© BMA Inc. 2009. All rights reserved. Decision Making.

Slides:



Advertisements
Similar presentations
Understanding Value Stream Decision Making
Advertisements

© BMA Inc All rights reserved. Lean decision making Box score.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
How to Talk to Accounting about Lean* Dave Turbide, CFPIM, CMfgE, CIRM, CSCP * Version 3.
Lean Manufacturing.
© BMA Inc All rights reserved. Value Stream Capacity Understanding Value Stream Decision Making.
Optimization problems using excel solver
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Supplier Development Kaizen Implementation Kit
JIT, TPS, and Lean Operations
Lean Factory Management (LFM). About Us… Lori McNeely Ultriva Customer Support Specialist 2 Ed Conrey Ultriva Application.
VALUE STREAM MAPPING Analysis of Material Transport.
Lean Operations (JIT) Module
Sources of Information for Manufacturing Facilities Design
Lean Operations (JIT) Module
1 IMA’s 92 nd Annual Conference © 2011 Institute of Management Accountants. All rights reserved. Making Accounting Relevant in Lean Environments Presenter:
Copyright © 2007 Prentice-Hall. All rights reserved 1 Activity-Based Costing and Other Cost Management Tools Chapter 24.
Summary: Review of Lean Principles
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
CONTINUOUS IMPROVEMENT PROGRAM
Value Stream Mapping.
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Reid Lifting - QuickScan Feedback Session Friday 11 July 2014.
Production Planning and Control Introduction
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
© OpStat Group Inc. All rights reserved. 1 A Lean Analysis Methodology Using.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
10-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Process Strategy The process by which a firm converts inputs into goods and services The purpose is to build a production process that meets customer.
Financial benefits of lean improvement
Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved GLOBAL SOURCING AND PROCUREMENT Chapter 11.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Value Analysis/ Flow Analysis
© BMA Inc All rights reserved. Understand why traditional accounting, control & measurement methods need to change as the company continues the.
Managing by value stream
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
© BMA Inc All rights reserved. Value stream costing Lean reporting & control.
Just-in-Time and Lean Systems
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
File G: Value Stream Cost Analysis Exercise Using Simplified File F Template.
© 2009 BMA Inc. All rights reserved.  Capacity analysis provides an overview of how effectively you use time in each cell.  The time is categorized.
Process Characteristics
Value Stream Mapping at NCS Presented to: Gunnison Date: 4/2/2014.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Lean Accounting for the Lean Enterprise 2-Day Workshop
Production and Operations Management: Manufacturing and Services
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
© BMA Inc All rights reserved. The Value Stream Managing by value stream.
© BMA Inc All rights reserved. Lean reporting & control Performance Measurements.
© BMA Inc All rights reserved. Financial benefits of lean improvement Lean planning.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Strategic Capacity Management
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Value Stream Mapping (VSM) Training
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
Luxfer Gas Cylinders – S&OP Process Improvement
Luxfer Gas Cylinders – S&OP Process Improvement
Presentation transcript:

© BMA Inc All rights reserved. Decision Making

© BMA Inc All rights reserved. Decision Making Methodology 1.Does this decision make sense operationally? –Use the Value Stream Performance Measures to evaluate the effect on the operational measures in the Box Score 2.Do we have the capacity or can we do it? –Value Stream Capacity Analysis Understand the flow of products through the Value Stream Use Value Stream Maps to populate the capacity analysis 3.What is the cash flow impact? –Value Stream costing What costs will actually be impacted?

