CARE 05, CERN, 25.11.05 1 2005 HIPPI Activities -HIPPI Structure -2005 Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.

Slides:



Advertisements
Similar presentations
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Advertisements

ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
1. 2 HIPPI at end Official end of the Activity in December 2008  no extensions will be considered. The remaining deliverables are due at the latest.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CARE 06, Frascati, HIPPI in HIPPI Objectives Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Linac4 Status 1 M. Vretenar sLHC public event
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
AMICI WP1 – Management, coordination and dissemination
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
The CERN Linac4 history, performance, perspectives
WP5 Elliptical cavities
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Complementary ISTC Projects #3888, 3889p
Accelerator Research and Innovation for European Science and Society
Part2: Cavities and Structures
Superbeams with SPL at CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
LINAC4 commissioning plans etc.
AMICI WP1 – Management, coordination and dissemination
Part2: Cavities and Structures
The SPL-based Proton Driver at CERN
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN

CARE 05, CERN, HIPPI: High Intensity Pulsed Proton Injectors Main objective: Research and development of the technology for high intensity pulsed proton linear accelerators up to an energy of 200 MeV. Applications of the HIPPI results: Upgrade of the linac injectors for GSI, CERN and RAL. 9 participating laboratories: RAL, CEA, CERN, FZJ, GSI, IAP-FU, INFN-MI, LPSC, IPNO Expected budget: 14.7 M€ (FC-equivalent), EU contribution 3.6 M€

CARE 05, CERN, Hot topics for HIPPI R&D  High shunt impedance normal conducting cavities Focusing elements integrated/separated in the structure  Low beta superconducting cavities Pulsed operation  Lossless injection in a ring Fast chopping  Control of the halo Beam dynamics code development

CARE 05, CERN, HIPPI Structure

CARE 05, CERN, HIPPI Management From 1 st July, 2005: Coordinator: M. Vretenar replaced R. Garoby Deputy Coordinator: A. Lombardi replaced M. Vretenar WP Coordinators: WP2: J.M. De Conto (IN2P3) WP3: S. Chel (CEA) WP4: A. Lombardi (CERN, confirmed) WP5: I. Hofmann (GSI) Reason for change purely CERN-related (R. Garoby took charge of the AB- BDI Group at CERN, and was forced to reduce his other activities). Continuity in the HIPPI Management, coordinator and deputy from CERN – allows sharing of tasks and more effective work.

CARE 05, CERN, HIPPI in Critical year: highest number of milestones in the entire project ! -Constant exchange of information, more integration inside work packages and between work packages (see ESAC report). -Internal and External (collaboration) meetings with good attendance and good quality of presentations.

CARE 05, CERN, Meetings

CARE 05, CERN, Dissemination & Recruitment -Publications of 26 HIPPI papers January-November 2005: 11 Conference papers, 7 CARE Notes, 8 HIPPI Documents (average of 2.4 per month). -Recruitment: 5 new positions in 2005 (relatively long term: 3 for 3 years, 2 for 2 years), which add to the 4 positions opened in 2004 (for 3 years). -HIPPI is recruiting talented and motivated young people and is training them in field of accelerators.

CARE 05, CERN, Attracting a new partner - Proposition for an additional member: INFN-Naples has experience in Side Coupled NC Structures for medical applications. The SCL team (Prof. Vaccaro &C.) is ready to participate to the HIPPI WP2 activity from A common programme has been defined with the laboratories working on this subject inside HIPPI and with the WP Coordinator.

CARE 05, CERN, Annual Meeting The Cosener's House Abbey Close Abingdon, UK (organised by RAL) -43 participants from all the participating laboratories (38 for HIPPI04). -30 technical presentations covering all aspects of HIPPI work. -25% of time devoted to questions and discussion. -2 members of the External Scientific Advisory Committee (ESAC) present, a 3 rd contributed to the report.

CARE 05, CERN, HIPPI 05 Programme - 1

CARE 05, CERN, HIPPI 05 Programme - 2

CARE 05, CERN, HIPPI 05 Programme - 3 Friday morning: -Dissemination planning. -Budget status. -CARE05, HIPPI06.

