South Public Transport Corridor. North Public Transport Corridor.

Slides:



Advertisements
Similar presentations
FUTURE OUTLOOK Capitalising the gains from Athens 2004 Olympic Games for the competitiveness of Athens Metropolitan Area (AMA) in Post-Olympic era Based.
Advertisements

March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
DEVELOPERS PERSPECTIVE 5 th Annual Banking Summit Banking Association South Africa 31 October 2014, Empire Hotel, Sandton.
Neighbourhood Development Programme 31 October 2014.
DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
ECONOMIC DEVELOPMENT & JOB CREATION STRATEGY WORK NOV 27 PRESENTED BY DR. AJIV MAHARAJ.
SAVANNA CITY - Gauteng’s largest privately initiated development Background information to the Premier.
Interfacing Initiatives Hometown Collaboration Initiative (HCI)  Expansion of leadership and civic engagement to capitalize on innovative strategies 
Chance2Sustain Federal Ministry for Economic Cooperation & Development Bonn, 27 May, 2010 Cathy Sutherland, Dianne Scott and Glen Robbins.
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
A Masterplan for the Regeneration of Bradford-Shipley Canal Road Corridor.
Workshop on Transportation Corridor Evaluation With a focus on Economic and Community Development.
ANNUAL PERFORMANCE PLAN LOCAL ECONOMIC DEVELOPMENT UNIT PRESENTATION BY MS THUTHU NGCOBO DEPUTY PROGRAMME MANAGER: LED 30 APRIL 2013.
1 Alignment to the Local Government Turn Around Strategy (LGTAS)
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Way Forward EThekwini BEPP February Summary of key issues Institutional issues Dealing with Catalytic projects – focussed high level multi-disciplinary.
1 DEPARTMENT OF SOCIAL DEVELOPMENT PRESENTATION TO THE SELECT COMMITTEE ON FINANCE ON THE PROVINCIAL BUDGETS & EXPENDITURE REVIEW 14 NOVEMBER 2006.
HDA’s revised strategic direction and Annual Performance Plan 2013/14 March 2013.
A Sustainable Action Plan for TORONTO. Location & History Previous Planning Efforts Current Planning Efforts Growth Future Needs A New Plan for Toronto.
Application Summary The Tshwane Sustainable Human Settlement Strategy and Financing Plan Sub-Saharan Africa – South Africa Summary South Africa recently.
Evidence based employment scenarios & integrated development policies Presentation to UNDP Policy Dialogue on long term social protection for inclusive.
1. 2 VIA Long Range Plan  Vision for High-Capacity Transit across VIA service area by 2035  From extensive public and stakeholder input  Prioritization.
MINISTRY OF INFRASTRUCTURE / MINISTRY OF NORTHERN DEVELOPMENT, MINES AND FORESTRY 1 1 Growth Plan for Northern Ontario, 2011 Presentation to the Northwestern.
ETHEKWINI METRO BEPP REVIEW Day 1 of Mid-Year Budget & BEPP Review BEPP 2015/16 – 2017/18 26 February 2015.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Enter Presentation Name Public Works Transportation Division ACT Canada Sustainable Mobility Summit Hamilton, Ontario Transit Plenary November, 7, 2012.
McKinsey Global Institute (top 600 cities) has identified three critical factors why larger Cities have more advantageous conditions for economic success:
BUFFALO CITY METROPOLITAN MUNICIPALITY PRESENTATION TO THE NCOP SESSION 3: BUILDING THE CAPACITY OF LOCAL GOVERNMENT TO ACCELERATE SERVICE DELIVERY A City.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
ECONOMIC GROWTH & ENHANCED LOCAL PARTICIPATION THROUGH INFRASTRUCTURE DEVELOPMENT INTEGRATING INFRASTRUCTURE DELIVERY TOWARDS 2030 CJ Venter 05 October.
PROMOTING SOCIAL AND ECONOMIC INCLUSION OF INFORMAL SETTLEMENTS IN REMOTE AREAS THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY Presented by: Dumisa Dlamini.
TOWARDS THE CITY OF CAPE TOWN INTEGRATED SUSTAINABLE HUMAN SETTLEMENT WESTERN CAPE SUSTAINABLE DEVELOPMENT CONFERENCE: 21 JUNE 2005 DIRECTOR: HUMAN SETTLEMENTS:
Transport Authorities eThekwini Transport Authority Making a difference for sustainability Notes.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
1 Integrated development planning – a strategic tool for embedding sustainable practices in local government: the experiences of the eThekwini Municipality,
On the Right Track Meeting Greater Boston’s Transit and Land Use Challenges May 17, 2006.
Department of Labour Unemployment Insurance Fund Budget 2006/07 UIF Presentation to Portfolio Committee 13 March 2006.
Workgroup: Delivering and Accounting for Development Results
INFRASTRUCTURE CSIR 2015 CONFERENCE “IDEAS THAT WORK"
Devolution in Greater Manchester October 2015 Alex Gardiner, New Economy.
Working Together For A Secure and Prosperous Future. Implementing the NDP in KZN From NDP to MTSF to PGDP to DGDP to IDP FROM PLANNING TO IMPLEMENTATION.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
SWIFT NETWORKING MEETING: NEW EASTERN VILLAGES (NEV) 24th September 2015 Samantha Howell Strategic Allocations Planning Manager and NEV Programme Lead.
Presentation to Joint Budget Committee on: Urban Renewal and Rural development NATIONAL DEPARTMENT OF HOUSING.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
Tshepo Makhanye Information Section: Research Unit.
Department of Transport Joint Budget Committee Hearings Medium Term Budget Policy Statement 2005 Theme 3: Employment and Economic Development 1 November.
Why not a ‘Southern Powerhouse'? John Denham Chair of the Advisory Board
Introduction to the West Midlands Combined Authority West Midlands CVS Tuesday 12 April 2016 Dr Martin Reeves Chief Executive, Coventry City Council Chief.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
Successful places with homes and jobs A NATIONAL AGENCY WORKING LOCALLY Affordable Housing in Leicester, Leicestershire and Rutland Lindsey Richards Head.
Connecting Oxfordshire: Bus Partnership and the Oxford Transport Strategy 21 April 2016 John Disley Transport Policy & Strategy.
Financing Ekurhuleni Strategic Land Parcels
West of England Joint Transport Study
West Midlands Combined Authority: Seizing the Opportunity
Infrastructure Canada
SALGA Comments on LG Grants Division of Revenue Bill, 2011
What is the BEPP aiming to achieve?
Urban Settlements Development Grant 2nd and 3rd Quarter Exp of 2016
USDG Performance 2011/12 Proposal 2012/13 Parliament Portfolio Committee presentation 8 August 2012.
SH MIXED DEVELOPMENT WORKSHOP –DAY 1 SUMMARY
NATIONAL TREASURY INSTRUMENTS IN THE CONTEXT OF LAND REFORM 37TH SOUTHERN AFRICAN TRANSPORT CONFERENCE 09 JULY 2018.
BY THE ACTING MM – NEIL DIAMOND
SATC PRESENTATION ON TRANSPORT'S POSITION ON THE
Integrated Bilateral Agreement (IBA) 2018 to 2028
How effective are the NT Spatial Transformation Instruments?
Ekurhuleni, South Africa
POVERTY ALLEVIATION INTERVENTIONS
Presentation transcript:

