GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Advertisements

Ray Lundquist, NASA GSFC
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
SDW2005, juin, Taormina The Corot Space instrument.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
GLAST Large Area Telescope:
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Cormac Neeson Space Engineering and Technology GERB Project Status 22/03/2004.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
Opto-Mechanics for SNAP at UM
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
19 th GIST Meeting 27 th –29 th August 2003 GERB mirror mechanism 1 GERB mirror mechanism, pointing and repeatability (Tech Note MSG-RAL-GE-TN-2011) B.C.Stewart.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Decay Solenoid – what do we have to do to make it work?
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
Dept. Physics & Astronomy Space Research Group Nick Nelms Space Research Group Dept. Physics & Astronomy University of Leicester UK GERB International.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
Monthly Status Review Wednesday, January 18, 2012 LPW/EUV Jim Westfall PM & Will Thompson SE Laboratory for Atmospheric and Space Physics University of.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
18th GIST 14 th -16 th May 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Descan mirror bearing life tests Battery issues Operations during eclipse.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
GLAST Large Area Telescope:
Status of the SWAP instrument
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
SWEA sensor FM model work remaining before delivery
Wide-Field Imager for Solar PRobe Plus (WISPR)
Double Star: Table of Contents
Double Star: Table of Contents
Dave McComas on behalf of the ISʘIS Team
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
PHI Status Report SO Cleanliness Working Group #24
San Diego Conference 2 August 2001
iSHELL Design Review Cryostat & Optics Bench
Integration, Test, and Verification
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
THERMAL CONTROL SYSTEM
Presentation transcript:

GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer

GERB 1 on MSG 2 Final activities in Kourou Application of conductive paint to the solar reflector tiles Conductivity requirement was not met, discovered on GERB-4

GERB-3 In storage at RAL Some updates to the IEU to be completed

GERB-4 Instrument Optical Unit (IOU) Fold Mirror and FM1 Detector integrated and aligned to Telescope Assembly Telescope boresight aligned to De-scan Mechanism Telescope boresight pointing relative to the alignment prism measured Telescope Cover Assembly & DSM Cover Assembly integrated Calmon assembly complete Front Panel assembled Heaters and temperatures sensors integrated and harness routed to external connectors MLI blankets fabricated QFM and DSM operated with IEU prior to integration into IOU IOU functional test with GERB-4 IEU expected this week.

GERB-4 Instrument Electronic Unit (IEU) & Inter-Unit Harness (IUH) Modifications to the Timing, Inductosyn and Vector Control 1 Boards now complete (to rectify the problem of variable timing between SOE and SOL pulses). All PCBs have been tested at board level All PCBs conformally coated and baked-out IEU completely assembled and checked at unit level IEU ready to start functional checks with the IOU IUH completed and baked out

GERB-4 Plans for next few weeks Complete functional testing of IEU and IOU Characterisation of Scan Mirror positions to viewing aperture, Black Body aperture, etc. Manufacture tapered shims Vibrate IEU Vibrate IOU Thermal vacuum test of complete instrument Electrical interface checks Delivery to Alcatel Space expected 17 th January 2006.