VendorsCore BusOption 1Option 2Option 3Option 4Option 5 Ball Aerospace & Technologies Corp BCP 2000- General Dynamics 300SMission Operations 300HPMission.

Slides:



Advertisements
Similar presentations
Introduction to the Global Positioning System
Advertisements

HRA INCOSE Chapter February 2008 Meeting: Presentation: Using Fault Trees for System Safety and Risk Management Applications Presented by: Melissa Jones,
Unit 3, Chapter 9, Lesson 9: Space Systems Engineering 1 The Systems-engineering Process Trading Requirements We use the requirements loopa necessary and.
OFFICE OF THE CHIEF TECHNOLOGIST 2 Space Technology Program – Overview Possible Solution Possible Solution Idea Possible.
Dave Ector COSMIC PM for OSD 4 November 10
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Welcome to the Aerospace Educator Workshop Saturday, March 8,
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Advanced Multimission Operations System (AMMOS)
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
ISIS Turnkey Missions ISIS designs, manufactures, launches and operates affordable, capable, nanosatellites ISIS provides turnkey missions for institutional,
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
Icarus Student Satellite Project Hannah Goldberg Dr. Brian Gilchrist BT Cesul Student Space System Fabrication Lab (S 3 FL) University of Michigan, College.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
Icarus Student Satellite Project
1 UNITED SPACE ALLIANCE The Space Operations Company sm.
NASA Office of Small Business Programs where small business makes a big difference NEW OPPORTUNITIES FOR SMALL BUSINESS National 8(a) Conference.
Defense Contract Management Agency (DCMA) Brief Presented By: Mr. Syd Pope Director, Contract Tech Ops March 07, 2002.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Modernization and GPS III Southern California Section ION Meeting 11 March 2009 Lt Col David Goldstein, US Air Force Chief Engineer GPS Wing This briefing.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
NASA Office of Small Business Programs where small business makes a big difference GODDARD CONTRACTOR'S ASSOCIATION MEETING January 20, 2015.
1 NASA Earned Value Management Update August 2006.
2007 Commercial GSO Demand Forecast May 2007 Beth King COMSTAC Technology & Innovation Working Group Cover art by John Sloan/FAA 2007.
GSFC 5 Space Technology “Tomorrow’s Technology Today” ST5 PDR June 19-20, 2001 Launch Vehicle Services Section 18.0 Clyde Woodall Launch Vehicle Manager.
Developing a Space-Focused Systems Engineering Curriculum W. Fowler The University of Texas at Austin Texas Space Grant Consortium L. Guerra Exploration.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Kennedy Space Center Spaceport Engineering and Technology.
September 20th TJ Faculty Presentation 2006
2008 Non-Geosynchronous Orbits Commercial Space Transportation Forecast John Sloan Federal Aviation Administration Office of Commercial Space Transportation.
National Aeronautics and Space Administration Checklists and Testing Systems.
Kayser Italia S.r.l March 2006 INFN LNF - Frascati Kayser Italia’s Experience on payload developments and flight opportunities for space research.
2006 Commercial GSO Demand Forecast May 2006 Lisa Hague COMSTAC Technology & Innovation Working Group Cover art by John Sloan/FAA.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Manager Date: May 15, 2008 Federal Aviation Administration Federal.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
GLOBAL POSITIONING SYSTEM (GPS) CONSTELLATION STATUS December 1999 Captain Zannis Pappas HQ Air Force Space Command (DORS)
Commercial Space Commercial Space Industries Launchers Cargo vehicles Crew vehicles Space tourism Communications and operations satellites Exploration.
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Institute for Space Systems Analysis and Design College of Engineering Virginia Tech College of Engineering Virginia Tech Chris Hall Aerospace and Ocean.
EarthKam Discoveries Ben Pike and Jake Martin B Period.
MALAYSIA IN SPACE NATIONAL SPACE AGENCY VISION Harnessing space as a platform for knowledge generation, wealth creation and societal well-being.
Commercial Space Transportation: Risk, Liability and Insurance By Pamela L. Meredith Zuckert Scoutt & Rasenberger, L.L.P Abu Dhabi, April 16, 2009.
Competition Sensitive Gabe Karpati June 28, 2001 SuperNova / Acceleration Probe (SNAP) System Overview.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
STAR ONE C1 - Insurance Presentation
Contracting 101 Federal Supply Service February 16, 2005.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
Presented to: NDIA By: Keith Kratzert Date: February 1, 2006 Federal Aviation Administration Improving Program Performance at FAA.
This document contains proprietary and controlled information of National Space Organization (NSPO) of Taiwan and shall not be duplicated in whole or in.
AAE 450 – Spacecraft Design 1 Attitude Determination Methods Brienne Bogenberger January 18, 2004 Dynamics & Control Group Lead, Attitude Determination.
Ball Aerospace & Technologies Corporation -
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Mission Design Options CLARREO Formulation Team July 9, 2010.
Technical Resource Allocations
Earned Value Management
Level 2 Requirements (MRD)
TEMPO’s Commercially Hosted Payload Concept
NAVAL POSTGRADUATE SCHOOL
Advance Exploration Programs, Thales Alenia Space in Italy
Mark Suder
DoD MAINTENANCE CONTRACTORS
USGS Status Steve Labahn, USGS EROS CEOS LSI-VC-7 Agenda Item 8.0
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Low Power Wide Area Network.
MARS Update – WIRA -February 23, 2018
Luxembourg Workshop on Space and Satellite Communication Law,
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