South Public Transport Corridor

North Public Transport Corridor

2016 C C8 Roll-Out of IRPTN... Existing Movement Road Rail + Stations 2018 C C2 RAIL2022 C7 C C4 C C6 ULT.

Aligning Budgets to Integration Zones Zones: Categorisation of spaces and formulation of metropolitan integrated development programs for each type of space. Integrated programmes tailored to the different kinds of areas. 3 Zones proposed: –Dense Urban –Suburban –Non-Urban

Integration Zones Dense Urban Suburban Non Urban Three Integration Zones Integration Zones Dense Urban Suburban Non Urban Integration Zones Dense Urban Suburban Non Urban Dense Urban contains around 50% of population, bulk of economic activity Needs to be densified Big investments in mixed use type development & support infra Place to rapidly grow economy & serve maximum number of people

Planning Projects Status of Plans Approved Current Well aligned with Dense Urban IZ Focused on ToD, densification etc Moving into implementation

Integrating townships into the movement & economic system Revitalising township nodes & stimulating economic development Supporting transit-oriented development Urban Network Strategy (NDPG) Precincts / Nodes / Hubs Urban Network Elements Nodes Rail Connectors Secondary Connectors Activity Corridor

Town Centres Industrial Areas Tourism Nodes Township Nodes Rural Nodes Economic Programmes incl NDPG Well aligned with Dense Urban IZ where bulk of spend is occuring but also serving other areas Range of intervention types

Integration Zones Dense Urban Suburban Non Urban Economic Durban Investment Dashboard Predominantly private sector development proposals Mostly within close proximity to N2 and N3 eThekwini cannot afford to roll out new infra without carefully considering ROI and the efficient use of the infrastructure Need to resolve infra phasing plan Infra financing solutions required Developer contributions policy

