Training Module 10 Project Management Prepared by RCAP Solutions for the PA Department of Environmental Protection.

Slides:



Advertisements
Similar presentations
Quality and Outcomes Framework Assessor Training Skills in note-making, summarising and report writing Module S5.
Advertisements

Roles & Responsibilities in Construction Management
RFP, Proposal and Contract IF – UNS. 10 steps in Procurement Process 1.An RFP is released 2.Proposal Meetings and Conferences 3.Forming a Proposal Teams.
STUDENT ORGANIZATION TRAINING FINANCE MODULE 4 – PERSONAL SERVICES AGREEMENTS Effective January, 2015.
Sanitation is Business
SURVIVING YOUR PROCUREMENT CODE’S REQUIREMENTS
Courtesy of: The Journey to Your Own Home Made simple… By: Multicultural Marketing Division.
Chapter 2 Analyzing the Business Case.
Our Vision – Healthier Kansans living in safe and sustainable environments.
FAA 29th ANNUAL AIRPORT CONFERENCE. Presenter’s Background Structured Design Unstructured Design Design Activities Special Concerns Lessons Learned Benefits.
General Services Division / Project Administration FINAL INSPECTION AND ACCEPTANCE “It ain’t over till it’s over.” (Yogi Berra)
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
STUDENT ORGANIZATION TRAINING PERSONAL SERVICES AGREEMENTS Effective January, 2015.
Provider Training Request for Proposal Spring 2000 Bureau of Contract Management Department of Human Services.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Requirements Analysis 2. 1 Req. Capture b502.ppt © Copyright De Montfort University 2000 All Rights Reserved INFO2005 Requirements Analysis Requirements.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Connecticut Department of Energy and Environmental Protection.
WRITING THE ClASS REPORT
1 Construction Planning and Management: Tanya Vartivarian Director of School Services IFF June 2010.
English 212: Technical Writing Shayla Scott.  Introduction  Criteria  Methods  Research Results  Conclusions  Recommendations.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
LESSONS ENTREPRENEURSHIP: Ideas in Action© SOUTH-WESTERN PUBLISHING Chapter 2 SELECT A TYPE OF OWNERSHIP An Existing Business A Franchise.
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
Effectively Managing Your Water System Project Rural Community Assistance Partnership Practical solutions for improving rural communities © 2012 All rights.
Welcome to your music business. So what do you need to do to get started? PLAN & ORGANISE Otherwise you may never get started and even if you do, the.
Project Management Details Proposals and Contracts Schedules Budgets Key Practices –Hiring –Firing –Pay administration –Promotion.
Contractors & contracts
Space Planning ABLE: Administering Better Libraries – Educate Module 3.
Additional Structure Exercise 2 ANSWERS NB. As not whole case study was given some of these answers may not be within the text.
Chapter 3.2: How Government Promotes Economic Strength
Go SOLAR Broward Rooftop Solar Challenge. What is Go SOLAR Broward Rooftop Solar Challenge? U.S. Department of Energy Grant Broward County and 14 partner.
THE SUCCESSFUL INTERVIEW A step by step guide to navigating the interview process.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
STUDENT ORGANIZATION TRAINING FINANCE MODULE – EVENT PLANNING & CONTRACTING Effective July 14, 2015.
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
EXAMPLE – Quality Control Plan For Consultants
Is Your JOC Program Audit Worthy? z Scott Creekmore.
Training Module 7. What You’ll Learn In This Module In what areas may Conservation Districts enter into a contractual agreement with Michigan Department.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
Reimbursement Statements What you need to know. Let’s Take a Closer Look… …at invoicing, cost ledgers, SB and budget revisions.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Writing your first budget. General Rules Follow instructions Read guidelines Be realistic Be honest.
Innovative Solutions for tomorrow’s transportation needs Local Agency Program Performance Measures, Project Scheduling, and Efficient Project Delivery.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Keeping Control of the Money January Introduction. The National Member Services Committee has developed a series of National Education Seminars.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Getting Your Project Started Chapter 1 © 2014 by John Wiley & Sons, Inc.
Agency Construction Management :CM NOT AT-RISK
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
A WEALTH OF INFORMATION REHAB / REPAIR. CONTRACTORS ADVICE CALL HIM - DON’T YOU PREPARE FOR PHONE CALL DO NOT CALL WHILE DRIVING “TAKE NOTES!” CALL.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Self Determination Statewide Self Advocacy Network Adapted from information by Regional Offices 10 & 4. 11/20/15.
Presentation to Provost’s Department Chairs Leadership Program Suzanne Bardouche November 29, 2007.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Grants at Tyler Junior College. Presenters Fred M. Peters, Director, Public Affairs & Grant Development Daniel Pippin, Grants.
Travel or Conference Training Sponsored by Classified Senate.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Monitoring and Evaluation Systems for NARS Organizations in Papua New Guinea Day 5. Session 14. Work Plan and Budget for M&E.
Municipal Class Environmental Assessment
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Springbrook Estates Sewer Improvement Area Informational Meeting
DTF implementation Roles and responsibilities
Construction Management Services April 16, 2018
Presentation transcript:

Training Module 10 Project Management Prepared by RCAP Solutions for the PA Department of Environmental Protection

1 Introduction What to expect before a project What to expect before a project General process of project management General process of project management Avoiding pitfalls and problems Avoiding pitfalls and problems

2 Need for a Water System Do you need a water system? Do you need a water system? A project must be justified A project must be justified

3 Need for a Water System Justifications include: Justifications include: –Pollution –Quality/Quantity issues –Poor fire service –Promote growth –Complaints

4 Administrative None of those mean you need a system but you should investigate further None of those mean you need a system but you should investigate further Iron out some admin details Iron out some admin details

5 Administrative Contact a TA provider Contact a TA provider Free or low-cost assistance Free or low-cost assistance

6 Administrative Business Planning Business Planning A long range plan A long range plan Required to obtain a permit Required to obtain a permit

7 Administrative The Business Plan must address a number of issues The Business Plan must address a number of issues

8 Administrative The Business Plan must include: The Business Plan must include: –Facilities Plan –Management Plan –Financial Plan

9 Administrative Consider forming an authority Consider forming an authority Passing ordinances Passing ordinances Can be concurrent with the feasibility study Can be concurrent with the feasibility study

10 Feasibility Study Engineering report addressing specification issues Engineering report addressing specification issues Will likely have to hire an engineer Will likely have to hire an engineer

11 Feasibility Study RFP RFP Does NOT have to be competitively bid Does NOT have to be competitively bid Interview and ask questions Interview and ask questions

12 Feasibility Study Confirms the need for a water system Confirms the need for a water system Firm does not necessarily do the design later Firm does not necessarily do the design later Make sure EDU count is accurate Make sure EDU count is accurate

13 Feasibility Study Includes info useful for the Business Plan Includes info useful for the Business Plan Should include ALL costs Should include ALL costs The study costs MONEY! The study costs MONEY!

14 Funding You have to pay for the feasibility study for almost everything else from here on out You have to pay for the feasibility study for almost everything else from here on out It gets even more expensive! It gets even more expensive! But, help is available! But, help is available!

15 Funding Many funding options Many funding options All have advantages and disadvantages All have advantages and disadvantages

16 Funding Combine funding sources Combine funding sources Income surveys Income surveys

17 Exercise 1 Take a few minutes to complete the exercise in your workbooks Take a few minutes to complete the exercise in your workbooks

18 Design and Permitting Can be started concurrent with funding applications Can be started concurrent with funding applications Can do another RFP for design Can do another RFP for design Be careful to adhere to funding requirements, if applicable Be careful to adhere to funding requirements, if applicable

19 Design and Permitting Design will finalize many issues Design will finalize many issues Make sure your engineer stays on schedule Make sure your engineer stays on schedule

20 Design and Permitting DEP review and approval DEP review and approval Can be a lengthy process Can be a lengthy process Don’t forget your Business Plan! Don’t forget your Business Plan!

21 Design and Permitting Ownership of drawings Ownership of drawings Your input is important! Your input is important!

22 Construction Competitive bids Competitive bids Numerous requirements of the bidding process Numerous requirements of the bidding process

23 Construction Keep an eye on the contractors Keep an eye on the contractors Written change orders Written change orders Inspections Inspections

24 Construction Doesn’t happen overnight Doesn’t happen overnight As-built drawings As-built drawings

25 Start-Up and Operations Address some items during construction Address some items during construction Office set-up Office set-up Staff Staff

26 Start-Up and Operations Tap-fee Tap-fee Rate structure Rate structure Assistance is available Assistance is available Funding source may have input Funding source may have input

27 Start-Up and Operations Budgets Budgets Tap-fees only happen once! Tap-fees only happen once!

28 Start-Up and Operations Help with budgets Help with budgets May be required May be required Include reserves Include reserves

29 Start-Up and Operations Ensure a quality product Ensure a quality product Sampling is required Sampling is required In-house or contracted testing In-house or contracted testing

30 Exercise 2 Take a few minutes to complete the exercise in your workbooks Take a few minutes to complete the exercise in your workbooks

31 Summary Key points Key points

32 Resources and References Dennis Lee, PA Department of Environmental Protection Dennis Lee, PA Department of Environmental Protection Don Schwartz, PA/NJ Program Manager, RCAP Solutions Don Schwartz, PA/NJ Program Manager, RCAP Solutions Other training modules Other training modules