet PFA and costing will be the difficult cases Triage: which physics benchmarks to have ready for LOI –How to put SiD’s best selling points in LOI? –Can Exec Ctte/ LOI Editors motivate new benchmarks that highlight SiD capabilities? The Marty ultimatum: forgo LOI if schedule/support unreasonable?

M. Oreglia, ALCPG07, 23 Oct 2007 A Likely Schedule: Date Milestone 10/1/08 Submit LOI 9/1/08 Begin Final Edit of LOI; complete authorlist 8/1/08 Complete LOI Draft Collaboration Review and Comment 6/1/08 GEANT4 Description Ready Performance Studies Ready Benchmarking Studies Ready 5/08 Freeze Detector Design SubSystems Fully Specified Subsystem Technologies/Alternates Selected Conceptual Engineering Designs Ready 3/08 Freeze Global Parameters First Pass Detector Design 2/08 First Pass Global Parameters 12/07 Subgroup Plans Defined Milestones and Deliverables Manpower Resources Needed

M. Oreglia, ALCPG07, 23 Oct 2007 Detector Outline Document These were due summer of 2006 –Requested by WWS to have something of substance about detectors in the Reference Design Report The SiD DOD is 189 pages, nearly twice the length limit of the LOI DOD can certainly serve as a foundation for the LOI, but changes need to be made –Format? MSWord versus LaTex –Much more/newer work on engineering issues –Progress on prototypes and beam tests How do we address/incorporate recommendations by the WWS R&D reviews??? But the biggest issue is demonstrating in the LOI that SiD can do the physics: PFA for SiD not demonstrated to achieve the requisite jet energy resolution yet

M. Oreglia, ALCPG07, 23 Oct 2007 LOI “Collaboration” In addition to a concise technical description of the proposed detector the LOI should present the structure of the group which is proposing the detector. The resource needs and their evolution in time should be presented. The LOI will not represent any formal commitment of the groups signing it to the project or the proposed detector. It should however enable the reader to judge the capacity and the seriousness of the groups to carry out the work until the EDR. R&D costs…”resource needs” … an important issue for all detector groups. The Exec Ctte needs to query the subsystem groups to report these needs to ALCPG as well as WWS/ILCSC –We are hoping the Research Director can work with GDE to provide additional funding to meet the TDR schedule

M. Oreglia, ALCPG07, 23 Oct 2007 Documents Database Needed The LOI calls for backup documentation: –The LOI can, but need not, refer to other documents where more technical details are given. If so these documents should be submitted together with the LOI. We therefore need to make use of the CERN-based document system devised for SiD (but largely unused), or go to another system and use it. Probably no time for the latter … or listen to Tony

M. Oreglia, ALCPG07, 23 Oct 2007 Updated SiD web site - Tony Johnson, SLAC Old SiD web site has a lot of outdated content –Difficult to update New web site –Easy to remember URL: –Content updated (still more to do) –Better integration with other ILC web servers Agenda Server, Doc Server, ILC forums –Searchable –Can embed active content (e.g. Forum, news feed) Based on Confluence Wiki –Once logged in to site you can Edit any page (if authorized) –No need to learn new tools, just use web browser, documentation built-in Comment on any web page Subscribe to be notified of changes to any page Create “news items” for display on home page

M. Oreglia, ALCPG07, 23 Oct

M. Oreglia, ALCPG07, 23 Oct 2007 Search

M. Oreglia, ALCPG07, 23 Oct 2007 Page Editing

M. Oreglia, ALCPG07, 23 Oct 2007 Next steps Links to old site will be redirected to new site If you need a confluence account: – –Select group “SiD” Need more help updating site –Especially from the working groups