THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.

Slides:



Advertisements
Similar presentations
Session 3 Performance Improving Consolidation and Upgrade scenario 1 Malika Meddahi, Lucio Rossi Thanks to all speakers and contributors.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Injector De-cabling Project Project Team Meeting #
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 1. Some recent views ( ) 2 Linac tunnel
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
LIU Beam Parameter Working Group Meeting #1: Ion parameter table Outline: Where we are standing What we need to do (still in 2015)
IEFC Workshop 9 th March 2012 – Magnet activities in IEF during LS1 – J. Bauche 1 Magnet activities during LS1 J.Bauche, on behalf of the TE/MSC/MNC section.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
EVOLUTION OF BEAM CHARACTERISTICS DURING THE LIU PROJECT R. Garoby for the LIU Project Team March 7, 2012CERN.
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
LIU / HL-LHC Cost and Schedule Review
AFC 2017 (and 2018) AFC timeline:
LIU Workpackages 1 August 2014 Edms Id LIU-PM-PP-0030
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
PS Booster Energy Upgrade
LIU-PS Beam Dynamics Working Group
Naming convention Rules
Planning and Installation
Update on the HiLumi/LIU parameters and performance ramp up after LS2
LIU project M. Meddahi LIU Project Team: G. Rumolo, J. Coupard, H. Damerau, A. Funken, S. Gilardoni, B. Goddard, K. Hanke, A. Lombardi, D. Manglunki, B.
WPs concerned by L4 connection:
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team

Goals & Means Mandate “The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL- LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain…” Implementation The LIU Project will:  Analyse the status of the injectors and the HL-LHC requirements  Propose an upgrade path for the injectors  Organise the upgrades (WBS with resources and planning) and take care of their implementation  Take care of hardware and beam commissioning

LIU Project Mandate (continued) … The project coordinator will have the responsibility for the project management (WBS, technical co-ordination and integration, manpower and budget agreement with the departments as well as budget and timescale control). The management will report on a regular basis to the Director of Accelerators and Technology. The executive role for manpower and budget for the projects/studies remains with the technical groups in the departments. Source: Project Management case study – P. Bonnal, M. Meddahi LIU Project Planning and Costing Project mandate and organisation

LIU-PSB coordination team K.Hanke – Activity leader B.Mikulec – Deputy V.Raginel – Scientific secretary project/liu- psb/ LIU- PS coordination team S.Gilardoni – Activity Leader H. Damerau– Deputy and Scientific secretary ern.ch/liu- project/liu-ps/ LIU-SPS coordination team B.Goddard – Activity leader E.Shaposhnikova – Deputy G.Rumulo – Scientific secretary sps/default.aspx LIU-Project Safety coordination A. Funken Director of Accelerators and technology LIU Project team Roland Garoby (Project Leader) - Malika Meddahi (Deputy) - Brennan Goddard (LIU-SPS machine coordinator) - Simone Gilardoni (LIU-PS machine coordinator) - Klaus Hanke (LIU-PSB machine coordinator) - Maurizio Vretenar (Linac4 Project Leader)- Anne Funken (Project Safety Officer)-Django Manglunki (LIU-Ion chain coordinator) Linac4 Project M.Vretenar Project Leader A. Lombardi Deputy PL project.web.c ern.ch/linac4- project/ LIU Administrative Support: Cécile Noels, Julia Double EVM coordinators: Jürgen De Jonghe, Benoît Daudin, Jose Bobes Bascaran Project Organisation Breakdown Structure LIU-Ion Chain coordination D. Manglunki – Activity leader B.E. Holzer – Deputy M. Bodendorfer Scientific secretary

Fellows

Work Breakdown Structure EMDS ID LIU Work Breakdown Structure 1LIU projectBCRoland Garoby LIU Management activities (EVM, APT, MTP, EDMS…)Roland Garoby - Malika Meddahi LIU 2General planning LIU 3SafetyAnne Funken LIU 4Quality assuranceRoland Garoby - Malika Meddahi LIU 5Design office-Fabrication-Subcontracting-Materials (EN-MME)Serge Mathot LIU 6IntegrationYvon Muttoni LIU 7Project team meetingsCecile Noels LIU 8Reviews - ConferencesCecile Noels 2LIU-PSBKlaus Hanke LIU-PSB ManagementKlaus Hanke + Bettina Mikulec LIU-PSB PSB Beam dynamicsElena Benedetto LIU-PSB MagnetsAntony Newborough LIU-PSB 4RF systemsAlan Findlay LIU-PSB 5Power ConvertorsSerge Pittet LIU-PSB Beam instrumentationJocelyn Tan LIU-PSB 7Existing BCBeam Intercepting Devices(L2B ) --> 63125C. Maglioni - Alternate Alessandro Masi LIU-PSB Vacuum SystemJan Hansen LIU-PSB 9LINAC4 to PSB transfer line and PSB injection systemsWim Weterings LIU-PSB 10PSB Extraction system and PSB-PS transfer lineJan Borburgh LIU-PSB ControlsJ. Betz LIU-PSB Electrical SystemsDavide Bozzini, Slawomir Olek LIU-PSB Cooling and VentilationGlen Mason LIU-PSB Installation, Transport and handlingIngo Rühl LIU-PSB 15Civil EngineeringLuz Anastasia Lopez-Hernandez LIU-PSB 16Radiation ProtectionRobert Froeschl LIU-PSB Machine InterlocksBruno Puccio LIU-PSB 18Alarms LIU-PSB 19Access Systems - Doors LIU-PSB SurveyTobias Dobers LIU-PSB Commissioning and OperationBettina Mikulec LIU-PSB 22Dismantling 3LIU-PSSimone Gilardoni 4LIU-SPSBrennan Goddard 5LIU-ION chainDjango Manglunki

