CSE 7315 - SW Project Management / Module 07 - Software Development Plans Copyright © 1995-2004, Dennis J. Frailey, All Rights Reserved CSE7315M07 Slide.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Using UML, Patterns, and Java Object-Oriented Software Engineering Royce’s Methodology Chapter 16, Royce’ Methodology.
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Course Technology Chapter 3: Project Integration Management.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Software Engineering Institute Capability Maturity Model (CMM)
CSSE 375 Software Construction and Evolution: Configuration Management
Chapter 24 - Quality Management
Fundamentals of ISO.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Effective Methods for Software and Systems Integration
Chapter : Software Process
CS 4310: Software Engineering
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Copyright Course Technology 1999
Chapter 2 The process Process, Methods, and Tools
N By: Md Rezaul Huda Reza n
Requirements Analysis
Software System Engineering: A tutorial
Introduction to Software Engineering LECTURE 2 By Umm-e-Laila 1Compiled by: Umm-e-Laila.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Georgia Institute of Technology CS 4320 Fall 2003.
Project Charters Module 3
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M24 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
CSE SW Project Management / Module 24 - Additional Software Plans Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M24 Slide.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M16 - Version 8.01 SMU CSE 7315 Planning and Managing a Software Project.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
February 15, 2004 Software Risk Management Copyright © , Dennis J. Frailey, All Rights Reserved Simple Steps for Effective Software Risk Management.
Copyright © , Dennis J. Frailey, All Rights Reserved Day 4, Part 1, Page 1 1/11/2004 Day 4, Part 1 Software Development Plans.
CSE SW Project Management / Module 15 - Introduction to Effort Estimation Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M15.
CSE SW Project Management / Module 25 - Risk Management Overview Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M25 Slide.
January 20, 2000 CSE SW Project Management / Chapter 8 - Detailed Planning - The Software Dev. Plan Copyright © , Dennis J. Frailey, All.
CSE SW Measurement and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M15 version 5.09Slide 1 SMU CSE.
CSE SW Project Management / Module 10 - WBS Construction Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M10 Slide 1 January.
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M13 8/20/2001Slide 1 SMU CSE 8314 /
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M37 8/20/2001Slide 1 SMU CSE 8314 /
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Copyright , Dennis J. Frailey CSE Software Measurement and Quality Engineering CSE8314 M00 - Version 7.09 SMU CSE 8314 Software Measurement.
CSE SW Project Management / Module 30 - Managing with Earned Value / Measurement Issues Copyright © , Dennis J. Frailey, All Rights Reserved.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M15 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
Copyright © , Dennis J. Frailey, All Rights Reserved Day 1, Part 2, Page 1 4/19/2003 2) Analyzing the Job to be Done.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
CSE SW Project Management / Module 11 - Overview of Size Estimating Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M11 Slide.
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M02 8/20/2001Slide 1 SMU CSE 8314 /
The Project Management Process Groups
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M07 - Version 8.01 SMU CSE 7315 Planning and Managing a Software Project.
Advanced Software Engineering Dr. Cheng
Chapter 11: Software Configuration Management
Software Planning Guidelines
IS442 Information Systems Engineering
Defining the Activities
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Project Management Process Groups
Chapter 11: Software Configuration Management
Presentation transcript:

CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M07 Slide 1 Auygust 10, 2004 SMU CSE 7315 / NTU SE 584-N Planning and Managing a Software Project Module 07 Software Development Plans Part 1

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 2 Objectives of This Module To introduce the concept and role of a software development plan To discuss the contents of a software development plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 3 Warning from Dilbert “There are two major steps to building a business plan: 1. Gather information 2. Ignore it” Adams, The Dilbert Principle “There are two major steps to building a business plan: 1. Gather information 2. Ignore it” Adams, The Dilbert Principle

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 4 Your plan consists of virtually everything you produce as a result of planning

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 5 “software development plan” definition “The accumulation of all plans and related artifacts generated during the planning process” Prototype Final Design Build Design Prototype Final Design Build Design Prototype Final Design Build Design Prototype Final Design Build Design Prototype Final Design Build Design Prototype Final Design Build Design Prototype Final Design Build Design CodeDesignTest Build DeliveryContract Prototype Final Design Build Design Prototype Final Design Build Design technical interchanges contract issues legal issues

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 6 Your Plan is a document containing a selected group of the principal planning artifacts

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 7 “Software Development Plan” definition “ A document describing the principal plans for developing software ”

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 8 The Plan within a plan Software Development Plan (formal document) software development plan Software Standards and Procedures WBS Policies Facilities Estimates Staffing plan Schedule

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 9 Why Create a Formal Software Development Plan? To help you manage the project AND To show others that you can manage the project

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 10 To Show that You Can Manage the Project... The Plan demonstrates that sufficient planning has been done The Plan shows that you understand the project, the problem, the risks, the criteria for completion, the methods for developing software, and the customer expectations

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 11 To Help You Manage the Project... The Plan forces you to answer questions that might otherwise be left unanswered How will we set up our software library? How will we track progress on the data base development?