VendorsCore BusOption 1Option 2Option 3Option 4Option 5 Ball Aerospace & Technologies Corp BCP General Dynamics 300SMission Operations 300HPMission Operations Lockheed MartinLMx- Northrop Grumman EAGLE-0EAGLE-1EAGLE-2 Orbital Sciences Corp LEOStar-2- Surrey Satellite Technology US LLC 150 Enhanced X-Band Txmr Antenna Pointing Mech Enhanced RWAGround Station 300 Enhanced X-Band Txmr Antenna Pointing Mech Enhanced RWAGround Station 600 High Speed Data Rcdr Enhanced X-Band Txmr Antenna Pointing Mech Enhanced PointingGround Station Thales Alenia Space France Proteus- Thales Alenia Space Italy PrimaPrima - Small Prima - Advanced C&DH Prima - High Agility DRAFT RAPID III CORE SPACECRAFT & OPTIONS

Vendors Core Spacecraft Spacecraft Delivery (Mos.) Spacecraft Lifetime (Yrs) Spacecraft Dry Mass (kg) Payload Mass (kg) Payload Power (W) Pointing Accuracy (Arcsec) Comm Sys Band System Redundancy Ball Aerospace & Technologies Corp BCP S, XFully General Dynamics 300S S, XSelective 300HP S, KuSelective Lockheed Martin LMx SFully Northrop Grumman EAGLE SSelective Orbital Sciences Corp LEOStar SFully Surrey Satellite Technology US LLC SSelective SSelective S, XSelective Thales Alenia Space France Proteus SSelective Thales Alenia Space Italy Prima SSelective Overall Summary S, X, Ku Selective, Fully DRAFT RAPID III CORE SPACECRAFT AND CAPABILITIES SUMMARY

RAPID IIRAPID III CONTRACT TYPE FAR Part 12 – commercial acquisitions (streamlined), fewer procurement processes & reporting FAR Part 15 – normal procurement processes & reporting DELIVERY ORDER VARIATIONS Fixed Price only Fixed Price & Fixed Price w/Performance Incentives EARNED VALUE MGMT No Requirement (pre-EVM) Requirement waived by NASA for fixed- price contracts/delivery orders NASA MAR - Mission Assurance Rqmts. GOLD RULES - Engineering Best Practices GEVS - GSFC Environmental Verification Specification MAR/Gold Rules/GEVS applied at delivery order level only MAR/Gold Rules/GEVS applied at master contract & delivery order levels REFUND/REPLACEMENT CLAUSE Yes. Vendors bought insurance to cover risk of loss. Delivery order price included cost of insurance. No. MAR (Gov’t Quality Assurance Program) serves as insurance. Gov’t assumes risk of loss. MISSION-SPECIFIC NON-STANDARD SERVICES Launch vehicle services – could be purchased by vendor No launch vehicle services in Rapid III ; Purchased separately by customer CORE SPACECRAFT Must have successfully completed launch vehicle I&T to get into catalog Must have successfully completed on- orbit checkout & acceptance to get into catalog. Vendor must have 2 prior spacecraft developments thru on-orbit checkout & Acceptance. RAPID II vs. RAPID III