The PH/ESE µTCA evaluation project a (short) status update Markus Joos CERN M. Joos, CERN13rd meeting of the xTCA IG.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

DOPPLER TROUBLE SHOOTING 2013 WEBINAR WEBINAR TECH SUPPORT.
1/1/ / faculty of Electrical Engineering eindhoven university of technology Managing complex designs Workshop on VLSI Design Using the Interactive Design.
LAPP IPMC Mezzanine HARDWARE & SOFTWARE
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Shelf Management & IPMI SRS related activities
AutoPLANT Piping - Tips and Tricks
Change Management Demo for IT 11/06/2013 Change Management, IT Meeting 11/06/
Topical Workshop on Electronics for Particle Physics Perugia 24/9/2013 Evaluation results of xTCA equipment for HEP experiments at CERN 1 Collaboration.
First test results with the Gigabit Link Interface Board (GLIB) Paschalis VICHOUDIS CERN PH-ESE-BE on behalf of the GLIB team (M. Barros Marin,
Update on the ATCA work going on at LAPP xTCA interest group - CERN 08/04/2013 Nicolas LETENDRE Alain Bazan, Fatih Bellachia, Sébastien Cap,Nicolas Dumont-Dayot,
xTCA at CERN an overview based on input from many kind colleagues
Legacy Remote I/O Upgrade to Ethernet
Sub- Nyquist Sampling System Hardware Implementation System Architecture Group – Shai & Yaron Data Transfer, System Integration and Debug Environment Part.
1 Software Testing (Part-II) Lecture Software Testing Software Testing is the process of finding the bugs in a software. It helps in Verifying and.
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
XTCA working group M. Hansen, CERN. xTCA Owned by PICMG (PCI Industrial Computer Manufacturers Group) ATCA (2002, 2007) – Advanced Telecommunications.
March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.
Software testing basic. Main contents  Why is testing necessary?  What is testing?  Test Design techniques  Test level  Test type  How to write.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
ΜTCA for physicists? A project of PH-ESE group to evaluate platforms for uTCA based systems at CERN and in the HEP community M. Joos, CERN on behalf of.
© UNT in partnership with TEA1 7 th Grade Career Exploration Module Career Focus: Computer Software Engineer Vocabulary.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Communication in ATCA-LLRF System Presenter:
Infrastructure design & implementation of MIPS processors for students lab based on Bluespec HDL Students: Danny Hofshi, Shai Shachrur Supervisor: Mony.
Software Maintenance Speaker: Jerry Gao Ph.D. San Jose State University URL: Sept., 2001.
1.  Team Members  Team Leader: Adam Jackson  Communication Coordinator: Nick Ryan  Bader Al-Sabah  David Feely  Richard Jones  Faculty Advisor.
XTCA Interest Group meeting Topical Workshop on Electronics for Particle Physics - Perugia 26/9/2013 Summary of evaluation results of xTCA equipment 1.
Kay Rehlich xTCA RT2012 MicroTCA.4 Timing Distribution and Power Supply Issues.
REDNet - Status overview Rok Stefanic Ziga Kroflic
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
ATCA in ATLAS meeting 16/05/2013 Evaluation results of equipment equipment PH-ESE-BE 1 Collaboration (PH/ESE) Vincent Bobillier, Matteo Di Cosmo, Stefan.
Test Plan: Introduction o Primary focus: developer testing –Implementation phase –Release testing –Maintenance and enhancement o Secondary focus: formal.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser DESY Status and Possible Controls Contributions to the ILC Kay Rehlich.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
IPMI: New MMC firmware IN2P3: DAQ working group (19/06/15) 19/06/2015IN2P3: DAQ working group (06/19)1 PH-ESE-BE collaboration Vincent Bobillier, Stefan.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
Unity Application Generator Step 7b: Generating HMI.
Possible replacement of VME Philippe Farthouat, CERN.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
3 rd xTCA IG meetingVincent Bobillier et al. 1 MMC mezzanine.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
Modular Electronics an overview of modern standards
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
Status report from PANDA Beijing Group
Design of an AdvancedTCA board Management Controller Solution
RT2010 & xTCA workshop a (personal) summary
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
CERN-IPMC Solution for AdvancedTCA Blades
Laplink PCmover.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Markus Joos CERN EP/ESE EP/ESE ATLAS CMS M. Joos, CERN
New xTCA Developments at SLAC
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
xTCA interest group meeting
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Possibilities for CPM firmware upgrade
Local Oscillator Generation - Internal.
Testing Workshop.
Presentation transcript:

The PH/ESE µTCA evaluation project a (short) status update Markus Joos CERN M. Joos, CERN13rd meeting of the xTCA IG

M. Joos, CERN3rd meeting of the xTCA IG2 Equipment purchased ManufacturerType Schroff6-slot MTCA.4 shelf (type: ) KontronKontron AM4904 MCH (with PCIe GEN2 switch ) KontronKontron AM5030 processor AMC ElmaElma AMC load module (ref.: ; single width full size) ESDADIO-24 AMC Vadatech12 slot µTCA shelf (ref.: VT ) Vadatech792W power module (ref.: UTC ) NATMCH (with PCIe GEN2 switch; NAT-MCH-Base12-GbE-SSCH- TCTCXO-PCIEx48). So far only GEN1 switch received

M. Joos, CERN3rd meeting of the xTCA IG3 Problems encountered Almost all of the commercial MCH/AMC modules that we have purchased caused some trouble Some IPMI commands not properly implemented This causes interoperability issues F/W updates required Products are not fully debugged Repairs required One shelve had to be sent back for repair One MCH has a H/W problem The quality of the documentation and the user-friendliness of the S/W tools varies a lot

M. Joos, CERN3rd meeting of the xTCA IG4 Polaris AMC tester ( This is a S/W product for Windows It can test AMC modules and carrier managers All testable rules of the AMC / MCH standard are implemented (according to Polaris) Support for MTCA.4 will be added if there is enough demand User can add tests via scripting language Polaris offer additional tools for µTCA and ATCA It communicates with the device under test via Ethernet For all AMCs (commercial and CERN design) tested we got about the same picture: 1/3 of the tests: OK 1/3 of the tests: Failed to pass 1/3 of the tests: Skipped (by operator or due to previous errors) Polaris is aware of our results and promised to fix the issues that we have identified The 28k$ question: Is it worth the money?

M. Joos, CERN3rd meeting of the xTCA IG5 Next steps Finish the work on the: MMC S/W MMC tester AMC load module First 2 boards built, more to be manufactured First look at PSUs: Parameters within spec. RTM not yet ready (MMC S/W missing) Focus on evaluation of data transfer performance (via PCIe) once an AMC with PCIe is available Resume work on PCIe hot-plug (has anyone of you got any experience?) In case we purchase the AMC tester: Re-test the AMCs/MCHs and discuss the results with the manufacturers