William Roseberry Matthew Haines Taylor Badonsky Joe Aquila.

Slides:



Advertisements
Similar presentations
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Advertisements

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
============================================================== D SAHIL I NDUSTRIES GROUP -- Innovation -- Integration -- Sponsored……
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Chapter 3 - Product Design & Process Selection
Global Manufacturing and Materials Management
Class 6: Chapter 4 : Product/Process Innovation
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Supply Chain Management
How to Grow Revenues Through Supply Chain Relationship Management Bill Burke President, CEO ePlains, Inc.
IE 412: Industrial Facilities Design Prerequisites: Work Study and Methods Engineering, Production Planning and Control Objective: To enable the students.
Competitive advantage  Products with a competitive advantage have more price or value benefits than competitive products  A value relationship is the.
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
Supply Chain Management AG BM 460. Introduction Hanover Foods – 95% of output is produced under contract Contract w/ store or industrial customer or food.
Chapter 19 OPERATIONS AND VALUE CHAIN MANAGEMENT © 2003 Pearson Education Canada Inc.19.1.
ISO 9000 Implementation Imran Hussain.
Billy Brown, Bridget Lawson, Dev Shah, Jason Smeak, and Craig Taylor
SUPPLIER PARTNERSHIP An organization (or customer) purchases its requirements, raw materials, components, and services, from supplier.   Better supplier’s.
Supply Chain Management COSC643 E-Commerce Supply Chain Management Sungchul Hong.
Supply Chain Management
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
Supply Chain Management
©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield.
SCMN/Relationships Text: Supply Chain Management
operational-level system. management-level system.
Chapter 11 Production and Operations Management Learning Goals
Chapter 1 Copyright ©2012 by Cengage Learning Inc. All rights reserved 1 1 Lamb, Hair, McDaniel CHAPTER 2 Strategic Planning for Competitive Advantage.
Industrial Engineering Roles In Industry
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
Ron Harbour President Harbour Consulting. Flexible Manufacturing.
Supply Chain Management: From Vision to Implementation Chapter 4: New Product Development Process: Managing the Idea Infrastructure.
Global Automotive Tooling Trends Laurie Harbour, President and CEO Harbour Results Inc. November 22, 2011.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Introduction and Implementation of Total Quality Management (TQM)
ADTRAN: The Network Access Company. 2 Telecommunications u Multi-billion dollar industry u Voice and digital data transmission u Carrier and End User.
Supply Chain Doctors SCM Fundamentals Introduction Planning Sourcing Making Warehousing Transporting Sharpening the Saw.
Supply Chain Performance COSC 643 Sungchul Hong. Competitive and Supply Chain Strategies A company’s competitive strategy defines the set of customer.
CHAPTER 2 Supply Chain Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 2-2 Supply Chain Management.
Chapter 14 Global Production, Outsourcing and Logistics 1.
J.Kulp. 3/06 Why Outsource? A summary discussion of why companies decide to outsource. Simply stated, the decision to outsource is made to positively effect.
Procurement Management & Managing Relationships with Suppliers
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
Operations and Supply Chain Strategies. Chapter 2, Slide 2 ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth.
Intelligent Supply Chain Management Strategic Supply Chain Management
Stakeholders Definition of stakeholders Theoretical model: 1.
Ivana Tong ◊ Sid Shekhar ◊ Matt Tomlinson ◊ Haswiny Deva
Management Information Systems Islamia University of Bahawalpur Delivered by: Tasawar Javed Lecture 3b.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Chapter 13 Extending the Organization Along the Supply Chain © Toh Kheng Ho/Age Fotostock America, Inc.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Business Intelligence Energy, Resources and Utilities.
BUSINESS INFORMATION SYSTEMS
ERP vendor perspective
Purchasing Decisions And Business Strategy
Using ERP to Streamline and Enhance Your Organization
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 3 Supply Chain Drivers and Obstacles
Schlenker, H. , R. Kluge, and J. Koehl
Chapter 9 ERP & Supply Chains
Procurement’s Impact on Logistics.
Supply Chain Management (SCM) Sourcing
Chapter 14 Sourcing Decisions in a Supply Chain
Chapter 3 Supply Chain Drivers and Metrics
ADTRAN: The Network Access Company
A Process View of the Supply Chain
Chapter 3 Supply Chain Drivers and Obstacles
Production and Operations Management
Presentation transcript:

William Roseberry Matthew Haines Taylor Badonsky Joe Aquila

  Native Name: トヨタ自動車株式会社  Founded: 1937  Headquarters:Toyota, Aichi, Japan  Area:International  Products:Automobiles, engines, motorcycles  Services:Banking, financing, leasing  Revenue:$18.58 trillion  Profit:$ billion  Divisions:Lexus & Scion Toyota Company Background

