THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team
Goals & Means Mandate “The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL- LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain…” Implementation The LIU Project will: Analyse the status of the injectors and the HL-LHC requirements Propose an upgrade path for the injectors Organise the upgrades (WBS with resources and planning) and take care of their implementation Take care of hardware and beam commissioning
LIU Project Mandate (continued) … The project coordinator will have the responsibility for the project management (WBS, technical co-ordination and integration, manpower and budget agreement with the departments as well as budget and timescale control). The management will report on a regular basis to the Director of Accelerators and Technology. The executive role for manpower and budget for the projects/studies remains with the technical groups in the departments. Source: Project Management case study – P. Bonnal, M. Meddahi LIU Project Planning and Costing Project mandate and organisation
LIU-PSB coordination team K.Hanke – Activity leader B.Mikulec – Deputy V.Raginel – Scientific secretary project/liu- psb/ LIU- PS coordination team S.Gilardoni – Activity Leader H. Damerau– Deputy and Scientific secretary ern.ch/liu- project/liu-ps/ LIU-SPS coordination team B.Goddard – Activity leader E.Shaposhnikova – Deputy G.Rumulo – Scientific secretary sps/default.aspx LIU-Project Safety coordination A. Funken Director of Accelerators and technology LIU Project team Roland Garoby (Project Leader) - Malika Meddahi (Deputy) - Brennan Goddard (LIU-SPS machine coordinator) - Simone Gilardoni (LIU-PS machine coordinator) - Klaus Hanke (LIU-PSB machine coordinator) - Maurizio Vretenar (Linac4 Project Leader)- Anne Funken (Project Safety Officer)-Django Manglunki (LIU-Ion chain coordinator) Linac4 Project M.Vretenar Project Leader A. Lombardi Deputy PL project.web.c ern.ch/linac4- project/ LIU Administrative Support: Cécile Noels, Julia Double EVM coordinators: Jürgen De Jonghe, Benoît Daudin, Jose Bobes Bascaran Project Organisation Breakdown Structure LIU-Ion Chain coordination D. Manglunki – Activity leader B.E. Holzer – Deputy M. Bodendorfer Scientific secretary
Fellows
Work Breakdown Structure EMDS ID LIU Work Breakdown Structure 1LIU projectBCRoland Garoby LIU Management activities (EVM, APT, MTP, EDMS…)Roland Garoby - Malika Meddahi LIU 2General planning LIU 3SafetyAnne Funken LIU 4Quality assuranceRoland Garoby - Malika Meddahi LIU 5Design office-Fabrication-Subcontracting-Materials (EN-MME)Serge Mathot LIU 6IntegrationYvon Muttoni LIU 7Project team meetingsCecile Noels LIU 8Reviews - ConferencesCecile Noels 2LIU-PSBKlaus Hanke LIU-PSB ManagementKlaus Hanke + Bettina Mikulec LIU-PSB PSB Beam dynamicsElena Benedetto LIU-PSB MagnetsAntony Newborough LIU-PSB 4RF systemsAlan Findlay LIU-PSB 5Power ConvertorsSerge Pittet LIU-PSB Beam instrumentationJocelyn Tan LIU-PSB 7Existing BCBeam Intercepting Devices(L2B ) --> 63125C. Maglioni - Alternate Alessandro Masi LIU-PSB Vacuum SystemJan Hansen LIU-PSB 9LINAC4 to PSB transfer line and PSB injection systemsWim Weterings LIU-PSB 10PSB