Integration Zones Dense Urban Suburban Non Urban Housing All Current & Proposed Projects Project Type Greenfields In-Situ Upgrade Rural Bulk of informal settlements on edge of Dense Urban IZ- many of which to be formalised in-situ Most Greenfields sites also on edge of Dense Urban IZ. Northern projects well located to airport growth corridor Some well located greenfields- here densification is crucial Need for more densification projects in CBDs Critical that National brings in a densification subsidy & that we give more emphasis to social & rental housing

Housing Prioritisation Model: Proposed In Situ Upgrades & Rural Overlaid on Integration Zones Housing Project Priority Lowest Middle Highest Integration Zones Dense Urban Suburban Non-Urban Housing Project Priority Lowest Middle Highest

Housing Prioritisation Model: Proposed Greenfields Overlaid on Integration Zones Integration Zones Dense Urban Suburban Non-Urban Housing Project Priority Lowest Middle Highest

Integration Zones Dense Urban Suburban Non Urban Housing Identified Mega / Catalytic Projects All very well located and show the direction in which Human Settlement projects need to move (i.e mixed use/income, higher density) Typologies and funding models become critical Institutional issues around higher density lower income housing (body corporates etc) critical Good partnerships with private sector

Integration Zones Dense Urban Suburban Non Urban Economic, Housing Catalytic Projects & PT In or Near Implementation Nice spatial proximity between Housing and Economic projects Well positioned to PT trunks Good mix of development types which means we have revenue- absorbing and revenue-generating elements in the same project- makes for financial viability. The integration/alignment of dept programs & projects is key & the proper scheduling of funds on the Capital Budget will allow integrated implementation

Social Node Hierarchy Nodes are modeled in best locations to afford highest accessibility to catchments High Order facilities (high thresholds) must be located in metro or sub-metro nodes. High foot traffic supports public transport and economic development Guide facilities into clusters to better serve residents Co-ordinate municipal, provincial & state budgets Deal with Backlogs & New Growth Operational pressures

Existing Backlogs

Higher Order Backlogs

Higher Order Backlogs – North CBD

Higher Order Backlogs – South CBD

Project examples The BEPP promotes integrated planning, budgeting & implementation Project examples that reflect integrated planning, budgeting and implementation -Mnini MPCC -Mpumalanga -Cornubia -Etc Benefits: -Residents receive a better product -We look better in eyes of the public/electorate -Savings are achieved through higher utilisation levels -The private sector invests (increasing employment creation as well as rates revenue- which allows us to fund our social programme)

MNINI THUSONG CENTRE Craft & Trader Stalls LED Support Centre Community Hall Government Offices Sizakhala centre, home affairs, pension pay out, social welfare, SAPS, Post Office, labour, shared office space for: DED, DOT Transport, SEDA

Wastewater Masterplan 2012/13 Ultimate Wastewater Treatment Systems with Integration Zones showing Current Spare Treatment Capacity (Ml/day) in each System Integration Zones Dense Urban Suburban Non-Urban

Ecodev Projects: Layouts Priority Economic Developments 1. DTP & Surrounds North Watershed

Ecodev Projects: Outcomes Priority Economic Developments 1. DTP & Surrounds North (Trade Zone 2, Inyaninga Phase 1, Inyaninga Phase 2, uShukela) New Economic Development: 248ha Amounts per Year (Rm) 14/1515/1616/1717/1818/19 Anticipated Spend on Infrastructure: All Agencies Anticipated Spend on Infrastructure: eThekwini Only Currently on eThekwini MTEF Gap on MTEF Flags: Compensation Land / Effluent Discharge Licence

Ecodev Projects: Outcomes 5 Priority Economic Developments Development Summary Developable Area (ha) Cost of Bulks (Rm) Bulks Cost (Rm) / ha Anticipated Rates (Rm) / Annum eThekwini Shortfall on 15/16, 16/17 DTP North DTP South # Cornubia * Hammarsdale159421** # Excludes secondary road network (ETA to develop framework). *Also provides services for dwelling units. **Includes R140m WWTW expansion to service wider catchment.