- by EDMS team and Project Support Office Quality Control Templates and document handling and lifetime

WUs dictionary defined for all LIU machines - resources, schedule and deliverables Budget Control – APT by J. De Jonghe, B. Daudin, J. Bobes Bascaran OFC- Ordinary Financial Commitment PPAProjectBCGroupWBS10kCHF LIU Management Fellows, visitors, associates, travel etc.PBU-PRJLIU62011BE-HDO1.1; 1.8R.Garoby - PL PSB Management (M resources) PBU-PRJLIU-PSB67020BE-OP LIU-PSB 1 K.Hanke Integration studies (added to first budget version) PBU-PRJLIU-PSB EN-MEF LIU-PSB 1.5Y.Muttoni Beam Dynamics PBU-PRJLIU-PSB61020BE-ABP LIU-PSB 2 E. Benedetto Magnets PBU-PRJLIU-PSB99281TE-MSC LIU-PSB 3 A.Newborough RF-HL (from CONS) PBU-PRJLIU-PSB BE-RF LIU-PSB 4.1M. Paoluzzi RF-LL (from CONS) PBU-PRJLIU-PSB BE-RF LIU-PSB 4.2 & 4.4 M-E. Angoletta - A. Butterworth RF-TFB (from CONS 69710) PBU-PRJLIU-PSB BE-RF LIU-PSB 4.3A. Blas Power Converters (Injection)PBU-PRJLIU-PSB Grand TotalTE-EPCLIU-PSB 5.1D. Nisbet Power Converters (PSB) (5 MCHF coming from CONS)PBU-PRJLIU-PSB Grand TotalTE-EPCLIU-PSB 5.2S.Pittet Beam Instrumentation PBU-PRJLIU-PSB to BE-BI LIU-PSB 6J.Tan head and tail dump and the H0/H- dump PBU-PRJLIU-PSB EN-STILIU-PSB 7O.Aberle Vacuum System PBU-PRJLIU-PSB TE-VSC LIU-PSB 8J.Hansen Injection PBU-PRJLIU-PSB65730 to Grand TotalTE-ABTLIU-PSB 9W.Weterings Extraction, Transfer PBU-PRJLIU-PSB99236TE-ABT LIU-PSB 10 J.Borburgh Controls PBU-PRJLIU-PSB BE-CO LIU-PSB 11S.Jensen Electrical Systems PBU-PRJLIU-PSB EN-EL LIU-PSB 12D.Bozzini Cooling & Ventilation PBU-PRJLIU-PSB EN-CV LIU-PSB 13G. Mason Transport and Handling PBU-PRJLIU-PSB EN-HE LIU-PSB 14I.Ruhl RP and Safety PBU-PRJLIU-PSB DGS-RP LIU-PSB 16J.Vollaire Machine Interlocks (added to first budget version) PBU-PRJLIU-PSB TE-MPE LIU-PSB 17B.Puccio Survey PBU-PRJLIU-PSB BE-ABP LIU-PSB 20T.Dobers Commissioning PBU-PRJLIU-PSB BE-OP LIU-PSB 21B.Mikulec

Upgrade Timeline PSB-PS transfer 1.4 GeV  2 GeV Linac 4 ready PSB H - injection could be available Chamonix 2012 Linac 4 connection SPS aC coating, 200 MHz power upgrade completed LS1 for injectors LS2 for injectors 2019 Injectors commissioned to be ready for after LS LS = Long Shutdown - No beam LIU Project Baseline definition Priority to LHC Priority to Injectors Duration ~ 20 Months Analysis of different limitations and parameters definition

Next steps -Rebaseline LIU-PSB & LIU-PS WUs, baseline LIU-SPS WUs -Define baseline installation schedule for all LIU machines with planning office colleagues -Continue with all activities as scheduled and budgeted for readiness in LS2