Munich, 30 September 2010 Road Infrastructure in Bulgaria
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Tendencies in the development of the world economy: Process of stabilization of the world commerce, growth in the business activity, in the production as well as the services sectors. Expectations for growth of the EU economy from 0.7% in 2010 to 2.4% in Expectations for weak economic growth of 0.5% during Tendencies in the development of the national economy: GDP growth from 3.6% in 2011 to 4.9% in 2013 Expectations for export growth from 5.9% in 2010 to 6.2% in Maintenance of inflation at a relatively low level around 3% until Recovery of the positive dynamics of the labor market. Unemployment % toward August 2010
Foreign investments direct flows, mln. Euro, 2004 – Ist half of 2010* Ist half of 2010* In general 2 735,93 152,16 221,69 051,86 685,93 281,9604,6 Construction 81,7171,6501,0815,1605,2208,898,5 *Forecast data of the Bulgarian National Bank
ФИНАСОВ РЕСУРС ПО СХЕМА BG161PO001/2.1-01/2007 Production of building companies of some European countries in June 2010 towards June 2009 According data from Eurostat
Production of the construction companies, 2004 – I half of 2010, mln. leva Ist half of 2009* Ist half of 2010* Comparative growth of the production in % 2005/ / / / /2008 Ist half of 2010*/Ist half of 2009* 42 %37 %41 %40 %- 38 %- 21 % *Forecast data of National Statistic Institution
Production of the construction and building enterprises Ist half of 2007 – Ist half of 2010* *Forecast data of the National Statistic Institution
Planned investments for programmes with financing by EU for the period : Operational Programme Transport (Indicative cost ): 990 mln. Euro Operational Programme Regional development 255 mln. Euro Other Road programmes – Budget Financing Programme for rehabilitation and reconstruction of bridges – 64 bridges, indicative cost 60 mln. Euro Road safety programme – 100 dangerous road crossings. Indicative cost 30 mln. Euro Road maintenance – new approach and contracts 60 to 100 mln. Euro per year EIB Transit Roads V – 200 mln. Euro per year World Bank – 80 mln. Euro until 2013
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Perspectives: Operational Programme Transport Programme period 2014 – Billion Euro Operational Programme Regional Development 2014 – Billion Euro Danube Strategy – “Connectivity” axis priority Other programmes financed by the state budget 1 Billion Euro
OPT – PROGRAMME PERIOD OPT – PROGRAMME PERIOD
1. Trakia MW (from Sofia to Burgas) 117 km Budget350 Mln. Euro/Contracted 250 mln. Euro 2. Mariza MW (from BG to TR) 67 km Budget 208 Mln. Euro 3. Struma MW (from BG to GR) 65 km Budget 250 Mln. Euro 4. Kardzhali – Podkova (from BG to GR) 28 km Budget 32 Mln. Euro 5. Hemus MW (from Sofia to Varna) 8,5 km Budget 32 Mln. Euro 6. Е-79, Vratsa – Botevgrad (north of Sofia) 31 km Budget 85 Mln. Euro 7. Е-79, Vidin – Montana (from RO to BG) 20 km Budget 32 Mln. Euro ∑ 990 Million Euro Projects in Operational Programme Transport
b Reserve Projects /Operational Programme Transport /: 1.“ Sofia – Kalotina” Motorway, Lot 1,2,3 50 km 150 Million Euro 2.Montana By-pass I-1 (E-79) 12,5 km 25 Million Euro 3.Vratsa By- pass I- 1 (E-79) 6,8 km 13 Million Euro 4.Gabrovo By-pass I-5 (E-85) 31 km 42 Million Euro 5.Ten-T Rehabilitation 50 Million Euro ∑ 1,3 Billion Euro
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Stara Zagora – Nova Zagora km Length – 31,800 km Costs : 70,5 Mio. Euro (2,2 Mio. Euro/km) Contractor : Magistrala Trace Joint Venture (BG) Start of construction: 09 June 2010 Construction time:25 months End of construction: June 2012 “ Trakia” Motorway, Lot 2
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Nova Zagora – Yambol km Length – 34,300 km Costs: 65 Mio. Euro (1,9 Mio. Euro/km) Contractor: Aktor (GR) Start of construction: 02 August 2010 Construction time: 25 months End of construction: August 2012 “Trakia” Motorway, Lot 3
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Yambol - Karnobat km Length – 49,080 km Costs: 107 Mio. Euro (2,1 Mio. Euro/km) Constructor: Trakia IV Joint Venture (BG) Start of construction: 03 September 2010 Construction time:28 months End of construction: December 2012 “Trakia” Motorway, Lot 4
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО -Lot 1 Orizovo – Dimitrovgrad (km ) = 31,6 km -Lot 2 Dimitrovgrad – Harmanli (km – ) = 34,411 km Tentative costs: 209 Mio. Euro (3,2 Mio. Euro/km); Announcement (for two Lots): October 2010; Start of construction: April/June 2011; Construction time: 26/25 months; End of construction: May/June km Length – 66,011 km Division in 2 Lots “Maritza” Motorway (connection Trakia MW – Turkish border)
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Announcement: Winter 2010/2011 Start of construction: Lot 1 - July 2011; Lot 4 – September 2011 Construction time: 23/22 months End of construction: May/June 2013 Lot 1 Dolna Dikania – Dupnitsa km = 16,78 km Lot 2 Dupnitsa - Blagoevrad km = 34 km Lot 4 Sandanski - Kulata km = 15 km Total length of Lot 1, Lot 2 and Lot 4: km. Tentative cost: 250 Mio.Euro Lot 3 (Blagoevgrad – Sandanski) will be constructed in the next programming period Design Lot 3 in year 2011 ; Tender procedures for construction and supervision of Lot 1 and Lot 4. Struma Motorway Corridor № IV, Sofia to Greek border
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО „Hemus” Motorway Section : „Sofia Ring Road – “Yana” road junction” km Tentative costs: 32 Mio. Euro Announcement: November 2010 Start of construction: May 2011 Construction time: 20 months End of construction: December 2012
1. “ Struma” Motorway Lot km 500 MillionEuro 2. “Hemus” Motorway 286 km Million Euro 3. “Cherno more” Motorway 100 km 350 Million Euro 4. “Sofia – Kalotina” Motorway 72 km 200 Million Euro 5. Express way “Sofia – Gyueshevo” 85 km 200 Million Euro 6. Express way “Ruse – Shumen ” 112 km 150 MillionEuro 7. Express way “Ruse – Veliko Tarnovo – Gabrovo”, 150 km 350 Million Euro incl. “Shipka tunnel – Stara Zagora 8. Express way “Rila” 80 km 200 Million Euro 9. Bridges on the Danube river – Silistra-Kalarash, Oryahovo-Beket 400 Million Euro 10. Express way E km 150 Million Euro ∑ 4 Billion Euro Operational Programme Transport
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО THANK YOU FOR YOUR ATTENTION!