1 Asset Disposal Project Rebuild Proposal For Mobile Equipment.

Slides:



Advertisements
Similar presentations
RECORD KEEPING Cooperative Development of Operational
Advertisements

ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
OCEAN 360 LIMITED COMPANY OVERVIEW. Today – Key success factor in growing full service business depends on our ability to source and supply new and/or.
Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
OPEX Savings Utilizing Filtek Technology. Agenda 01 Introduction: What does Filtek Offer? 02 Why Service the Generator every 250 hours? 03 What is Filtek.
Rebuilding process for the Box Type Induction Furnace.
00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND.
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
Alistair Murdoch Key Account Manager Finning UK Ltd.
1 WET BRAKES AND FINAL DRIVES THE BRAKECORE REBUILD PROCESS.
Automotive Remanufacturing Towards Sustainable Mobility…
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
DATE: 28/11/2012 INSTRUCTOR: HANIF ULLAH Tutorial 7.
BUILD WITH US. ™ Contractors
i-phi Combustion Enhancement Device Significantly Reduce Harmful Emissions Save 5% to 20% on your Fuel Bill Reduce Maintenance Your Costs.
ETF Haulage Trucks Agadir, May, 2013 Advanced Maintenance Systems.
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
The Maintenance and Engineering Organization
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
EWEC Athens Opportunities in Outsourcing O&M 01 March 2006.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
From Research Prototype to Production
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Remanufactured Engines An Economical Solution. Lift Truck Operating Applications l Light Duty - clean environment, short runs, improved level surfaces.
W. e. t INTERSERVE PRESENTATION 22/01/2015 Company Overview.
Agenda PartStock Company Overview Service Model Value Added Services Lifecycle Management Products Why Choose PartStock?
Presentation on Preventive Maintenance
The EnergyMizer Power Reduction & Conditioning System ®
Aviation Maintenance Management
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
Life cycle services for automation products
Key learning from recent service strikes Planning for future works; Designated team (group) to visit / assess each location prior to commencement of works.
Public Hearing to Consider Proposed Amendments to Transport Refrigeration Unit (TRU) Airborne Toxic Control Measure (ATCM) Sacramento, California Sacramento,
Repair and Overhaul (R&O) Component Value Engineering Trust in All Transactions Commercial Aircraft Aftermarket Consultancy.
HEAVY EQUIPMENT MAINTENANCE SOLUTIONS (HEMS) Ltd Website: Blog: Contact: Website:
The Smart Network: NRW, Pressure and Asset Management
Software Quality assurance SQA – SWE 333
WELCOME NORTH HARBOUR 2015 Annual Meeting. Today’s Agenda Notice of Attendance Proof of Notice of Meeting Police Report Financial Report a year.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Proven systems for managing asset integrity & reliability by implementing effective Ex maintenance and inspection strategies Streamlining the ATEX inspection.
Aircraft Fleet Management Solutions
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
It’s…….
TABLE OF CONTENT INTRODUCTION OVERHAUL PROCESS DOCUMENT REQUIRED
LubeWatch® Oil Analysis Program
Corporate Presentation
ME Spring 2015 Systems Engineering, Part II
Fans & Heaters technical seminar
Subsea 100 Global Services Products Presentation
Regional Sales Manager
Across the entire value chain
Regional Sales Manager
Work Order & Mobile Devices
Automotive Remanufacturing
Regional Sales Manager
Operating and Maintenance Contracts Breakout Session
Aftermarket Parts and Services
Compressed Natural Gas Supply Vehicles
Regional Sales Manager
HELLO Today we want you to give us the opportunity to be your strategic provider.
ISO 9001:2000 Management System Overview
Company X ISO9001:2000 Implementation Databases
Regional Sales Manager
Regional Sales Manager
Butler County engineers Office
Regional Sales Manager
Regional Sales Manager
Preventive Maintenance Service Agreement
Presentation transcript:

1 Asset Disposal Project Rebuild Proposal For Mobile Equipment

2 Truck Regeneration BEFORE … AFTER……

3 Rebuild Programme Rebuild Proposal for Mobile Equipment - Selection of Machines identified for Rebuild Programme - Proposal from OEMS ie., Sandvik and Atlas Copco - Rebuild in Ireland prior to shipping

4 Machines identified for Rebuild OEM Machine NumberMachine ModelMachine TypeSerial Number Rebuild Cost Vs New Cost Machine Value Vs New Machine Sandvik292Toro 50DDump TruckT %54%

5 Truck Rebuild Example Toro 50D Truck Typical cost to rebuild is from 45% to 60% of comparable new unit Timeframe for delivery is also significantly less than typical new unit delivery time Leadtime on Rebuild 10/14 Weeks Depending on Rebuild/Repair Spec Leadtime on New Machines – 27/32 Weeks depending on unit type Typical reduction up to 30% of cost per hour to operate and maintain following return to production after completion of rebuild programme.

6 EXAMPLE OF REBUILD Truck Regeneration - Toro 50D Truck Frame Structure Strip, Sandblast, Structural Inspection, Repair and Paint Cabin Strip, Sandblast, Re-upholster, Electrical Inspection, Repair and Paint Engine Reconditioned by engine OEM specialist Powertrain and Driveline Components All components inspected and reconditioned to OEM specification Hydraulics All piping and hosing replaced and all valves repaired/replaced Electrics All electrics built and tested to OEM specification Quality Control and Testing Machine completed to OEM production unit standard test procedures

7 Key Benefits KEY BENEFITS Allows customer to retain proven technology with option to upgrade Improved machine availability equating to lower cost per tonne Economical second life repair Keeps equipment in the field longer ADDED VALUE (Examples) Safety Rails Emission Solutions – DPF Filter Reverse Cameras Warranty Customer specific modifications Compliance with updated legislative requirements All OEM safety updates installed

8 Rebuild Programme Cost Saving to Operations **Rebuilt Machine for 45% - 60% cost of New** Detailed Audit Inspection Disassembly down to bare chassis Full recondition of major components Performance Testing Full Repaint Weekly inspection by Lisheen Personnel Specialised Tooling Fabrication ISO 9001:2008 Quality Assurance Record Warranty assured on delivery Shipping organised with Operation Commercial agreement direction between buyer and OEM Weekly Progress Reports and Photographic Progress Log