Injector De-cabling Project Enlarged project meeting # 1 25.06.2015 S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Project Management Basics
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
First part: Objectives (15 minutes) Second part: Work groups (20 minutes) Third part: Proposal of work groups (10 minutes) REPORT OF WORK METHODOLOGY.
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
V4.
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
Identification of the unused cables
Injector De-cabling Project
Buffer Zones - Status Report
East Area Renovation Project team #6 Launch safety agreement
YETS & LS2 Reminder G. Girardot 20 juin 2017.
YETS 2017 / 2018 Leszek Borakiewicz IT-CS-DO
De-cabling strategy during YETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Overview & baseline of LS2 and roadmap for CRG
Project Organization Chart Roles & Responsibilities Matrix
Experimental Areas – LS2 planning
4th Meeting of the MIG-P, Brussels, June 2016
Mandate and proposal for working methods
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team

Project mandate Scope of the Project The de-cabling project scope is to identify and remove obsolete cables within the injector complex, until the end of LS2. The activities will be organized according to the following priorities and goals: First priority: PS Booster The identification of the obsolete cables in the PS Booster is the top priority, because of the needs for new cables for the LIU project. The following strategies will be studied in parallel to allow a decision to be taking on the strategy to be used at the PSB by September  Total removal of all cables: The project team will, in particular evaluate the cost, the time needed, possible schedules and the associated risks and benefits.  Partial removal (i.e. only obsolete cables): The project team will organize the identification of unused cables with the different stakeholders. The goal for a partial removal campaign is to remove at least 50% of existing cables. Once the strategy has been chosen, the deadlines are:  Labelling and disconnection: YETS  Removal of obsolete cables: EYETS

Project mandate BOOSTER

Project mandate Second priority: SPS For BA5 and BA3, the objective is to identify respectively 50% and 40% of existing cables for removal, because of the congestion of the cable trays and the need to pull new cables. Moreover, the project team will have to closely follow the needs of the LIU project. The deadlines are:  Labelling and disconnection: YETS  During 2016, the project team will propose removal slots, taking into account the availability of resources and further needs of LIU project.

Project mandate Third priority: PS, TT2, Linacs For the PS, TT2 and the LINACs, the project team will identify the obsolete cables. The deadline is:  During 2016, the project team will propose possible identification and removal slots, taking into account the availability of resources and further needs of LIU project.

Project organization  The project is under the responsibility of the core team, and lead by the project leader Sebastien Evrard.  The members of the core team is a tripartite between EN-EL, EN-MEF and DGS-RP: o Booster: G. Minchev Georgiev, D. Hay,R.Froeschl o PS: P. Lelong, S. Mataguez, R. Froeschl o SPS: G. Gros, D. McFarlane, C. Tromel  Group link persons have been identified for each machine. The project leader will regularly report on the progress and issues encountered to IEFC. Project mandate

Group link persons mandate The group link persons is the point of contact for the analysis and definition of the work, and is coordinating for his group the decabling for a or several machines, in contact with his group experts and the decabling project team. In particular he/she will organize: The identification of obsolete (/used) cables with respect to the EL cablotheque and/or group database The edition of the DEC (Demande d’Enlevement de Cables) The labelling and disconnection of obsolete cables The updating of the group database after cable removal Project mandate