Eugene Water & Electric Board. Dave Churchman Manager, Power Operations Eugene Water & Electric Board.

Slides:



Advertisements
Similar presentations
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Energy and Telecommunications Interim Committee January 29, 2004.
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
Eugene Water & Electric Board 2014 Annual Conference Making Risk-based Decisions for Hydro Infrastructure February 19, 2014 Roger M. Kline – Generation.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Informations about Brazilian Auctions Reserve Energy Auction – LER 2013 Date of Occurrence : August 23th, 2013 Date for Supply: September /2015.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
Understanding Ontario’s Electricity System
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Energy Planning and Recent Regulatory Developments Northwest Energy Systems Symposium (NWESS) University of Washington February 22, 2008 Nicolas Garcia.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
1 Singapore Update Presented by Dave Carlson Chief Executive Officer 30 October.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
Wind Turbines: Power for a House or City *many slides from L. Sankar.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
Energy Production and Use in California Source: California Energy Commission
Introduction to Bonneville Power Administration
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Henwood Consulting What’s Up ? California Electric Generation Markets Gary L. Hunt Managing Director.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Operation and sizing of energy storage for wind power plants in a market system Magnus Korpås Norwegian University of Science and Technology (NTNU) Contents:
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
ERCOT supply curve; Implied heat rate 04; MMBtu/MWh Individually, TXU Power And TXU Energy Are Highly Exposed To Gas Prices… If Gas prices go… …price of.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
CIPCO Central Iowa Power Cooperative Iowa Industrial Energy Group April 9, 2013.
Tennessee Valley Authority John J. McCormick Sr. Vice President, River Operations and Renewables.
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
1 Public Power Looking to Participate in New Coal Generation Public power communities are very concerned about affordable electricity and –Coal is the.
Market Response to Winter Dupont Group Energy Summit New England Power Generators Association Carol J. Holahan, Esq. October 5, 2015.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
2015 Mace Advocacy alliance policy conference
Background for Demand Response in PNW Pacific Northwest Demand Response Project May 2, 2007 Ken Corum.
Illinois Wholesale Market Update December 10, 2003.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
New Large Single Loads and Economic Development Considerations Draft Assessment.
Pre-decisional page 1 (for discussion only) Roy Fox, BPA Enterprise Risk Manager January 28, 2005 Fish Cost Components Workshop PBL Rate Case Risks and.
Vermont Power Supply September 30, 2005 Dave Lamont Vermont Department of Public Service.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Idaho Power 2017 Integrated Resource Plan
Evolving Economic Dispatch in SPP
Electricity Procurement Options
Overview of Northwest Wind Integration Action Plan
Renewable Energy. Sustainable Future.™
إدارة التسويق.
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Load-Resource Balance
Wholesale Electricity Costs
Manager, Supply Resource Planning
Presentation transcript:

Eugene Water & Electric Board

Dave Churchman Manager, Power Operations Eugene Water & Electric Board

EWEB Power Supply Mix Including BPA Source Resources 89,000 customers Peak Load: 479 mw (Jan 2012) Average Load: 280 mw 74% power purchased from BPA 22 % owned generation 4% power contracts Self scheduler embedded within BPA’s Balancing Area

EWEB’s Resource Portfolio EWEB Hydro Slice Hydro Nuke Wind Cogen/Bio

BPA Slice Product

EWEB Environment & Issues 1.Decline in Load 2.Decline in Wholesale Prices 3.Hydro Licensing / Aging Infrastructure Costs 4.Firm Transmission Access

Flat or Declining Loads Peak Load in December, 1998: 627 MW Peak Load in January 2012: 479 MW

Declining Wholesale Prices

Wholesale Prices and BPA Rates

Changing Risk Profile Price

Changing Risk Profile for EWEB with 100 MW surplus Retail Price $ $ Wholesale Price $ $ Annual Lost Revenue 100 mw surplus 1 mw of lost hydro generation $ (525,600) $ (262,800) 1 mw of reduced load $ (87,600) $ (525,600) $1 drop in price$ (876,000)

Hydro Relicensing & Aging Infrastructure Costs EWEB recently asked FERC for a stay of license issuance for its Carmen Smith hydro facility due to a concern that under current conditions that the project is no longer economically viable.

EWEB October Board Meeting Making decisions about how we are going to power our future require strategy. Whether EWEB should remain in the generation and trading business is not a simple topic. EWEB has been in the generation business for decades. Most of that history has been tremendously positive for EWEB customers in terms of economic benefit, diversity of supply and local control.

NW Market Redesign - CCED Maximizing the value of surplus energy and capacity value.

Firm Transmission Access EWEB Hydro Slice Hydro Nuclear Wind Cogen/Bio

What does the future hold?