DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/27 A Control Software for the ALICE High Level Trigger Timm.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.
Who is UMA ? Peter Fischer, I. Peric, F. Giesen, V. Kreidl Lehrstuhl für Schaltungstechnik und Simulation Institut für Technische Informatik Universität.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey.
JRA1 Status: PCMAG, Sensors and Infrastructure Tobias Haas DESY/F1 11 September 2006.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
IPHC - DRS Gilles CLAUS 18/10/20061/22 EUDET JRA1 Meeting, Munich October 2006 USB board Firmware & Software Development status OUTLINE USB board firmware.
A PCI Card for Readout in High Energy Physics Experiments Michele Floris 1,2, Gianluca Usai 1,2, Davide Marras 2, André David IEEE Nuclear Science.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Towards the ‘final’ JRA1 DAQ Daniel Haas DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline.
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
The history behind the Mexican FIWARE Node... ICT 2015 Hugo Estrada, Miguel Gonzalez.
Online Reconstruction 1M.Ellis - CM th October 2008.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
David Cussans, 18 th October 2006 JRA1 Beam Telescope DAQ and Trigger.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE FACULTÉ DES SCIENCES UNIVERSITÉ DE GENÈVE EUDET JRA1 Meeting Munich October 2006 DAQ Status Emlyn Corrin.
David Cussans, 18 th October 2006 Status of the JRA1 Trigger Logic Unit (TLU)
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Emlyn Corrin.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
DAQ & data format Peter Fischer Institut für Technische Informatik, Universität Mannheim Presentation given at the EUDET / JRA-1 review, , Geneva.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
AIDA (mini) Trigger/Timing Logic Unit (mini TLU) Introduction Status Plans Summary 21/11/2013David Cussans, AIDA WP9.3, DESY1.
14.4. Readout systems for innovative calorimeters
DUT integration DAQ buffers & data format
EUDAQ Status Report Emlyn Corrin, 29 September 2010
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Testbeam Timing Issues.
3. Februar 2006 Tobias Haas DESY
Planning for the Demonstrator
AIDA (mini) Trigger/Timing Logic Unit (mini TLU)
State of developments on Readout interface of European DHCAL
Presentation transcript:

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software Status Upcoming Tests Financial Status (no slides)

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, EIB VRVS, Sep 2006 Page 2 JRA 1 - DAQ Planning

USB ADC Board & DAQ Status To Do List for next weeks, on last EUDET meeting …04/04/2006 … On board CDS is implemented => Must be Tested Trigger handling is implemented=> Must be Tested 6 Imager Boards synchronization - Master / Slave => Must be implemented & tested It will require ~ 4 weeks. Due to others projects, this work has been shifted from April to September, we hope to finish for October meeting ! A production of 12 USB ADC boards has been launched Components ordering and mounting by a private company We should receive first boards in October, Wait for result …Testing boards at lab … We hope to deliver first boards in February - March 2007 ( 7 boards ) JTAG GUI software extension for N Mimo* control is done

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, EIB VRVS, Sep 2006 Page 9 Trigger Logic Unit Simple Handshake via Trigger/Busy/Reset on RJ45 LVDS lines (or TTL-Lemo) Timestamp and event-number via USB Eventnumber via advanced data handshake on RJ45 available In collaboration with Bristol

TLU - more info 1 box in Geneva, 1 in Bristol –tested in July by Emlyn, David and myself 3 more boxes under production –will be distributed to interested parties –may eventually need to be shared We have to deal out the money issue First ‘guinea pig’ will be Bonn in October

file telescope DUT DAQ HW DAQ ctrl standard bus interfaces computer intfc Trigger DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, EIB VRVS, Sep 2006 Page 11 JRA1 - DAQ Synchronization via common TLU Digitization/Sparsification with dedicated HW or commodity equipment (USB interface) SW level integration with standard interfaces

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, EIB VRVS, Sep 2006 Page 12 JRA1 - DAQ Software Reuse - don’t reinvent Combine: –Existing DAQ from Bonn for DUT –Existing readout for Strasbourg hardware –Bristol library for TLU Added functionality: –creation of ROOT-files from binaries Upcoming functionalities: –Data reduction (CDS and Clustering) –Tracking (via Kalman-filter) –multi-PC acquisition, platform independence (?)

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP ZÜRICH, SEP 2006 Page 13

Upcoming issues Beam test for Bonn people –we want to help them use the TLU –sort out software issues (Emlyn) Software development will go on (basically only started in July) –e.g. external triggering of Strasbourg board –Data reduction and event building –DAQ Version 2 (rewritten, cleaned up code) (if possible, for Demonstrator already)