R1.3bn anticipated rates return per year is fully realised over 20 years. Annual rates R68m per year (for 40ha development) Priority Economic Developments Likely “40ha per Year” Scenario with Rates Return Cumulative Rates if Ring-fenced Based on anticipated rates return per year of R68mill, we have R340mill pa capital to pay for infrastructure

Straw Dog: Roll-Out of Developments based on 40 ha per year (20ha Industrial / 20ha Commercial) Dube Trade Zone Precinct Hammarsdale – Old Industrial Hammarsdale – Keystone Inyaninga Phase 1 Cottonlands / Action Group Cornubia Business Hub N2 Business Estate Cornubia Town Center Marshall Dam Mixed Use uShukela Inyaninga Phase 2 DTP Support Zone 2 Industrial Projects Commercial Projects

Priority Economic Developments: Likely “40ha per Year” Scenario Gap Analysis

Synopsis of Catalytic Projects Big Bang, One-Offs, Big Impact at Sub-Metropolitan, Metropolitan, City-Region, Provincial, National or Continental Scales Mega-scale or Stimulate a chain of new projects or Be in highly strategic places Should be on PT corridors or national trade routes Land Uses – Economic, Mixed or Social Uses

Catalytic Projects by Project Cycle Implementation Preparation Note Implementation needs a different level of effort, intervention, and management structure from Preparation

Catalytic Projects in, near Implementation Bn Private Investments 35 Bn Public 140 Bn Total Investments 3 Bn Rates p.a. 205,000 Permanent Jobs 55,000 Homes, half via subisidies 9.50 Million sqm Lettable Floor Integration Zones Dense Urban Suburban Non Urban

Summary # 1 Catalytic Projects in, near Implementation 32

Summary # 2 Catalytic Projects in, near Implementation 33

Budget alignment with Catalytic Projects Table 2a: Catalytic Projects "In or Near Implementation" 2015/162016/172017/18 Back of Port Bridge City Intermodal Rail Corridor C2 - Bridge City to Umlazi Road Corridor C3 - Bridge City to Pinetown Centrum DTP & Surrounds Greater Cornubia Keystone Point Warwick King Edward Node0.0 Table 3 Northern Aqueduct Western Aqueduct

Catalytic Projects in Preparation Bn Private Investments 18 Bn Public 28 Bn Total Investments 36,000 Homes, mostly thru subisidies 1.07 Million sqm Lettable Floor Space Integration Zones Dense Urban Suburban Non Urban

What have we achieved on the BEPP? Set up Municipal Spatial Integration Forum Emergence of a single narrative Alignment of sectoral plans although lots of historical commitments etc Agreement on Integration Zones Agreement on Catalytic Projects that are ‘game changers’ as they are financially sustainable Dedicated resources for Catalytic Projects Partnerships emerging with the private sector Catalytic Projects introduced as a separate line item in Capital Budget Spatial budgeting being introduced Support at top management level & agreement that the BEPP be institutionalised in the CMs Office (under CSO) ICDG Planning projects will produce a pipeline of ‘good’ capital projects ICDG KPIs taking shape- the right mix of rationalised strategic KPIs More partners coming on board:realise the BEPP is a good vision

Challenges – Uncertain IGR Budgets JOINT IGR PLANNING & BUDGETING IS NOT YET WELL ESTABLISHED Affects Core Infrastructure such as Interchanges, Bridges, National and Provincial Roads within the Metro Critically Affects Economic Projects Significantly Affects Sustainable Human Settlements for the whole range of Social Facilities

Challenges – Key Environmental Approvals WATER USE LICENCES & CONVERSION FROM AGRIC Additional capacity needed in Treatment Works in order for development applications to be approved. Water Use Licences take too long to be issued by DWS- 300 days Coastal Discharge permits from DEA create further delays. New requirements of hydrological studies for WULAs and Dispersion studies for discharge permits are further complicating matters River Classification that doesn’t factor in the Cost of Infrastructure required to maintain River Classes is a real risk to eThekwini as Classes will be gazetted. Letter to DG. The conversion of agricultural land to other uses, mostly the case when it comes to development, is tightly controlled by Act 70 of 1970

BEPP 2015/16 - Review of built environment strategy Key shifts: -eThekwini needs to further improve the integration of the grants & their integrated spatial impact to achieve BEPP & SDF outcomes -eThekwini needs more emphasis given to spatial budgeting of its overall Capital Budget -Need to reflect Catalytic Project as dedicated items on our Capital Budget. -Support from DWS on fast tracking WULAs especially for catalytic projects -Agreement from DWS re: proposed process prior to gazetting of river classes -Support for densification & informal settlement upgrading from DoHS. We havent solved the dilemma of how to fund pro-poor multi-storey hsg. -Support from provincial DoT for road improvements on provincial network -Support from national & provincial social facility depts for implementing the outcomes of the DPSA study -Although have good partnerships on specific projects (eg THD, Toyota etc) we need to expand these to grow eThekwini

Questions