  The Working Relations Index (WRI) ranks the Original Equipment Manufacturer (OEM) based on 17 Criteria:  Supplier trust of the OEM  Open and honest communication  Timely information  Degree of help to decrease costs  Extent of late engineering changes  Early involvement in the product development process  Flexibility to recover from canceled or delayed engineering programs Measured Performance Differences for Toyota and Suppliers

  The scores are high for Toyota, Honda, & Nissan  They have priorities for quality versus cost focus  The scores are poor for Chrysler, Ford, & GM  They have priorities for cost versus quality focus Measured Performance Differences for Toyota and Suppliers

  Key feature of selling strategy is to build in schemes that prevent unilateral (one-sided) actions to change volumes or commitments.  Toyota strives to reduce variability to ensure stable operations by systematic mix planning, careful sales and operations planning, and sensitivity to the impact of product changes throughout the supply chain.  Toyota must collaborate with suppliers to create value for customers.  Suppliers attain productivity improvements to a level that makes the supply chain competitive.  Toyota suppliers must be flexible so they can respond to daily order changes. Links to Toyota’s Processes

  Choosing a supplier is a long, drawn-out process that involves verifying whether the supplier will mesh with the supply network.  Both new and existing suppliers are expected to share their innovations with other suppliers that supply similar products.  The goal of the supplier is to maintain delivery performance, high quality, productivity improvements, and so one, over the life of the model. Choosing Suppliers

  Asanuma studied the Japanese industry and found key features in managing suppliers included independent but closely linked suppliers, long-term relationships, frequent collaboration, exchange of employees between companies over long periods, and cross-linked shareholding.  Published reports show that Japanese auto suppliers won renewal of their contracts 90 percent of the time versus 71 percent for suppliers to U.S. auto OEMs. Choosing Suppliers

  Toyota opened up a plant in England in  Toyota started with a list of 2,000 initial suppliers.  They evaluated using criteria such as “assessment of management attitudes, production facilities, quality levels, and research-and-development capability.”  They ended their list with a total of 150 suppliers using this criteria. Toyota Supplier Selection

  Auto OEMs, suppliers are organized into tiers, with tier 1 suppliers being assemblers of systems, who manage all relationships with tier 2 suppliers, and so on.  The bottom of the pyramid consists of tier 4 suppliers who form, perhaps, about 40,000 entrepreneurs who own a lot of the intellectual capital that is required to produce excellent components.  Working with these lower-tier suppliers was the key to making the necessary changes in a timely and efficient manner.  Toyota chooses suppliers across multiple tiers so as to guarantee availability of innovative solutions across the supply chain. Tiered Supplier Organization and Managing Relationships

  The pressure on a supplier is maintained by using a staggered system of model changes, which in turn entails a staggered system of negotiations.  The usual price commitment by Toyota to a supplier is for a one-year period, and prices are reviewed every six months, but the contract award is kept in place over the model life. Pressure on Suppliers to Perform

 Depth to Supplier Relations  Drawings from manufacturer to supplier are handled in various ways:  Drawings detail manufacturing product  Supplier designs manufacturing process  Manufacturer learns details about manufacturing process.  Specifications are given to supplier and they design the process.

 Monitoring Suppliers  Japanese manufacturers keep detailed data about supplier process.  Require information on raw materials and delivery times.  Manufacturer absorbs some of risk of supplier to better control process.

 Success to Supplier Relationships  Collaborative tools that have common standards all compatible.  Trust and share of intellectual property.  Modular views of processes and planning serving consumer needs.  Teams specified to solve problems.

  Construction of Cost Competitiveness in the 21 st Century  The CCC21 initiative focused on cutting the purchasing cost of 170 major components. The CCC21 System

  The Comprehensive Assessment Tool rates the supplier of a scale of 0 to 5 on a set of specific performance measures:  Mission  Reporting structure  Involvement of top management  Localization and self-reliance  Open mind to operation procedures  Organization with respect to Toyota interactions Toyota Checklist for Supplier Audits

  “ Variety of components produced by suppliers is consistent with their flexibility.”  “ Velocity of the parts flow is matched between the assembly line and suppliers … In short, the supplier velocity is matched to the assembly plant production rate.”  “Variability of orders to suppliers is stabilized through communication through planned volumes in advance.”  “Visibility of supplier operations and of Toyota plants is encouraged by the approach at Toyota to discuss problems first.” v4L Approach in Managing Suppliers at Toyota

  Implementing an ERP system for Toyota will streamline data in collaboration with suppliers more efficiently.  Currently, Toyota already utilizes SAP and Oracle depending on what region they’re in.  Australia uses Oracle.  Parts of North America uses SAP.  Toyota keeps all IT in house for enterprise architecture. ERP with Toyota Supply Chains