C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.

Slides:



Advertisements
Similar presentations
HOLDEN HEIGHTS PHASE IV FY Budget Worksession July 21, 2008.
Advertisements

CORPS OF ENGINEERS DREDGING INFORMATION n Corps of Engineers Dredging Information System (DIS) n Tracks Corps Performed and Contracted Dredging n Pre-bid.
Pasadena Water and Power Contract with R C Foster Corporation to Provide Seismic Upgrades to Sheldon Reservoirs 1 and 2 City Council March 12, 2012.
Capital Improvement Program Overview November 3, 2011.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
US Army Corps of Engineers BUILDING STRONG ® West Onslow Beach/ Topsail Beach West Onslow Beach/ Topsail Beach Coastal Storm Damage Reduction Project Town.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
FY Budget Presentation to Board of Finance March 26, 2014 LAND USE BUREAU Norman Cole, Bureau Chief.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting December 19, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Professional Engineering Procurement Services Division Solicitation No. 15-5RFP5004 Donella Drive Improvements Project Status Presented By: Kyle Gass,
FARMWORKER ASSOCIATION BUILDING BCC Presentation October 02, 2007 BCC Presentation October 02, 2007.
FY11 Budget Presentation 1 May SWEETWATER SPRINGS WATER DISTRICT Review of the FY10 (Current Year) Budget No Big Surprises (Well, Filter Rehabilitations)
The Dori Slosberg Driver Education Safety Act October 21, 2014.
STATE ROAD 100 CRA Update to City Council November 13, 2012 Workshop.
FY Budget Presentation to Board of Finance March 17, 2014 Brennan Golf Michael Sullivan Golf Course Superintendent.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
SUCCESSFULLY PREPARING ALL STUDENTS FOR THEIR FUTURES SE 256 TH STREET, KENT, WA | BUDGET Public Hearing and Budget.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Building Division FY2011 Second Quarter Report. 2 nd Quarter Revenues October$93,154 November$53,049 December$50,033 Average Monthly Revenues$65,412 Total.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
So what is this thing called a school bond?. What are bonds? Bonds for school projects are very similar to a mortgage on a home. To finance construction.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Las Cruces International Airport RESOLUTION A: A RESOLUTION APPROVING THE AWARD OF A CONTRACT FOR DESIGN THROUGH BIDDING PHASE SERVICES FOR AN.
ORANGE COUNTY ANNUAL BUDGET AMENDMENT FY Public Hearing January 26, 2010.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Pasco County “Budget 101” OFFICE OF MANAGEMENT & BUDGET.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
Sun City Lift Station Odor Control Improvements
Robinson Park Recreation Center Renovation
CITY OF NEW SMYRNA BEACH
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Cottonwood Recycled Water Pipeline (West)
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Reach 4 Air Valve Replacements Award of Construction Contracts
PPL1.6 Pumping Plant Project Overview
Student Transportation Services
CRA Refinancing CRA Refinancing.
Independent School District No. 318 December 3, 2018
Barbour County Board of Education
M E A S U R E ‘G’ P R O G R A M U P D A T E
Octorara Area School District
Ward Park Restroom Timeline
Authorizing ED to Reject Bid for Contract P01005C10
Design and Engineering Services
Presentation transcript:

C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering & Construction Bureau Chief Governing Board Meeting December 12, 2013

C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall

Bid Summary  RFB Advertised: October 15, 2013  Bid Opening: November 15, 2013  Number of Bids received: 8  Bid Range: $1,120,000 – 2,223,000  Engineer’s Estimate: $1,429,549 to $1,580,028

Resolution  A Resolution of the Governing Board of the South Florida Water Management District to authorize entering into a 358 day contract with Arbor Tree & Land, Inc., the lowest responsive and responsible bidder, for C-4 Canal Bank Improvements Belen Phase 2, Flood Protection Berm & Wall Project, in an amount of $1,360,250.00, for which $1,110, in ad valorem funds are budgeted in FY14 Engineering & Construction Bureau's capital improvement program and the remainder is subject to the Governing Board approval of the FY15 budget; providing an effective date.