© BMA Inc All rights reserved. Plant level consolidated value stream costing w/ inventory change We will be focusing on the OEM Value Stream to show the impact of improvements and various decisions within the value stream

© BMA Inc All rights reserved. OEM Value Stream Map SupplierCustomer Kanban Shipping S&OP Demand ForecastsPurchase Forecasts Order SupplierCustomer Shipping Assembly Welding 3,000 per Month Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Qty = 30,000 C/T = 70s Batch = 1500 Set Up = 10,800s Scrap = 10% Rework = 20% Downtime = 15% Inspection = 10% Insp Time = 120s # cells = 8 Crew Size = 4 # of people = 34 Shifts = 1 Qty = 15,000 C/T = 180s Batch = 600 Set Up = 1200s Scrap = 5% Rework = 10% Downtime = 5% Inspection=100% Insp Time = 30s # cells = 5 Crew Size = 1 # of people = 10 Shifts = 2 Qty = 3,000 C/T = 210s Batch = 20 Set Up = 600s Scrap = 0% Rework = 10% Downtime = 0% Inspection=100% Insp Time = 60s # cells = 2 Crew Size = 5 # of people = 10 Shifts = 1 Qty = 1,000 C/T = 120s Batch = 1 Set Up = 0s Scrap = 0% Rework = 2% Downtime = 0% Inspection=0% Insp Time = 0s # cells = 1 Crew Size = 1 # of people = 1 Shifts = 1 DATA BOXES

© BMA Inc All rights reserved. Value Stream Costing & Box Score Value Stream Performance Measures / Costing & Capacity feed the Box Score OEM BOX SCORE Current State Productivity Units per Person43 On-Time Shipment86% First Time Thru Quality70% Dock-to-Dock Days24.00 VS Average Cost Per Unit£ Machine Shop Capacity (constraint) Productive Capacity46% Non-Productive Capacity47% Available Capacity8% Material Costs£829,835 Conversion Costs£449,796 Total Costs£1,279,631 Overtime Costs£6,948 Inventory Days52 Value Stream Costing OEM Value Stream Materials £829,835 Direct Labor £219,468 Support Labor £87,662 Machines £88,800 Outside process £36,000 Facilities £15,450 Other Costs £2,416 TOTAL COST £1,279,631 Average Cost per Unit £427

© BMA Inc All rights reserved. Scenario: Should the company outsource production vs. improve the value stream? The OEM Value Stream is expecting to receive a 20% production rate increase within the next 2-3 months We have received a quote from a supplier for a group of sub-assemblies we currently produce in-house for £ per unit due to the Machine Shop constraint. We have a Future State Map with planned improvement projects that we have identified. Decision: –Compare the two options

© BMA Inc All rights reserved. Impact of 20% Production Rate Increase to the Machine Shop Current State Rate increase The constraint is overloaded with the projected rate increase

© BMA Inc All rights reserved. Compare the options - Capacity Outsource sub-assembly to handle 20% increase in production rate Outsource sub- assembly Current State Rate increase

© BMA Inc All rights reserved. Look to the Box Score 3 Dimensional view of the impact to the Value Stream OEM BOX SCORE Current State Productivity Units per Person43 On-Time Shipment86% First Time Thru Quality70% Dock-to-Dock Days24.00 VS Average Cost Per Unit£ Machine Shop Capacity (constraint) Productive Capacity46% Non-Productive Capacity47% Available Capacity8% Material Costs£829,835 Conversion Costs£449,796 Total Costs£1,279,631 Overtime Costs£6,948 Inventory Days52 Outsource rate increase 51 87% 67% £ % 48% 8% £1,087,883 £449,580 £1,537,463 £6,732 55

© BMA Inc All rights reserved. Using Value Stream Costing Current State Outsource sub- assembly Decisions using simple Value Stream Costing

© BMA Inc All rights reserved. Another Option: Improve the Value Stream We have calculated the impact to the OEM Value Stream of outsourcing the sub-assemblies Now we will look at the impact of our planned improvements so that we can compare the two options. Value Stream Mapping and Value Stream Performance Measures are key tools used to improve the Value Stream We will target non-productive activities to eliminate waste and generate capacity

© BMA Inc All rights reserved. Understanding the Benefits of Lean Improvement Planned improvement - Did we free-up enough capacity for the production rate increase?