CARE 05, CERN, Highlights WP 2 – Normal Conducting Structures Investigation and comparison of 4 different types of NC structures: 2 standard: Drift Tube Linac (DTL) and Side Coupled Linac (SCL), 2 new:Cell-Coupled DTL (CCDTL) and CH-DTL. DTL design (here 3D RF simulation showing B-field distribution) developed by CERN, LPSC and CEA. Design of SCL cells (here thermal study by LPSC) jointly by LPSC and CERN. RF coupler for DTL structures, developed by CEA and LPSC for CERN DTL prototype. Design completed, will be built at LPSC.

CARE 05, CERN, WP2 Normal Conducting Concerns for WP2: delays from CERN workshops, difficulties in recruitment (LPSC). Engineering and prototyping of 2 novel accelerating structures: CCDTL pre-prototype finished at CERN, ready for power tests (left). Prototype design finished (right), will be built in Russia (agreement with ISTC). CH-DTL design completed (left, CH- DTL tanks with new end cells) and components for cold model built (press- fitted drift tubes, right).

CARE 05, CERN, Highlights WP 3 – Superconducting Structures Focused on SC cavities for pulsed mode operation in the range MHz RF & mechanical design of elliptical (CEA) and spoke cavities (FZJ). Mechanical behavior in pulsed mode (CEA, INFN, FZJ, IPNO,IAP-FU) Tuner design for elliptical (INFN, CEA) and CH (IAP) cavities. Coupler design for multigap spoke (IPNO) and elliptical (CEA) cavities. Tuning system for elliptical cavity (INFN). Stiffening rings for elliptical cavity (CEA, top) and for triple-spoke cavity (FZJ, bottom). Preparation of test stand in Saclay is progressing (klystron ordered, modulator in preparation).

CARE 05, CERN, Progress of the work : cavity tests Cool-down and 1 st test sc 700 MHz spoke FZ- Juelich March 2005 Cool-down and 1 st test sc 352 MHz spoke IPN- Orsay April 2005 Cool-down and 1 st test sc CH cavity Frankfurt University July 2005

CARE 05, CERN, WP 4 – Beam chopping Concerns: delays from CERN workshops, need revision to the schedule. CERN chopper assembled, ready for testing. Design of fast choppers (2 ns rise and fall time electrostatic kickers to prepare the beam for lossless injection into a ring) with appropriate drivers, dump and beam line. RAL chopper design. Driver components ordered and received, line redesigned. 3D cut of CERN dump (design finished, construction started). Beam dynamics design (envelopes) of CERN chopper line.

CARE 05, CERN, WP 5 – Beam dynamics Preparation of appropriate tools for the analysis of high-intensity linear accelerators: beam dynamics codes and detectors. Benchmarking of 7 codes (some old, some new, some updated) started, to be compared with measurements to be done at the UNILAC DTL linac at GSI (March and October 06). Progress in the understanding of beam neutralization phenomena. Different detectors developed at GSI, FZJ and CERN Beam Shape and Halo Monitor assembled and tested at CERN : provides high sensitivity and dynamic range of 10 6 to identify halo from main beam. (only deliverable in 2005).

CARE 05, CERN, ESAC Assessment 2 ESAC members present at Abingdon (J. Stovall, A. Pisent), 1 contributed via (Y. Yamazaki), ESAC report received on Nov. 16 th. 8 page document, quite complete analysis of all HIPPI activities, will be annexed to the HIPPI Annual Report. “The HIPPI activities represent the bulk of R&D activities addressing high-current linac technology under way worldwide.” “We find the work to be of high quality and are encouraged to see HIPPI being used as a vehicle for recruiting new members to the fraternity of accelerator designers. It is very encouraging to see that some of the funding has been directed towards facility improvements aimed at advancing the art.” “The committee is pleased to observe no reluctance among the participants to collaborate with their colleagues and in some cases to note strong inter-lab collaborations.” WP4: noticed “stronger collaboration” from last year, still to improve collaboration with WP5. WP2: “very pleased” for response to last year remarks on DTL, check post-couplers length and cost CCDTL. WP3: better synthesis of activities and collaboration with WP5. “The collaboration among members of this work package is very strong, with many examples of common design choices and common use of existing infrastructures and instrumentation. Such continued collaboration will assure optimum use of the high-power RF test stand presently under development.” WP5: stress importance of dynamics for ring injection, strengthen code benchmarking and coordination for detectors, test promising halo monitor. General comment: define a common set of HIPPI objectives, use to compare structures across WP’s.

CARE 05, CERN, Detailed planning and progress Progress up to end of September

CARE 05, CERN, Detailed planning and progress

CARE 05, CERN, Milestones and deliverables 2005