NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX.

Slides:



Advertisements
Similar presentations
Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29,
Advertisements

Vacuum Vessel Production Readiness Review
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
Superconducting Large Bore Sextupole for ILC
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 MME3360b Assignment 04 10% of final mark 6 problems, each worth 16.7% of assignment mark Due April 9 th, 2012.
June 12, 2003FDR Race Track Test Coil1 Final Design Review Racetrack Test Coil James H. Chrzanowski (PPPL) and Oak Ridge National Laboratory June 12, 2003.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Magnet for ARIES-CS Magnet protection Cooling of magnet structure L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting UCSD January.
Summary of Winding Pack Thermal Results K. Freudenberg
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
SCH Controls Readiness Review – Cold Mass Iain Dixon November 4, 2015.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX G. Gettelfinger for the NCSX Engineering Team November 10, 2004 NCSX Coil Test Facility Single Phase LN 2 Mechanical/Plumbing Final Design Review.
SCH Controls Readiness Review- Cryostat Nov 4-5, 2015 Kurt Cantrell.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Soumen Kar 1,2, Xiao-Fen Li 1, Venkat Selvamanickam 1, V. V. Rao 2 1 Department of Mechanical Engineering and Texas Center for Superconductivity University.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
1 Testing of Twisted Racetrack Coil B. Nelson TRC FDR 15 Oct 2004.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 17 th 2014.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
HNC/D Engineering Science
Instrumentation for status monitoring of SST-1 superconducting magnets
Installation of the T600 at Fermilab
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Update on PANDA solenoid design
MQXC Nb-Ti 120mm 120T/m 2m models
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
as a prototype for Super c-tau factory
Presentation transcript:

NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX

June 1,20062 C1 Operation Review Objective The objectives of this review are to consider: –Installation of the C1 in the CTF –Instrumentation and Data Acquisition –Test Plan

NCSX June 1,20063 Close Quarters The New Cryostat Mostly Fills The Test Enclosure

NCSX June 1,20064 ES&H Changes Magnetic field exposure for personnel is slightly higher for the C1 test. The barrier distance increases from 15 feet to 23 feet. The C1 cryostat is large enough to impede access to and egress from the test enclosure. Three access doors allow entrance to the enclosure with necessary procedure changes (RLM: von Halle). –May become classified as a Confined Space

NCSX June 1,20065 C1 Installation 304 stainless steel legs (SE )for strength –One leg fixed in X&Y, three on roller supports EM loads on baseplate for boil-off reservoir require tie- downs

NCSX June 1,20066 Coil Flow Diagram The C1 Coil Has Been Plumbed As 9 Separate Single-Phase Flow Paths and One Two-Phase Supply For The Lead Block Bleeds

NCSX June 1,20067 The Plumbing B-Plan Teflon tubing with Swagelok joints and custom backing inserts were not reliable –40 psig was the best pressure achieved –The previous style of insulating G-10 pipe nipples will be used in the plumbing

NCSX June 1,20068 Bus Conductor 500 MCM Welding Cable Insulated with Teflon FEP Shrink Tubing Has Successfully Been Tested to 58 kV

NCSX June 1,20069 Bus Bracing A Robust Support Has Been Fabricated To Both Partially Relieve The Leads From Load And To React Bus- Bus Forces Clamping force of N/m or 65 lbf/in is required on close conductors D. Williamson has asserted that the coil leads are not particularly fragile

NCSX June 1, Lead Insulation Maximum voltage across coil is expected to be approximately 499 volts –The G11CR lead sleeves designed and machined for the production coils are being used for this test set-up

NCSX June 1,200611

NCSX June 1,200612

NCSX June 1,200613

NCSX June 1,200614

NCSX June 1,200615

NCSX June 1,200616

NCSX June 1,200617

NCSX June 1, Test Objectives Main purpose – calibrate FE models with actual data –Improves confidence with which models can be used for future what-if inquiries. Secondary purpose – assess cooldown/recovery performance from ambient temperature and after pulses

NCSX June 1, Dimensional/Deflection Measurements 3 measurement approaches –Extensive strain gauge array –Mechanical displacement measurement –Manual measurement of total width of both winding packs before and after

NCSX June 1, Strain Gauge Locations 15 of K. Freudenberg’s 20 requested locations are instrumented

NCSX June 1, Mechanical Measurement Box Dimensions are 94” X 116.5” ID with wall thickness of 6” Three tubes needed foot outer tube ss tube,.875 OD,.675” ID. (purchased) 2.8 inch ss tube (box entrance).75” OD,.6875” ID 3.10 foot inner ss tube ¼ diameter Three angles needed (2” X 3”) (.1875 thick). These may be from local boat supply store. (Tentatively purchased two anchors.)

NCSX June 1, Thermal Measurements Extensive strain gauge and t/c data collection system V/I resistance inference –This is a key feature as it is prototypical of the first-plasma machine protection scheme –ADMINISTRATIVE control of coil temperature through resistance value (wait for next pulse until cool)

NCSX June 1, Temperature Differentials Fiberglass convection insulation will be installed on coil with fiberglass rope Only outer aspect of coil will be exposed to cooling Two T/C’s will be installed near the winding packs on coolant tubes. The resulting temperatures will be used to monitor the deltaT between the windings and the MCWF. A 50C difference has been recommended.

NCSX June 1, Test Sequence –Lift the both ends of the cable bus assembly and megger pole-pole to 3 kV –Restore the bus at the coil end and megger the warm coil to ground to 7.5 kV –Completely restore the bus and measure the warm circuit resistance from the rectifier room –Collect winding pack width data prior to cool-down –Cool the coil to ~80K with proper data collection

NCSX June 1, Test Sequence (cont.) –Measure the cold circuit resistance from the rectifier room –Perform basic shot sequence with T/C, strain archival and V/I cooldown checks –Warm up to install mechanical measurement rig –5 kA room temperature pulse for K.F. –Cool down, repeat shot sequence, collect previous data plus displacements –Warm up facility –Measure final winding pack dimensions

NCSX June 1, Current Waveforms for Test The 2T Scenario from the Rev. 4 GRD offers 36.5 kA with an I**2t of 1.15e9 a**2sec.

NCSX June 1, Protective Circuitry Protective Settings –Maximum “On” time – 2.3 seconds - no change from TRC –Tau (thermal) – 200 seconds – no change –Minimum cycle time – 900 seconds – no change –I**2t max – 1.6e9 a**2sec – no change –Imax – 38.5 kA up from 33 kA

NCSX June 1,200628