© BMA Inc All rights reserved. Rate Increase after Continuous Improvement Continuous Improvement has generated enough capacity, but what about the Box Score? Kaizen results 20% Increase

© BMA Inc All rights reserved. Box Score - Decisions Using the Box Score to show the impact of lean improvements – What looks best? In-house with Improvements 20% Rate Increase 51 95% 80% £ % 29% 16% £995,802 £445,092 £1,440,894 £2, OEM BOX SCORE Current State Productivity Units per Person43 On-Time Shipment86% First Time Thru Quality70% Dock-to-Dock Days24.00 VS Average Cost Per Unit£ Machine Shop Capacity (constraint) Productive Capacity46% Non-Productive Capacity47% Available Capacity8% Material Costs£829,835 Conversion Costs£449,796 Total Costs£1,279,631 Overtime Costs£6,948 Inventory Days52 Outsource rate increase 51 87% 67% £ % 48% 8% £1,087,883 £449,580 £1,537,463 £6,732 55

© BMA Inc All rights reserved. Targeting More Improvement Value Stream performance measures drive continuous improvement.

© BMA Inc All rights reserved. Box Score showing results of improvement On-going improvement creates more capacity and frees-up people 20% Rate Increase 51 95% 80% £ % 29% 16% £995,802 £445,092 £1,440,894 £2, Continuous Improvement 53 99% 90% 8.00 £ % 16% 26% £984,302 £435,120 £1,419,422 £0 37

© BMA Inc All rights reserved. New Value Stream Capacity Improvements free up 2 people from Machine Shop. 1 person added to Welding

© BMA Inc All rights reserved. Scenario: Should the company insource production that was previously outsourced? Assuming we have the capabilities, now we need to know if we have the capacity We are considering bringing an outside process in-house due to the capacity we have generated in the Machine Shop There are 394 units per month that go for outside processing and the cost is £91.38 / pc. The machine shop has the capacity to handle this increase. Calculate the impact to the Value Stream if we bring this process in-house.

© BMA Inc All rights reserved. Box Score – Impact of Outside Process being brought in-house Current State Future State Outside Proc. / In-house 53 99% 90% 7.87 £ % 15% 26% £994,145 £399,120 £1,393,265 £0 37

© BMA Inc All rights reserved. Value Stream Costing showing Decision to bring in-house What are the costs that will change?

© BMA Inc All rights reserved. Scenario: Should the Value Stream transfer work from Value Stream to Final Assembly? It has been determined that one of the sub-assemblies could be welded directly in Final assembly during installation. This will lead to better quality and less rework Final Assembly is part of the Systems Value Stream

© BMA Inc All rights reserved. Work Transfer to another Value Stream OEM Current State Capacity

© BMA Inc All rights reserved. Two OEM processes to be impacted Production rate was reduced by work transfer from the OEM Value Stream –Welding & Assembly each freed-up 1 employee to be part of the Final Assembly cell in the Systems Value Stream

© BMA Inc All rights reserved. Work Transfer Impact Box Scores / Decisions Current State 51 95% 80% £ % 29% 16% £995,802 £445,092 £1,440,894 £2, Work Transfer 53 95% 80% £ % 29% 16% £895,802 £426,624 £1,322,426 £2,244 49

© BMA Inc All rights reserved. Overall Work Transfer Effect Costs that actually were affected in the OEM Value Stream –2 employees –2 machines Value Stream Costing OEM Value Stream ChangeFuture State # of units 3,600 Materials £995,802(£100,000)£895,802 Conversion Costs £445,092(£18,468)£426,624 TOTAL COST £1,440,894(£118,468)£1,322,426 Average Cost per Unit £400.25£367.34

© BMA Inc All rights reserved. Overall Work Transfer Effect Before and after – no overall cost impact – budget only

© BMA Inc All rights reserved. What have we learned? You must understand the production quantity that can be achieved at each step in the value stream or production process. You must understand the one or two production steps (cells, machines, or work centers) that constrain the flow through the value stream or business unit. To understand the impact of planned changes, you must analyze the impact on flow. Where do you find this? On the Value Stream map.

© BMA Inc All rights reserved. What have we learned? Making the best decisions demands the best possible analysis of value stream Use the value stream maps as your source.