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 12 To Help You Manage... The Plan communicates your plans to concerned parties - your staff, other organizations, subcontractors It provides a common framework from which all participants can make their individual plans

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 13 To Help You Manage... The Plan documents assumptions, contractual understandings, mutual agreements, etc. It helps you to remember what you planned It helps you manage risks by recording your rationale, backup plans, expectations, etc.

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 14 Don’t Overdo the Formal Plan The formal Plan should contain … … a guide to the software development approach … a guide to your management approach... information that is not likely to change frequently during the project … information that is necessary to evaluate and understand your plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 15 The exact content of the formal Plan will depend on specifics of your contract, organization, project size, customer, management style, etc. The Formal Plan Should Not Contain... … detailed information about the product’s technical characteristics, architecture, or design approach … detailed schedules, cost estimates, etc. … excessive detail about the process and methods you will use, especially if it is likely to change often

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 16 The Formal Plan is like the Textbook for Your Project You learn from it You use it to teach new employees all about the project You refer to it from time to time But most people do not use it on a daily basis You don’t have to develop a new Plan from scratch for each project. You may have a Plan that fits many similar projects.

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 17 The Formal Plan Should Cover... … a little about the product – A summary that shows its characteristics, components, and performance goals … more about the project – Focusing on organization, structure, and management … a lot about the process – In detail, including all aspects of how software will be developed and managed

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 18 A Checklist for an SDP

CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M07 Slide 19 Auygust 10, 2004 Where Does This Information Come From?

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 20 Job Analysis Initial Planning Plan Description Sources of Information Most of the description information comes from analysis of the job and Initial Planning (covered in earlier modules in this course)

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 21 Risks are identified throughout the planning process Risk management is addressed in a later module Sources of Information (continued) Manage Risks Define the Approach Generate Detailed Plans Understand the Need Execute and Monitor

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 22 Sources of Information (continued) Other planning information comes from detailed planning......which will be covered in upcoming modules and from planning for project execution... … which is covered in later modules

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 23 Tracing the SW Development Plans to the Source Documents We will learn in future modules to trace the detailed plans to source documents. – We can trace to the plans as well DocumentParagraphDescriptionSDP SOW1.3.4Design Software for Compiler2.4.3 SOW2.3.3Travel for Design Reviews1.7, A-3... Contract aFollow ISO Standard 5432fSSPM Rqmts. Doc.3.4Use data compression A-2... CustomerMtg. on 3/5/95Code all software in C++1.2, SEE

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 24 Advantages of a Trace to the Software Development Plan You can easily show how your plan relates to the job to be done You can justify plan components by tracing to project requirements You can assure that you have planned all major tasks of the project

CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M07 Slide 25 Auygust 10, 2004 Detailed Review of the Contents of a Software Development Plan Product Information Project Information Process Information

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 26 Product Information - The Application and the System A summary description of the application and the system, such as: – Scenarios describing system use – An overview of the architecture, including the major components – Processors and their functions – Brief discussions of the technologies involved or any unusual aspects – Summary of any key performance objectives and system constraints

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 27 Product Information - The Software For each software product – Its type and characteristics – Its function, in relation to the other software and the rest of the system – Its architecture, including the major software components and interfaces – Processor(s) and other system elements the software will use – Programming language(s) – Rough size estimate

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 28 We will discuss more about measurements and threshold values in later modules and other courses. Product Information - Risk Management and Measures Key risks or performance goals For each risk or performance goal (such as speed, memory size, etc), identify – Objectives, constraints and concerns – Measures you will use to monitor – Threshold values requiring management action

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 29 Anything that tells you whether the product is likely to meet its performance requirements or encounter significant risks Sample Product Measures How fast the software is expected to run Unused processing capacity Memory size I/O channel or network utilization

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 30 Project Information - General The nature of the project – Type of contract, if any – Source of funding – Reporting structure – Interfaces with customer Logistics – Location(s) of organizations – Facilities you will use – Security considerations, if any

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 31 Project Information -Schedule Lifecycle model, if any Integrated master plan (at a summary level - major tasks to be performed) Integrated master schedule – Major milestones and goals – Top level schedules for major tasks – Key reviews and milestones or gate points

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 32 Project Information - Organization Organizational breakdown structure – Key roles and responsibilities – Reporting structures within the project – Key relationships and communication paths – Skills required for key roles Work breakdown structure (modules 9, 10) Subcontract and co-contract relationships (if applicable)

