US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.

Slides:



Advertisements
Similar presentations
Utilizing GIS in US-Mexico Border Fence Construction
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
CORPS OF ENGINEERS DREDGING INFORMATION n Corps of Engineers Dredging Information System (DIS) n Tracks Corps Performed and Contracted Dredging n Pre-bid.
Statewide Construction Database (SCD) Florida Department of Transportation Production Management Office June 29, 2006.
US Army Corps of Engineers BUILDING STRONG ® Adult Outplant Site Improvement Update Jeremy Appt Technical Lead CENWP EC-DG David Leonhardt CENWP PM-E July.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY 11 LARGE GROUP RESPONSE EXERCISE.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
December 22, :30 to 2:30 PM Transportation Laboratory Auditorium 5900 Folsom Boulevard Sacramento, CA Hector Romero, P.E. Senior Transportation.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
AIWW Deep Creek Bridge Replacement Information Update
US Army Corps of Engineers BUILDING STRONG ® West Onslow Beach/ Topsail Beach West Onslow Beach/ Topsail Beach Coastal Storm Damage Reduction Project Town.
EEP Data Flow Kevin H. Miller CVS-EEP Vegetation Monitoring Workshop Wake Technical Community College Northern Campus June 9, 2009.
History of Civil Engineering at Kansas State University The Kansas Transportation Engineering Conference Connection.
HYDROLOGY FOR ENGINEERING MANAGEMENT MSc
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
The Transcontinental Railroad The Idea The Construction The People Involved.
1 CALTRANS / UNION PACIFIC RAILROAD Staying on Track Partnering Update JUNE 6-7, 2007 Presented by CALTRANS - Bimla Rhinehart UPRR - Jerry Wilmoth Tab.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
SONOMA COUNTY REAL ESTATE MARKET UPDATE June 2014 through June 2015 Courtesy of Pacific Union.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
SONOMA COUNTY REAL ESTATE MARKET UPDATE December 2013 through December 2014 Courtesy of Pacific Union International.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
US Army Corps of Engineers BUILDING STRONG ® JOINT FEDERAL PROJECT UPDATE for SAFCA Board US Army Corps of Engineers Pam Amie 19 May 2011.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Innovative Solutions for tomorrow’s transportation needs Local Agency Program Performance Measures, Project Scheduling, and Efficient Project Delivery.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
US Army Corps of Engineers BUILDING STRONG ® Mitigation and Conservation Bank Approval in Northern California Kate Dadey Chief, CA Delta Branch Sacramento.
US Army Corps of Engineers BUILDING STRONG ® Debris Management Mobile District.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – June 2007 Construction Workshop 26 June 2007.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District Nationwide Permit Overview Cindy House-Pearson Chief, Inland.
US Army Corps of Engineers BUILDING STRONG ® Mid-Columbia River Projects and Large Spill Events Ken Duncan Portland District PM Environmental Compliance.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
HDR | Presentation Update to Flood Project Working Group Shawn Gooch, P.E. City of Sparks February 27, 2008 North Truckee Drain Relocation Project.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
BoldLeads - Bold Leads Real Estate Reviews
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Proposal for Amending Existing County Commission Districts.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
US Army Corps of Engineers BUILDING STRONG ® Savannah SAME Post South Atlantic Region Program Review 15 June 2016 LTC Landon Raby Deputy District Engineer.
Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.
I-15 North Phase 4 Preliminary DRAFT CRA Results July 2014
Town of Brighton, Department of Public Works
Pryor Creek Trail - Phases 1A & 1B Pryor Creek, OK
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
South 6th Street 6th Avenue 5th Avenue
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
* 07/16/96 Steve Price, *
Richland Creek Water Supply Program Program Update
Authorizing ED to Reject Bid for Contract P01005C10
Design and Engineering Services
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
FLAGLER COUNTY, FLORIDA
Presentation transcript:

US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento Streams Group Sacramento District July 21, 2011

BUILDING STRONG ®

Morrison Creek Construction Along Union Pacific Railroad  Contract will be advertised for bids on July 22,  SAFCA is working with UPRR to obtain real estate.  Construction will not start until May 1, 2012 due to Endangered Species Act compliance.

BUILDING STRONG ® Post Authorization Change Report (PACR)  Floodplain determination work is on-going.  Reviewing County General Plan with County staff to determine future hydrology.  PACR is scheduled to complete in July 2014.

BUILDING STRONG ® Marshall Marik US Army Corps of Engineers 1325 J Street Sacramento, CA (916) Marshall Marik US Army Corps of Engineers 1325 J Street Sacramento, CA (916)