CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Interior Wall and Ceiling Finish
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Pipe Supports and Hangers
Commercial Framing C D Prints Unit 13.
Team Uno 11/11/04 Bunker Curnes Product Assembly.
Click on this image to open the full PDF document.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Design of Tension Members
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
Design of Tension Members
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Chapter -9 WEB STIFFENERS.
Chapter 7 Metals.
TRAMEC HEAVY DUTY AIR BRAKE HOSE ASSEMBLIES Meets DOT 106 & SAE J1402
Shear - Tensile - Compression Stresses Slip Ted 126 Spring 2007.
Anatomy of a Cabinet. Pick a cabinet now! A) A freestanding display space B) A counter section no longer than 48” (you may “cut” a counter to do this)
CTC / MTC 222 Strength of Materials
THE CONCEPT OF LIGHT GAUGE STEEL CONSTRUCTION
Strength of Material Shear Strain Dr. Attaullah Shah.
 What is joinery? In our case – we will be looking at the fastening or combining of two or more boards together when building our projects.  It is important.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
BEAMS AND COLUMNS.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Reading Structural Drawings
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Basic Structural Theory. BASIC STRUCTURAL THEORY TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 Beams Different member types.
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
Extra Examples.
1 HVACR116 – Trade Skills Structural Drawings. 2.
J.Byrne Block Joint : Hard plastic Surface fitting, side to end Modesty Block : Hard plastic. Surface fitting, side to end Bolt & Cam : Metal.
Moment Connection Requires Bolts Outside the Flanges
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
WORKSHEET 6 TRUSSES. Q1 When would we use a truss? (a) long spans, loads not too heavy (b) when want to save weight (d) when want light appearance (c)
Fasteners and Thread Repair
Teaching Modules for Steel Instruction TENSION MEMBER Design
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Flange Plates to be Welded to Beam Flanges.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Shear Stresses in Concrete Beams
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Forklift pick set-up interfacing with a MCHP
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Woodworking Joints. Joinery Joinery is the part of Woodworking that involves joining pieces of wood together Some require fasteners, adhesives.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Installation Walkthrough Image Guide
FASTENERS AND THREAD REPAIR
Flat slab Structures VI.
Automotive Engines Theory and Servicing
Remaining lectures Last lecture by Dr. Darpe: Wed, 3rd Oct
CPA Moment on the left is ~100*150kg/2.
Chapter-2 Parts of Steel Bridges.
TPC Support and Constraint TPC Support
Chapter 1 Stress and Strain.
LST Module Installation
G.B.N GOVT. POLYTECHNIC, NILOKHERI
Design Ribbed and Flat Slabs
Drawing of stud.
Activity 4.2.8d Satellite Flight Path Construction Guide
THE CONCEPT OF LIGHT GAUGE STEEL CONSTRUCTION
DucoSlide Luxframe F Fitting instructions L.H. R.H.
Chapter Objectives Determine shear stress in a prismatic beam
THE CONCEPT OF LIGHT GAUGE STEEL CONSTRUCTION
Automotive Engines Theory and Servicing
Presentation transcript:

CPA Micarta Based Rahul Sharma / Bill Sands

The present design shown in this document is based on the use of Micarta as the base material this will likely change the design will work with G-10 or other materials with minor changes due to material strengths.

24 Panel 3 section Micarta CPA Weight ~ 1400 lbs. 12 parallel plate sections

CPA Overall Dimensions

Main Hanger G-10 6 Pcs. Required

Main Hanger Dimensions

Main hanger internal stainless steel reinforcement

Tubes are fitted inside one and other and fastened with FH screws the horizontal tubes have stainless steel reinforcement tubes at the joints as they are subjected to loading

Each vertical section consists of 2 tubes and 3 stainless steel hangers to support a column of 4 parallel plate sections

Parallel plates are connected to 3” wide strips with tapped holes to connect the panels

Example of a 2 plane middle section weight ~100 lbs.

Center joint connecting middle section to the end sections

Center joint has the vertical connector dropped in after the tube is slide as do the other vertical joints this joint also brings HV from one section to the other

½” tapped pins connect the vertical sections

Shear pin connection pin and oversized head screws

Cryo testing of the Micarta and G-10 demonstrate that the tensile strengths in both materials do rather well in a cryo state

Stainless steel elbow to vertical tube connection Horizontal tube to elbow connection with column pin connector

Swivel tee for HV connection

Slots cut into top and bottom panels to allow liquid argon flow between panels

Conclusion This document demonstrates that this is a viable design for construction of the CPA the design will likely need to be tweaked with a change in material.