Extraction system and PSB-PS transfer lineJan Borburgh LIU-PSB ControlsJ. Betz LIU-PSB Electrical SystemsDavide Bozzini, Slawomir Olek LIU-PSB Cooling and VentilationGlen Mason LIU-PSB Installation, Transport and handlingIngo Rühl LIU-PSB 15Civil EngineeringLuz Anastasia Lopez-Hernandez LIU-PSB 16Radiation ProtectionRobert Froeschl LIU-PSB Machine InterlocksBruno Puccio LIU-PSB 18Alarms LIU-PSB 19Access Systems - Doors LIU-PSB SurveyTobias Dobers LIU-PSB Commissioning and OperationBettina Mikulec LIU-PSB 22Dismantling 3LIU-PSSimone Gilardoni 4LIU-SPSBrennan Goddard 5LIU-ION chainDjango Manglunki
- by EDMS team and Project Support Office Quality Control Templates and document handling and lifetime
WUs dictionary defined for all LIU machines - resources, schedule and deliverables Budget Control – APT by J. De Jonghe, B. Daudin, J. Bobes Bascaran OFC- Ordinary Financial Commitment PPAProjectBCGroupWBS10kCHF LIU Management Fellows, visitors, associates, travel etc.PBU-PRJLIU62011BE-HDO1.1; 1.8R.Garoby - PL PSB Management (M resources) PBU-PRJLIU-PSB67020BE-OP LIU-PSB 1 K.Hanke Integration studies (added to first budget version) PBU-PRJLIU-PSB EN-MEF LIU-PSB 1.5Y.Muttoni Beam Dynamics PBU-PRJLIU-PSB61020BE-ABP LIU-PSB 2 E. Benedetto Magnets PBU-PRJLIU-PSB99281TE-MSC LIU-PSB 3 A.Newborough RF-HL (from CONS) PBU-PRJLIU-PSB BE-RF LIU-PSB 4.1M. Paoluzzi RF-LL (from CONS) PBU-PRJLIU-PSB BE-RF LIU-PSB 4.2 & 4.4 M-E. Angoletta - A. Butterworth RF-TFB (from CONS 69710) PBU-PRJLIU-PSB BE-RF LIU-PSB 4.3A. Blas Power Converters (Injection)PBU-PRJLIU-PSB Grand TotalTE-EPCLIU-PSB 5.1D. Nisbet Power Converters (PSB) (5 MCHF coming from CONS)PBU-PRJLIU-PSB Grand TotalTE-EPCLIU-PSB 5.2S.Pittet Beam Instrumentation PBU-PRJLIU-PSB to BE-BI LIU-PSB 6J.Tan head and tail dump and the H0/H- dump PBU-PRJLIU-PSB EN-STILIU-PSB 7O.Aberle Vacuum System PBU-PRJLIU-PSB TE-VSC LIU-PSB 8J.Hansen Injection PBU-PRJLIU-PSB65730 to Grand TotalTE-ABTLIU-PSB 9W.Weterings Extraction, Transfer PBU-PRJLIU-PSB99236TE-ABT LIU-PSB 10 J.Borburgh Controls PBU-PRJLIU-PSB BE-CO LIU-PSB 11S.Jensen Electrical Systems PBU-PRJLIU-PSB EN-EL LIU-PSB 12D.Bozzini Cooling & Ventilation PBU-PRJLIU-PSB EN-CV LIU-PSB 13G. Mason Transport and Handling PBU-PRJLIU-PSB EN-HE LIU-PSB 14I.Ruhl RP and Safety PBU-PRJLIU-PSB DGS-RP LIU-PSB 16J.Vollaire Machine Interlocks (added to first budget version) PBU-PRJLIU-PSB TE-MPE LIU-PSB 17B.Puccio Survey PBU-PRJLIU-PSB BE-ABP LIU-PSB 20T.Dobers Commissioning PBU-PRJLIU-PSB BE-OP LIU-PSB 21B.Mikulec
Upgrade Timeline PSB-PS transfer 1.4 GeV 2 GeV Linac 4 ready PSB H - injection could be available Chamonix 2012 Linac 4 connection SPS aC coating, 200 MHz power upgrade completed LS1 for injectors LS2 for injectors 2019 Injectors commissioned to be ready for after LS LS = Long Shutdown - No beam LIU Project Baseline definition Priority to LHC Priority to Injectors Duration ~ 20 Months Analysis of different limitations and parameters definition
Next steps -Rebaseline LIU-PSB & LIU-PS WUs, baseline LIU-SPS WUs -Define baseline installation schedule for all LIU machines with planning office colleagues -Continue with all activities as scheduled and budgeted for readiness in LS2