EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Compressor status AWAKE Technical Board meeting 19 May 2015.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Compressor status AWAKE Technical Board meeting 19 August 2015.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
The Stripping Foil Test Stand in the Linac4 Transfer Line
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
UPDATE ON THE FORWARD PROTON DETECTOR Gilvan Alves Lafex/CBPF Introduction Accelerator Roman Pots Detector Future Plans April 1, 1998 (no kidding)
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Gennaro Ruggiero CERN, PH Depart. Planar Edgeless Detectors for the TOTEM Experiment On the behalf of the TOTEM Collaboration
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Roman Pots and Microstations based on talk by Jaak Lippmaa Helsinki CERN 2005.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Welcome to the mini-review of the Roman Pot mechanics for the ALFA project in ATLAS.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors - 25 January 2007 Beniamino Di Girolamo - CERN PH ATLAS Roman Pots status, commissioning.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
DT-LHCb coordination meeting 18 April 2016
The timing upgrade project of the TOTEM Roman Pot detectors
STRAW TRACKER SYSTEM CAD STATUS :
NA62 LAV Anti1 REMOVAL & TESTS
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Introduction Status before the 2009 run Results from the 2009 run
SciFi option for neutrino target tracker
GE alternative and outcome
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
Brainstorming on how to best proceed with LESS
Status of CMS-PPS timing detectors
Presentation transcript:

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 2 ATLAS Roman Pots location RP IP 240m RP Roman Pot Station { { Roman Pot Unit

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 3 ATLAS Roman Pot design  Strategy adopted for design oRoman Pot Unit design as TOTEM Modifications (as explained later) –Trying to minimize further even those oSpecialized ATLAS Pots Same technology as TOTEM Different shape –Suited to different detector technology adopted –Extrusions for overlap detectors  Time scale strategy (more in few slides) oMinimize interferences oCope with status of project (started later)

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 4 ATLAS specific  Only vertical Pots are adopted  Fewer Beam Position Monitors oOne each couple of Roman Pot Units (that is each Station)  Overall support adapted to specific location and beam height oDifferent base plate adapted to ATLAS support and height  Detector technology: fiber tracker oDifferent space usage in the Pot o“fan-out” space for fiber routing

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 5 TOTEM RP Unit TOTEM (courtesy M. Oriunno)

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 6 ATLAS specific modification on RP Unit Factorize out vertical station Adapt to correct height TOTEM (courtesy M. Oriunno) keep away

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 7 ATLAS specific: location and support  Separated BPM oOnly between the 2 RP Units  Best use of the space for the support  Height of beam in IR1 = 1110 mm as opposed to 950 mm for TOTEM

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 8 ATLAS specific: fiber tracker  Fiber tracker ou-v sets with relative staggering oConcept proved to be workable for preparing the modules oPreliminary test beam results look promising

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 9 ATLAS specific: fiber tracker Prototypes tested at DESY (test beam 2005)

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 10 ATLAS specific: overlap detectors

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 11 ATLAS specific: the Pot as a consequence We are optimizing this design: very preliminary pictures

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 12 Other issues under optimization: space for electronics Allow enough space to extract the bottom pot: Different constraints respect to TOTEM. As a consequence constraints on envelope for electronics

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 13 Status: interactions  Roman Pot Unit: design by TOTEM oFrequent synchronization with M. Oriunno to follow the evolutions  Interactions with TS oPostponed at the end of TOTEM needs oFirst contacts with TS Part-time availability of TS designer in January ‘ % availability from February ‘06

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 14 Status: pending points  Efficient use of the diameter of the Pot oMore surface for arranging photomultipliers Finalizing lateral dimensions for electronics  Vertical displacement of the pots oImposed envelop on electronics oInterplay between space needed for electronics and for easy routing of the fibers Competing requirements: finding the optimal for both

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 15 Schedule  December ‘05 - February ‘06 oFinalize remaining issues on pot specifications ATLAS internal reviews and discussions (next one in few days)  January ‘06 - March-April ‘06 oIn collaboration with TS Implement ATLAS specific changes to RP station Implement ATLAS pot design with extrusions and specific fan- out shape Possible prototype for proof of thin window processing in presence of extrusions  Fall ‘06 oTest beam at CERN: final fiber prototype (all channels, realistic Pot)

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 16 Schedule  3Q06-1Q07 oProduction If production done by the same supplier as TOTEM one: ATLAS production starting at the end of TOTEM production  Installation oDependent on: Readiness of the mechanics Readiness of the detector Availability for installation (ATLAS beginning or next shutdown)

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 17 Backup slides

ATLAS LUMI 15 February 2005 Luminosity and Forward Physics WG meeting - Update on fiber tracker: Layout and tests - A.Braem, C.Joram, A.Folley PH/DT2-ST Interface flange to MAPMT: leak test Test piece: 9 fibers glued (with BC-600 optical cement) in cylindrical holes through an aluminium / PMMA flange Single point diamond machining of fiber ends after gluing.  Helium test  Vacuum tight up to 2x10 -9 mbar l sec -1

EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT 19 Strategy  Basic plan oShort runs of few weeks We are confident to keep a good vacuum during that time  In case of longer runs or leaks oAccess to pump oMake the vacuum tightness at the photomultiplier interface level