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 33 Project Information - Risk Management and Measures Key risks and project goals should be identified For each risk or goal, indicate: – Objectives, constraints and concerns – Mearures you will use to monitor – Threshold values requiring management action

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 34 Anything that tells you whether the project is likely to meet its cost, schedule, or other goals Sample Project Measures What work tasks are complete (such as requirements defined, modules designed, units coded or tested) – Compare with plans Expenditures of effort or funds – Compare with budgets Unplanned turnover rates

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 35 Process Information This forms the bulk of the content of a formal software development plan. Typical information includes: Methods and processes for software development, evaluation and testing Milestones and reviews Subcontractor management methods Tools to be used

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 36 Additional Process Information Reuse plans and approaches Process improvement techniques Risk analysis and management techniques Structure and procedures of software development libraries Processes for support activities such as quality assurance and configuration management

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 37 Process Information is Identified Throughout the Project Much of it can be established during planning, at least at a high level But many of the details are typically not fully worked out until the project is underway And such details are not necessary to understand your plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 38 Process Information - Risk Management and Measures Key risks and process goals should be identified For each risk or goal, indicate: – Objectives, constraints and concerns – Measures you will use to monitor – Threshold values requiring management action Some process measures are used to identify the causes of project and product problems

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 39 Anything that tells you whether the process is being followed correctly or is achieving its objectives Sample Process Measures How well we are finding problems during inspections and reviews Defect levels and defect correction levels Amount of rework due to errors

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 40 Typical Plan Appendices or Supplements Project-specific standards, detailed procedures and methods – Often found in an SSPM (software standards and procedures manual) Detailed schedules and estimates Shoploads Specific assignments of people and resources to tasks Details of SW engineering environment (SEE)

CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M07 Slide 41 Auygust 10, 2004 Additional Information on Specific Plan Contents... … will be discussed in more detail in module 08 and later modules of the course

CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M07 Slide 42 Auygust 10, 2004 Maintaining an Effective Plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 43 Many Organizations Have Defined Standards for Software Development Plans DOD-STD-2167a Mil-STD-498 ISO/IEC Your industry Your company Your organization...

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 44 Why Use a Standard Format for the Plan? It tells you all the right questions It helps others know where to look for the answers Example: the standard formats for assignments in this course help you know what to turn in and help me evaluate them efficiently

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 45 Drawbacks of a Standard Format for the Plan May be overly restrictive May not fit new approaches or concepts May encourage “boilerplate” mentality when developing or using plans

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 46 The Plan is Static -- Planning is Dynamic You rarely follow the plan exactly as written As you progress, you learn more Keeping the plan up to date keeps everyone synchronized and reduces the chances of miscommunication, etc. Initial Planning etc. initial plan Periodic Review and Update revised plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 47 You Learn More Every Day Plans need to reflect what you know today... … not what you didn’t know when you wrote the plan. Plans need to reflect what you know today... … not what you didn’t know when you wrote the plan. Build time in your schedule for periodic updates of your estimates and plans

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 48 Be Sure to Coordinate and Communicate Plan Changes Some software managers change their plans without notifying affected parties This can lead to chaos So it’s worth the trouble to coordinate changes and communicate them effectively Don’t change too frequently or people will not take the time to pay attention to changes

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 49 Beware of Bureaucrats It is a good idea to have an approval process for plan changes But some customers or managers have instituted a slow, burdensome bureaucracy for approval of plan changes that impedes effective plan updates People who must approve changes to the plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 50 Dealing with the Realities of Bureaucratic Change Approvals Avoid excessive detail in the Plan – put it in a supplement Incorporate plans for changing the Plan Maintain “duplicate” plans – Formal, approved plan (high level) – Working, dynamic plan (more specific) Establish trust with customers by keeping commitments

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 51 Summary The Software Development Plan serves many roles – Communicates your plans – Helps you plan – Shows you know how to manage the project The formal Plan is supplemented by many other plan elements

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 52 Summary (continued) Planning forces you to think Documenting your plan helps you avoid glossing over issues that need to be pinned down Plans must be maintained and used Plan changes must be communicated A standard Plan is like a checklist to make sure you have included everything in your Plan

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 53 END OF MODULE 07

CSE7315M07 Auygust 10, 2004 CSE SW Project Management / Module 07 - Software Development Plans Copyright © , Dennis J. Frailey, All Rights Reserved Slide # 54 References Donaldson, Scott E. and Stanley G. Siegel, Cultivating Successful Software Development, Prentice-Hall, 1997, Chapter 2. Department of Defense, Defense System Software Development, Dod-STD 2167A, 29 Feb. 1988, Department of Defense, Washington D.C., Reifer, Donald, Tutorial: Software Management, IEEE Computer Society